← Back
Over six families without stores
542 WEST 159 STREET
MANHATTAN · BIN 1062750
💬 Discuss this project
1913Year Built
5Stories
C1Building Class
R7-2Zoning
12,465 sfGross Floor Area
15Units
Rent Stabilized8 Open Violations ▸
Over six families without stores · Owner of record: CLOTH SCATTERED SITES HOUSING DEVELOPMEN T FUNDCORP · 3,747 sf lot · 3.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingLandscape
Roof3p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO CONTRACTING NY407/08/2026
COMMUNITY LEAGUE OF THE HEIGHTS1403/22/2026
CLOTH SCATTERED SITES HOUSING DEVELOPMEN T FUNDCORP103/22/2026
SCATTERED SITES LP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMTG CONSULTANTS INC808/29/2023
ENTHINK ENGINEERS LLC109/07/2022
URBAN QUOTIENT106/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORIZON CONSTRUCTION INCGeneral Contractor403/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
METRO CONTRACTING NY, INC.General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FAIRFIELD TESTING LABORAT3404708/29/2023
Building Lifecycle
All (114)Filed (10)Permit Issued (5)Signed Off (5)Violation (60)Inspection (4)Special Inspection (30)
04/12/2026
Violation issued (HPD, open)
C
04/12/2026
Violation issued (HPD, open)
C
04/12/2026
Violation issued (HPD, open)
B
04/12/2026
Violation issued (HPD, closed)
C
04/12/2026
Violation issued (HPD, open)
B
04/12/2026
Violation issued (HPD, open)
B
04/12/2026
Violation issued (HPD, open)
B
02/27/2026
Violation issued (HPD, open)
C
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/25/2025
Violation issued (HPD, closed)
C
08/25/2025
Violation issued (HPD, closed)
C
02/23/2025
Violation issued (HPD, closed)
C
08/20/2024
Violation issued (HPD, closed)
A
08/20/2024
Violation issued (HPD, closed)
B
08/20/2024
Violation issued (HPD, closed)
A
08/20/2024
Violation issued (HPD, closed)
B
08/20/2024
Violation issued (HPD, closed)
A
08/20/2024
Violation issued (HPD, closed)
C
08/20/2024
Violation issued (HPD, closed)
A
08/20/2024
Violation issued (HPD, closed)
B
04/27/2024
Violation issued (HPD, closed)
A
04/27/2024
Violation issued (HPD, closed)
B
03/15/2024
Violation issued (HPD, closed)
A
03/15/2024
Violation issued (HPD, closed)
A
03/15/2024
Violation issued (HPD, closed)
C
03/15/2024
Violation issued (HPD, closed)
B
12/29/2023
Violation issued (HPD, closed)
C
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
A
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
C
12/26/2023
Violation issued (HPD, closed)
B
12/18/2023
Violation issued (HPD, closed)
A
12/18/2023
Violation issued (HPD, closed)
A
10/25/2023
Violation issued (HPD, closed)
I
10/17/2023
Violation issued (HPD, closed)
C
10/17/2023
Violation issued (HPD, closed)
C
10/17/2023
Violation issued (HPD, closed)
B
10/17/2023
Violation issued (HPD, closed)
C
10/17/2023
Violation issued (HPD, closed)
B
10/17/2023
Violation issued (HPD, closed)
B
10/17/2023
Violation issued (HPD, closed)
C
10/17/2023
Violation issued (HPD, closed)
C
09/25/2023
Signed off — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH.
M00551587-I1
09/22/2023
Signed off — Alteration
PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH.
M00535379-I1
09/01/2023
Special inspection requirement — Heating Systems
JAMES QUILL
09/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
JAMES QUILL
09/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
JAMES QUILL
08/29/2023
Filed — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH.
M00551587-P3
08/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
JAMES QUILL
08/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
JAMES QUILL
08/16/2023
Special inspection requirement — Heating Systems
JAMES QUILL
08/08/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/25/2023
Filed — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH.
M00551587-P2
07/05/2023
Special inspection requirement — Heating Systems
JAMES QUILL
07/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
JAMES QUILL
07/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
JAMES QUILL
06/28/2023
Signed off — Alteration
INTERIOR RENOVATIONS, FINISHES, DOORS AND WINDOWS REPLACEMENT. MINOR REPAIRS TO EXTERIOR FACADES AND ROOF MEMBRANE REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00535213-S1
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/23/2022
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.09/23/2022
DOB NOWMechanical SystemsSigned-offHORIZON CONSTRUCTION INC09/15/2022
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC09/14/2022
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.09/07/2022
BISPLISSUEDCEGF & G PLUMBING CORP05/11/2001
BISPLISSUEDCEGF & G PLUMBING CORP12/15/1999
BIS—RE-ISSUEDEJ PETERS CONSTRUCTION CORP04/07/1999
BIS—ISSUEDR&R CONTRACTING CO INC04/16/1998
BISFBISSUEDS.J. FUEL CO., INC05/27/1993
1 project · most recent 09/12/2022
FiledStatusContractorScope
09/12/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
09/01/2023Heating SystemsJAMES QUILLspecial
09/01/2023HVAC-R and service water heating equipmentJAMES QUILLenergy_progress
09/01/2023HVAC-R and service water heating system controlsJAMES QUILLenergy_progress
08/16/2023HVAC-R and service water heating equipmentJAMES QUILLenergy_progress
08/16/2023HVAC-R and service water heating system controlsJAMES QUILLenergy_progress
08/16/2023Heating SystemsJAMES QUILLspecial
07/05/2023Heating SystemsJAMES QUILLspecial
07/05/2023HVAC-R and service water heating system controlsJAMES QUILLenergy_progress
07/05/2023HVAC-R and service water heating equipmentJAMES QUILLenergy_progress
06/27/2023HVAC-R and service water heating equipmentJAMES QUILLenergy_progress
06/27/2023Mechanical SystemsJAMES QUILLspecial
06/27/2023Heating SystemsJAMES QUILLspecial
06/27/2023FinalJAMES QUILLprogress
06/27/2023Shutoff dampersJAMES QUILLenergy_progress
06/27/2023HVAC-R and service water heating system controlsJAMES QUILLenergy_progress
06/27/2023HVAC-R and service water piping design and insulationJAMES QUILLenergy_progress
06/20/2023HVAC-R and service water heating system controlsJAMES QUILLenergy_progress
06/20/2023HVAC-R and service water piping design and insulationJAMES QUILLenergy_progress
06/20/2023HVAC-R and service water heating equipmentJAMES QUILLenergy_progress
06/20/2023FinalJAMES QUILLprogress
06/20/2023Heating SystemsJAMES QUILLspecial
06/20/2023Mechanical SystemsJAMES QUILLspecial
06/20/2023Shutoff dampersJAMES QUILLenergy_progress
05/30/2023HVAC-R and service water heating equipmentJAMES QUILLenergy_progress
05/30/2023HVAC-R and service water heating system controlsJAMES QUILLenergy_progress
Latest 25 of 36.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00535213-S1Request digital key ↗
09/03/2026M00535213-I1Request digital key ↗
09/03/2026M00535213-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature26
09/23/2026M00551587-I1Open ↗
09/23/2026M00551587-I1Open ↗
09/21/2026M00535213-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00535213-S1Open ↗
09/01/2026M07999420-I1Open ↗
08/13/2026M00535379-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M00551587-I1Open ↗
09/21/2026M00535213-P1Open ↗
09/21/2026M00535213-P1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M00535379-I1Open ↗
08/13/2026M00535213-I1Open ↗
08/13/2026M00535213-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00535213-S1Open ↗
08/13/2026M00551587-I1Open ↗
08/13/2026M00535213-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00551587-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
09/03/2026M00535213-S1Open ↗
08/13/2026M00551587-I1Open ↗
08/13/2026M00551587-P2Open ↗
Showing 3 of 9 on file for this type