← Back
Over six families without stores
567 WEST 173 STREET
MANHATTAN · BIN 1063127
💬 Discuss this project
1910Year Built
5Stories
C1Building Class
R7-2Zoning
12,720 sfGross Floor Area
15Units
Rent Stabilized30 Open Violations ▸
Over six families without stores · 3,750 sf lot · 3.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.511/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL FUEL PLUBING & HTINGPlumbing507/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851511/22/2021
Building Lifecycle
All (85)Filed (5)Permit Issued (9)Signed Off (3)Violation (60)Special Inspection (8)
05/01/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, open)
A
05/01/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, open)
A
05/01/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, open)
C
05/01/2026
Violation issued (HPD, open)
C
05/01/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, closed)
A
02/04/2026
Violation issued (HPD, closed)
C
04/02/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00374027-I1
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
02/09/2022
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00374027-S1
11/22/2021
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00374027-P2
11/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
11/22/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/04/2021
Permit issued — Plumbing
M00374027-I1-PL
11/04/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/20/2021
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00374027-P1
10/14/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
10/14/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
10/14/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
10/14/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
06/29/2021
Permit issued — Boiler Equipment
M00374027-S1-BE
06/21/2021
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00374027-S2
04/13/2021
Violation issued (HPD, closed)
B
04/02/2021
Violation issued (HPD, closed)
A
01/24/2021
Violation issued (HPD, closed)
C
01/24/2021
Violation issued (HPD, closed)
C
01/24/2021
Violation issued (HPD, open)
C
01/24/2021
Violation issued (HPD, open)
B
01/24/2021
Violation issued (HPD, closed)
A
12/21/2020
Violation issued (HPD, closed)
C
12/21/2020
Violation issued (HPD, closed)
C
12/21/2020
Violation issued (HPD, closed)
C
11/06/2020
Violation issued (HPD, closed)
A
11/06/2020
Violation issued (HPD, closed)
A
11/06/2020
Violation issued (HPD, closed)
A
11/06/2020
Violation issued (HPD, open)
C
11/06/2020
Violation issued (HPD, closed)
B
11/06/2020
Violation issued (HPD, closed)
B
11/06/2020
Violation issued (HPD, closed)
B
11/06/2020
Violation issued (HPD, open)
B
11/06/2020
Violation issued (HPD, closed)
B
11/06/2020
Violation issued (HPD, closed)
B
11/06/2020
Violation issued (HPD, closed)
A
11/06/2020
Violation issued (HPD, closed)
A
09/16/2020
Permit issued — Plumbing
M00374027-I1-PL
09/16/2020
Permit issued — Mechanical Systems
M00374027-S2-MS
09/12/2020
Violation issued (HPD, closed)
C
09/12/2020
Violation issued (HPD, closed)
B
09/12/2020
Violation issued (HPD, closed)
C
09/12/2020
Violation issued (HPD, closed)
B
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING11/04/2021
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING06/29/2021
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING09/16/2020
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC09/16/2020
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING08/25/2020
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING08/25/2020
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC08/24/2020
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING08/24/2020
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING08/10/2020
BISBLISSUEDWASOFF PLBG. & UTL.CO INC05/13/1996
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/22/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
11/22/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
11/04/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
11/04/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
10/14/2021Maintenance informationLOUIS ARENAenergy_progress
10/14/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
10/14/2021Heating SystemsLOUIS ARENAspecial
10/14/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00374027-I1Request digital key ↗
08/15/2026M00374027-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00374027-S1Request digital key ↗
08/15/2026M00374027-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00374027-S2Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00374027-I1Open ↗
09/04/2026M00374027-S1Open ↗
09/04/2026M00374027-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M00374027-I1Open ↗
09/01/2026M00374027-P1Open ↗
09/01/2026M00374027-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M00374027-I1Open ↗
09/01/2026M00374027-P1Open ↗
08/26/2026M00374027-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan5
08/13/2026M00374027-P1Open ↗
08/13/2026M00374027-I1Open ↗
08/13/2026M00374027-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00374027-S2Open ↗
09/04/2026M00374027-I1Open ↗
09/04/2026M00374027-S1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00374027-S1Open ↗