← Back
All parking garages
630 WEST 160 STREET
MANHATTAN · BIN 1063318
💬 Discuss this project
1920Year Built
4Stories
G1Building Class
R8Zoning
48,400 sfGross Floor Area
1Units
LL97 Covered8 Open Violations ▸
All parking garages · 12,500 sf lot · 3.87 FAR built · Flood zone X
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 2 filings · 16 docs
Floor 7Under Construction11p · 1 filing · 10 docs
Floor 6Under Construction11p · 1 filing · 10 docs
Floor 5Under Construction11p · 1 filing · 10 docs
Floor 4Under Construction11p · 1 filing · 10 docs
Floor 3Under Construction11p · 1 filing · 10 docs
Floor 2Under Construction11p · 1 filing · 10 docs
Floor 1Under Construction11p · 1 filing · 10 docs
4 jobs · most recent 07/09/2026
FiledStatusContractorScope
07/09/2026Permit IssuedTOP SHELF ELECTRIC CORP—
07/30/2025CompleteTOP SHELF ELECTRIC CORP—
06/09/2025Permit IssuedINTERSTATE ELECTRIC, LLC1 meters
06/14/2018CompleteTOP SHELF ELECTRIC CORP—
2 jobs · most recent 01/12/2026
Masonry Concrete
FiledStatusContractorScope
01/12/2026Permit IssuedPLATINUM SPECIALTY SERVICConcrete, Masonry
05/15/2025Permit IssuedDNA CONTRACTING LLCMasonry
1 job · most recent 07/14/2026
Sidewalk Shed
FiledStatusContractorScope
07/14/2026Signed-offSPRING SCAFFOLDING LLCSidewalk Shed
1 job · most recent 07/15/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/15/2025Permit IssuedDNA CONTRACTING LLCSuspended Scaffold (SC)
Building Lifecycle
All (68)Filed (8)Permit Issued (20)Signed Off (2)Violation (13)Inspection (1)Objection (16)Special Inspection (8)
07/15/2026
Permit issued — Sidewalk Shed
M01413634-I1-SH
07/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01413634-I1
06/10/2026
Permit issued — Structural
M01046545-I1-ST
06/03/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/22/2026
Signed off — Alteration
GARAGE REPAIR AT 160 ST: STRUCTURAL WORK INCLUDING CONCRETE REPAIRS, MASONRY, AND WATERPROOFING AND REMOVAL OF SHORING TO ACCOMMODATE THE GARAGE REPAIR PROJECT AT THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00949083-I1
04/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01275315-I1
03/03/2026
Permit issued — Sidewalk Shed
M00052197-I1-SH
01/12/2026
Filed — Alteration
GARAGE REPAIR AT 160 ST: STRUCTURAL WORK INCLUDING CONCRETE REPAIRS, MASONRY, AND WATERPROOFING AND REMOVAL OF SHORING TO ACCOMMODATE THE GARAGE REPAIR PROJECT AT THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00949083-P2
01/07/2026
Special inspection requirement — Final
Young Suh
01/07/2026
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
01/07/2026
Special inspection requirement — Masonry
Young Suh
01/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
10/03/2025
Permit issued — Structural
M00949083-I1-ST
09/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01275315-I1
09/12/2025
Permit issued — Sidewalk Shed
M01275315-I1-SH
07/17/2025
Objection raised — Other
07/17/2025
Objection resolved — Addressed
07/17/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
07/15/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. AMEND #1 ADDED CHOOK OPTIONS
M01222469-P1
07/15/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
06/05/2025
Permit issued — Structural
M01046545-I1-ST
05/21/2025
Permit issued — Suspended Scaffold
M01222469-I1-SC
05/19/2025
Objection raised — Other
05/19/2025
Objection resolved — Addressed
05/15/2025
Filed — Alteration
Facade repair as per plans.
M01046545-I1
05/12/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. AMEND #1 ADDED CHOOK OPTIONS
M01222469-I1
03/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/28/2025
Permit issued — Sidewalk Shed
M00052197-I1-SH
11/13/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2024
Permit issued — Structural
M00949083-I1-ST
09/27/2024
Permit issued — Structural
M00949083-I1-ST
09/12/2024
Violation issued (ECB, closed)
Construction
05/31/2024
Permit issued — Structural
M00949083-I1-ST
05/14/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/06/2024
Special inspection requirement — Masonry
Young Suh
05/06/2024
Special inspection requirement — Final
Young Suh
04/30/2024
Objection resolved — Addressed
04/30/2024
Objection resolved — Addressed
04/30/2024
Objection resolved — Addressed
04/26/2024
Objection resolved — Addressed
04/26/2024
Objection resolved — Addressed
04/26/2024
Objection resolved — Addressed
04/10/2024
Objection raised — Structural
04/10/2024
Objection raised — Inspections
04/10/2024
Objection raised — Other
04/10/2024
Objection raised — Structural
04/10/2024
Objection raised — Admin
04/10/2024
Objection raised — Admin
04/08/2024
Filed — Alteration
GARAGE REPAIR AT 160 ST: STRUCTURAL WORK INCLUDING CONCRETE REPAIRS, MASONRY, AND WATERPROOFING AND REMOVAL OF SHORING TO ACCOMMODATE THE GARAGE REPAIR PROJECT AT THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00949083-I1
02/27/2024
Permit issued — Sidewalk Shed
M00052197-I1-SH
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2023
Permit issued — Sidewalk Shed
M00052197-I1-SH
03/03/2022
Permit issued — Sidewalk Shed
M00052197-I1-SH
09/02/2021
Violation issued (HPD, closed)
B
03/04/2021
Permit issued — Sidewalk Shed
M00052197-I1-SH
12/18/2020
Permit issued — Sidewalk Shed
M00052197-I1-SH
Latest 60 of 68 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK PRESBYTERIAN HOSPITAL1909/07/2026
MORAP103/22/2026
PRESBYTERIAN HOSPITAL103/22/2026
NY PRESBYTERIAN HOSPITAL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WELLWORTH CONSULTING LLC207/14/2026
O'DONNELL & NACCARATO STRUCTURAL EN301/12/2026
BAILEYS ENGINEERING PC106/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
MUNICIPAL EXPEDITING603/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor2709/07/2026
PLATINUM SPECIALTY SERVICGeneral Contractor607/08/2026
JOSEPH SORTINOElectrical203/21/2026
DNA CONTRACTING LLCGeneral Contractor207/08/2026
EDWARD PEREZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423301/12/2026
LEO Y LEE ASSOCIATES2481207/15/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/15/2026
DOB NOWStructuralPermit IssuedDNA CONTRACTING LLC06/10/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/03/2026
DOB NOWStructuralPermit IssuedPLATINUM SPECIALTY SERVIC10/03/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC09/12/2025
DOB NOWStructuralPermit IssuedPAUL CHARLTON06/05/2025
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC05/21/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/28/2025
DOB NOWStructuralSigned-offPLATINUM SPECIALTY SERVIC09/30/2024
DOB NOWStructuralSigned-offPLATINUM SPECIALTY SERVIC09/27/2024
DOB NOWStructuralSigned-offPLATINUM SPECIALTY SERVIC05/31/2024
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/27/2024
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/27/2023
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/03/2022
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/04/2021
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC12/18/2020
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC02/28/2020
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC12/20/2019
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC06/18/2019
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC06/22/2018
BISOTISSUEDSKYLINE RESTORATION INC05/02/2018
BISOTISSUEDWEST CONTRACTING CORP07/25/2000
BISEQISSUEDWOLF INSTALLATION INC01/06/2000
BISOTISSUEDWOLF INSTALLATION INC01/04/2000
BISOTISSUEDWOLF INSTALLATION INC05/11/1999
BISOTISSUEDWOLF INSTALLATION INC01/12/1999
BISEQISSUEDATLANTIC HEYDT CORP12/17/1998
BISOTISSUEDWOLF INSTALLATION INC08/05/1998
BISEQISSUEDATLANTIC SCAFFOLDING01/16/1998
BISEQISSUEDATLANTIC HEYDT SCAFFOLD CORP01/08/1998
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
01/07/2026FinalYoung Suhprogress
01/07/2026Concrete - Cast-In-PlaceYoung Suhspecial
01/07/2026MasonryYoung Suhspecial
01/07/2026Structural Stability – Alterations of existing buildingsYoung Suhspecial
07/17/2025Post-installed AnchorsLeo Leespecial
07/15/2025Post-installed AnchorsLeo Leespecial
05/06/2024MasonryYoung Suhspecial
05/06/2024FinalYoung Suhprogress
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/06/2026M00052197-I1Request digital key ↗
08/23/2026M01222469-P1Request digital key ↗
08/23/2026M01222469-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
05/03/2018123357606Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/19/2018123357606Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00052197-I1Open ↗
08/21/2026M01275315-I1Open ↗
08/16/2026M01413634-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01046545-I1Open ↗
08/28/2026M01222469-P1Open ↗
08/23/2026M00949083-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/09/2018123357606Open ↗
10/09/2018123357606Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M01046545-I1Open ↗
08/23/2026M00949083-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/19/2018123357606Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/19/2018123357606Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M01046545-I1Open ↗
08/13/2026M00949083-P2Open ↗
08/13/2026M00949083-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/19/2018123357606Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/09/2018123357606Open ↗
10/09/2018123357606Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/09/2018123357606Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/23/2026M01222469-I1Open ↗
08/16/2026M01413634-I1Open ↗
08/13/2026M01275315-I1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/09/2018123357606Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/09/2018123357606Open ↗
04/19/2018123357606Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
04/19/2018123357606Open ↗
▸BISBOROUGH INTAKE FORM1
10/09/2018123357606Open ↗
▸Other Documents4
▸DOB NOWCalculations2
08/23/2026M01222469-I1Open ↗
08/13/2026M01222469-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/23/2026M01222469-I1Open ↗
08/13/2026M01222469-P1Open ↗