← Back
Elevator apt, semi-fireproof without stores
21 BENNETT AVENUE
MANHATTAN · BIN 1064416
💬 Discuss this project
1920Year Built
6Stories
D1Building Class
R7-2Zoning
38,670 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized26 Open Violations 24 unresolved · 2 paperwork only ▸
Elevator apt, semi-fireproof without stores · 9,525 sf lot · 4.06 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIMILIS MANAGEMENT LL1407/08/2026
21 BENNETT SIMILIS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT508/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAUL TRAKTMAN LIC PLBR INPlumbing107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659408/09/2023
Building Lifecycle
All (90)Filed (5)Permit Issued (2)Violation (60)Inspection (3)Special Inspection (20)
06/10/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, closed)
C
12/09/2025
Violation issued (HPD, closed)
B
12/09/2025
Violation issued (HPD, closed)
B
07/01/2025
Violation issued (ECB, closed)
Construction
09/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
08/21/2023
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
08/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALBERTO ROMAN
08/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
ALBERTO ROMAN
08/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERTO ROMAN
08/09/2023
Filed — Alteration
Plumbing application filed herewith for installation of new fixtures and replace existing.
M00619020-P4
08/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
08/08/2023
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
08/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALBERTO ROMAN
08/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
ALBERTO ROMAN
08/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERTO ROMAN
06/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/10/2023
Permit issued — Plumbing
M00619020-I1-PL
03/15/2023
Violation issued (HPD, closed)
A
02/05/2023
Violation issued (HPD, closed)
C
11/02/2022
Filed — Alteration
Plumbing application filed herewith for installation of new fixtures and replace existing.
M00619020-P3
11/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
11/02/2022
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
11/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
ALBERTO ROMAN
11/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
ALBERTO ROMAN
11/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERTO ROMAN
09/01/2022
Filed — Alteration
Plumbing application filed herewith for installation of new fixtures and replace existing.
M00619020-P2
08/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
08/31/2022
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
08/31/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERTO ROMAN
08/31/2022
Special inspection requirement — HVAC-R and service water heating equipment
ALBERTO ROMAN
08/31/2022
Special inspection requirement — HVAC-R and service water heating system controls
ALBERTO ROMAN
08/02/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/24/2022
Permit issued — Plumbing
M00619020-I1-PL
02/22/2022
Filed — Alteration
Plumbing application filed herewith for installation of new fixtures and replace existing.
M00619020-P1
02/15/2022
Violation issued (HPD, closed)
A
02/06/2022
Violation issued (HPD, closed)
C
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2021
Filed — Alteration
Plumbing application filed herewith for installation of new fixtures and replace existing.
M00619020-I1
09/30/2021
Violation issued (ECB, closed)
Elevators
08/21/2021
Violation issued (HPD, closed)
A
08/21/2021
Violation issued (HPD, closed)
B
08/21/2021
Violation issued (HPD, closed)
A
08/21/2021
Violation issued (HPD, closed)
B
08/21/2021
Violation issued (HPD, open)
C
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, closed)
B
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN05/10/2023
DOB NOWPlumbingSigned-offPAUL TRAKTMAN LIC PLBR IN03/24/2022
BISOTISSUEDPETER & DANNY CONTRACT LL11/29/2010
BISEQISSUEDPETER & DANNY CONTRACT LL11/26/2010
BISOTISSUEDHIGH POWER CONSTR CORP01/31/1997
1 project · most recent 08/09/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/09/2023Signed-offPRIME PIPING & HEATING INGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/02/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/21/2023Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
08/21/2023Energy Code Compliance InspectionsALBERTO ROMANprogress
08/21/2023HVAC-R and service water heating equipmentALBERTO ROMANenergy_progress
08/21/2023HVAC-R and service water heating system controlsALBERTO ROMANenergy_progress
08/21/2023HVAC-R and service water piping design and insulationALBERTO ROMANenergy_progress
08/08/2023Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
08/08/2023Energy Code Compliance InspectionsALBERTO ROMANprogress
08/08/2023HVAC-R and service water heating equipmentALBERTO ROMANenergy_progress
08/08/2023HVAC-R and service water heating system controlsALBERTO ROMANenergy_progress
08/08/2023HVAC-R and service water piping design and insulationALBERTO ROMANenergy_progress
11/02/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
11/02/2022Energy Code Compliance InspectionsALBERTO ROMANprogress
11/02/2022HVAC-R and service water heating equipmentALBERTO ROMANenergy_progress
11/02/2022HVAC-R and service water heating system controlsALBERTO ROMANenergy_progress
11/02/2022HVAC-R and service water piping design and insulationALBERTO ROMANenergy_progress
08/31/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
08/31/2022Energy Code Compliance InspectionsALBERTO ROMANprogress
08/31/2022HVAC-R and service water piping design and insulationALBERTO ROMANenergy_progress
08/31/2022HVAC-R and service water heating equipmentALBERTO ROMANenergy_progress
08/31/2022HVAC-R and service water heating system controlsALBERTO ROMANenergy_progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/29/2026M00619020-I1Request digital key ↗
08/29/2026M00619020-P2Request digital key ↗
08/29/2026M00619020-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
12/06/2010120543554Open ↗
11/30/2010120543368Open ↗
▸BISWORK PERMIT APPLICATION2
12/01/2010120543554Open ↗
11/30/2010120543368Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026M00619020-P4Open ↗
08/31/2026M00619020-P4Open ↗
08/30/2026M00619020-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026M00619020-P2Open ↗
08/29/2026M00619020-I1Open ↗
08/29/2026M00619020-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026M00619020-P4Open ↗
08/30/2026M00619020-I1Open ↗
08/28/2026M00619020-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/06/2010120543554Open ↗
11/30/2010120543368Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/06/2010120543554Open ↗
11/30/2010120543368Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/06/2010120543554Open ↗
11/30/2010120543368Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026M00619020-P4Open ↗
08/29/2026M00619020-P1Open ↗
08/29/2026M00619020-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
12/06/2010120543554Open ↗
12/06/2010120543554Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/30/2010120543368Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
12/06/2010120543554Open ↗
11/30/2010120543368Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/06/2010120543554Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
12/06/2010120543554Open ↗
11/30/2010120543368Open ↗
▸Other Documents9
▸DOB NOWDHCR Document9
08/29/2026M00619020-P4Open ↗
08/29/2026M00619020-P4Open ↗
08/13/2026M00619020-P2Open ↗
Showing 3 of 9 on file for this type