← Back
Elevator apt, semi-fireproof without stores
13 MAGAW PLACE
MANHATTAN · BIN 1064389
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R7-2Zoning
43,326 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized25 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 15 MAGAW ASSOCIATES, · 10,000 sf lot · 4.33 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 14 docs
BasementUnder Construction2p · 1 filing · 14 docs
Sub-BasementUnder Construction6p · 1 filing · 14 docs
1 job · most recent 11/09/2023
Gas
FiledStatusContractorScope
11/09/2023Permit IssuedA P PLUMBING&HEATING INCGas
2 jobs · most recent 09/17/2020
FiledStatusContractorScope
09/17/2020Permit IssuedRICHARD NEU—
09/16/2020CompleteR.C.M. ELECTRIC CORP.1 meters, 1 new_meters
2 jobs · most recent 09/17/2020
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/17/2020Permit IssuedALL EMPIRE BUILDING CONScaffold
09/14/2020Permit IssuedALL EMPIRE BUILDING CONSidewalk Shed
Building Lifecycle
All (83)Filed (5)Permit Issued (8)Violation (60)Inspection (1)Special Inspection (9)
08/04/2026
Violation issued (ECB, open)
Elevators
06/12/2026
Permit issued — Boiler Equipment
M00932854-I1-BE
05/28/2026
Violation issued (HPD, closed)
B
05/28/2026
Violation issued (HPD, closed)
B
04/25/2026
Violation issued (ECB, closed)
Construction
06/12/2025
Permit issued — Boiler Equipment
M00932854-I1-BE
05/07/2024
Permit issued — Boiler Equipment
M00932854-I1-BE
03/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/08/2024
Permit issued — Boiler Equipment
M00932854-I1-BE
02/03/2024
Violation issued (HPD, closed)
B
02/03/2024
Violation issued (HPD, closed)
C
02/03/2024
Violation issued (HPD, closed)
C
02/03/2024
Violation issued (HPD, closed)
C
02/03/2024
Violation issued (HPD, closed)
C
02/03/2024
Violation issued (HPD, closed)
C
02/03/2024
Violation issued (HPD, closed)
C
02/03/2024
Violation issued (HPD, closed)
C
02/01/2024
Permit issued — Plumbing
M00932854-S1-PL
11/21/2023
Permit issued — Mechanical Systems
M00932854-S2-MS
11/09/2023
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00932854-I1
11/09/2023
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00932854-S1
11/09/2023
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00932854-S2
11/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
09/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
09/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
09/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
09/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
09/12/2023
Special inspection requirement — Chimneys and vents
Joseph Bazini
09/12/2023
Special inspection requirement — Mechanical Systems
Joseph Bazini
09/12/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
09/12/2023
Special inspection requirement — Final
Joseph Bazini
12/25/2022
Violation issued (HPD, closed)
C
10/10/2022
Violation issued (HPD, closed)
C
01/19/2022
Violation issued (HPD, closed)
C
01/19/2022
Violation issued (HPD, closed)
A
01/19/2022
Violation issued (HPD, closed)
C
10/07/2020
Permit issued — Supported Scaffold
M00399709-I1-SF
09/21/2020
Permit issued — Sidewalk Shed
M00398294-I1-SH
09/17/2020
Filed — Alteration
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00399709-I1
09/14/2020
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00398294-I1
10/01/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2019
Violation issued (HPD, closed)
A
09/05/2019
Violation issued (HPD, closed)
B
09/05/2019
Violation issued (HPD, closed)
B
09/05/2019
Violation issued (HPD, closed)
C
09/05/2019
Violation issued (HPD, closed)
A
09/05/2019
Violation issued (HPD, closed)
B
09/05/2019
Violation issued (HPD, closed)
B
09/05/2019
Violation issued (HPD, closed)
C
09/05/2019
Violation issued (HPD, open)
A
09/05/2019
Violation issued (HPD, closed)
B
09/05/2019
Violation issued (HPD, open)
B
09/05/2019
Violation issued (HPD, open)
B
09/05/2019
Violation issued (HPD, closed)
B
09/05/2019
Violation issued (HPD, closed)
C
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/24/2018
Violation issued (ECB, closed)
Elevators
12/22/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/16/2017
Violation issued (HPD, closed)
A
06/16/2017
Violation issued (HPD, closed)
A
Latest 60 of 83 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LLC1007/08/2026
ALL EMPIRE BUILDING CONTRACTORS INC903/22/2026
15 MAGAW ASSOCIATES1303/22/2026
15 MAGAN ASSOCIATES403/22/2026
FRANK CADEDDU AGENT OWNER103/22/2026
OWNEROF 15 MAGAW PLACE203/22/2026
RUNKMAN MANAGEMENT INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.311/09/2023
SYED ENGINEERING, P.C.209/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHEIKH EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL EMPIRE BUILDING CONGeneral Contractor603/21/2026
ATOMIC HEATING LLCGeneral Contractor303/21/2026
A P PLUMBING&HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808311/09/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedDOUGLAS SIMMONS06/12/2026
DOB NOWBoiler EquipmentPermit IssuedDOUGLAS SIMMONS06/12/2025
DOB NOWBoiler EquipmentPermit IssuedDOUGLAS SIMMONS05/07/2024
DOB NOWBoiler EquipmentPermit IssuedDOUGLAS SIMMONS02/08/2024
DOB NOWPlumbingPermit IssuedA P PLUMBING&HEATING INC02/01/2024
DOB NOWMechanical SystemsPermit IssuedATOMIC HEATING LLC11/21/2023
DOB NOWSupported ScaffoldPermit IssuedALL EMPIRE BUILDING CON10/07/2020
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON09/21/2020
BISOTISSUEDGLOBAL GENERAL CONTRACT*10/23/2020
BISBLISSUEDPRECISION COMBUSTION COSULTANTS08/16/2007
BISOTISSUEDVIDEREL INTERIOR CORP08/09/2000
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/09/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
09/12/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
09/12/2023Fire-Resistant Penetrations and JointsJoseph Bazinispecial
09/12/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
09/12/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
09/12/2023Chimneys and ventsJoseph Bazinispecial
09/12/2023Mechanical SystemsJoseph Bazinispecial
09/12/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
09/12/2023FinalJoseph Baziniprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/28/2026M00932854-S1Request digital key ↗
08/28/2026M00932854-I1Request digital key ↗
08/28/2026M00932854-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00398294-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00399709-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/20/2020140962224Open ↗
▸BISWORK PERMIT APPLICATION1
10/23/2020140962224Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026M00932854-I1Open ↗
08/28/2026M00932854-S2Open ↗
08/28/2026M00932854-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M00932854-I1Open ↗
08/26/2026M00932854-S2Open ↗
08/23/2026M00932854-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026M00932854-I1Open ↗
08/26/2026M00932854-S2Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/20/2020140962224Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/20/2020140962224Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/20/2020140962224Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026M00399709-I1Open ↗
08/13/2026M00398294-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
10/20/2020140962224Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026M00932854-I1Open ↗
08/28/2026M00932854-S2Open ↗
08/28/2026M00932854-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/20/2020140962224Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/16/2021140962224Open ↗
10/20/2020140962224Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/20/2020140962224Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/16/2021140962224Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/16/2021140962224Open ↗
07/16/2021140962224Open ↗
10/23/2020140962224Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/16/2021140962224Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/16/2021140962224Open ↗
10/20/2020140962224Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/20/2020140962224Open ↗