← Back
Condo, residential unit in elevator building
3 EAST 66 STREET
MANHATTAN · BIN 1072021
💬 Discuss this project
1934Year Built
9Stories
R4Building Class
R8BZoning
17,574 sfGross Floor Area
27Units
LL97 CoveredRent Stabilized18 Open Violations 17 unresolved · 1 paperwork only ▸FISP: No Report Filed
Condo, residential unit in elevator building · Owner of record: 3E 66TH LLC · 3,414 sf lot · 5.15 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 4 docs
Floor 72p · 2 filings · 11 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3 E 66TH LLC PARKOFF OPER103/22/2026
3E 66 LLC PARKOFF OPERATI103/22/2026
REALTY MANAGEMENT C/O PAK103/22/2026
3 EAST 66TH LLC103/22/2026
EASIX RLTY CORP203/22/2026
3 EAST 66TH ST LLC103/22/2026
EISIX REALTY CORP DAVID F103/22/2026
T.U.C.MANAGEMENT CO. I103/22/2026
3 E 66 ST LLC103/22/2026
MACKLOWE MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INSITE DESIGN STUDIO309/07/2023
DS ENGINEERING SERVICES, PC108/18/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DS ENGINEERING SERVICES,1608108/18/2022
Building Lifecycle
All (78)Filed (4)Facade (FISP) (9)Violation (60)Special Inspection (5)
06/04/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, open)
C
06/04/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
B
05/16/2025
Violation issued (HPD, closed)
B
05/16/2025
Violation issued (HPD, closed)
A
05/16/2025
Violation issued (HPD, open)
C
05/16/2025
Violation issued (HPD, open)
B
05/16/2025
Violation issued (HPD, closed)
A
04/21/2025
Violation issued (ECB, open)
Local Law
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
C
10/29/2024
Violation issued (HPD, open)
B
03/12/2024
Violation issued (HPD, open)
B
03/12/2024
Violation issued (HPD, open)
C
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
C
03/12/2024
Violation issued (HPD, closed)
C
03/12/2024
Violation issued (HPD, closed)
B
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/07/2023
Filed — Alteration
INTERIOR ALTERATION FOR AN EXISTING APARTMENT.NO CHANGES OF USE, EGRESS, OR OCCUPANCY.
M00863645-I1
04/21/2023
Special inspection requirement — Final
JAMES CORNEJO
04/21/2023
Special inspection requirement — Lighting in dwelling units
JAMES CORNEJO
10/17/2022
Filed — Alteration
M07999186-I1
10/17/2022
Filed — Alteration
INTERIOR ALTERATION TO COMBINE 2 RESIDENTIAL UNITS ON THE 7TH FLOOR (UNITS#: 7B & 7C) TO CREATE ONE RESIDENTIAL UNIT. SCOPE INCLUDES ALTERATION OF KITCHEN, BATHROOMS, AND NEW NON-LOAD BEARING PARTITION. NO CHANGES OF USE, EGRESS, OR OCCUPANCY.
M07999283-I1
09/09/2022
Special inspection requirement — Energy Code Compliance Inspections
JAMES CORNEJO
09/06/2022
Special inspection requirement — Final
JAMES CORNEJO
09/06/2022
Special inspection requirement — Lighting in dwelling units
JAMES CORNEJO
08/18/2022
Filed — Alteration
M00613356-I1
12/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2019
Cycle 8 facade report signed — SWARMP
02/20/2019
Cycle 8 facade report submitted
02/14/2019
Cycle 8 facade inspection completed
12/06/2017
Violation issued (HPD, closed)
C
09/15/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/11/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/30/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/30/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/01/2015
Violation issued (ECB, closed)
Elevators
07/20/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/13/2013
Cycle 7 facade report submitted
02/12/2013
Cycle 7 facade report signed — SAFE
12/14/2012
Cycle 7 facade inspection completed
11/30/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDSKYLINE RESTORATION INC07/21/2003
BISEQISSUEDPERMMIT. BRIDGE SAFF07/07/2003
BISOTISSUEDSKYLINE RESTORATION INC11/16/1998
BISBLISSUEDC C CONTROLLED COMBUSTION03/27/1997
BISPLISSUEDN. KOFSKY & SON INC.03/27/1997
BISPLISSUEDAVON PLBG & HTG INC07/19/1996
BIS—ISSUEDMCGRAW HUDSON CONSTRUCTION CORP.07/18/1996
BISOTISSUEDMC GREW HUDSON05/21/1996
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING02/06/1996
BISOTISSUEDROSLI CONST.09/15/1994
1 project · most recent 10/17/2022
Gas Water/Sanitary
FiledStatusContractorScope
10/17/2022——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/21/2023FinalJAMES CORNEJOprogress
04/21/2023Lighting in dwelling unitsJAMES CORNEJOenergy_progress
09/09/2022Energy Code Compliance InspectionsJAMES CORNEJOprogress
09/06/2022FinalJAMES CORNEJOprogress
09/06/2022Lighting in dwelling unitsJAMES CORNEJOenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/02/2026M00613356-I1Request digital key ↗
09/01/2026M07999283-I1Request digital key ↗
09/01/2026M07999186-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026M00863645-I1Open ↗
08/13/2026M00613356-I1Open ↗
08/13/2026M07999186-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026M00863645-I1Open ↗
08/24/2026M00863645-I1Open ↗
08/23/2026M07999186-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026M00613356-I1Open ↗
08/13/2026M07999283-I1Open ↗
08/13/2026M00863645-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00613356-I1Open ↗
08/13/2026M07999186-I1Open ↗
08/13/2026M00863645-I1Open ↗
Showing 3 of 4 on file for this type