← Back
Walk-up apt, over six families with stores
112 MADISON STREET
MANHATTAN · BIN 1077114
💬 Discuss this project
1900Year Built
3Stories
C7Building Class
R7-2Zoning
7,300 sfGross Floor Area
24Units
Rent Stabilized34 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: CHI FU INC. · 2,500 sf lot · 2.92 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 1 filing · 5 docs
Cellar2p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JA E ARCHITECT P.C.205/15/2025
NEW AIR SOLUTION INC.209/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AURORA P & H CONT INCPlumbing207/08/2026
P.L. ELEC'L CONTR'G CORPElectrical103/22/2026
TLS CONSTRUCTION GROUP I*General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JA E ARCHITECT P.C.3575205/15/2025
CL ENGINEERING P.C.6781209/27/2024
Building Lifecycle
All (66)Filed (4)Permit Issued (2)Signed Off (1)Violation (32)Inspection (3)Objection (6)Special Inspection (18)
12/23/2025
Signed off — Alteration
REPLACE ONE BOILER AND ONE H.W.H. IN THE BOILER ROOM, TAKE OVER THE OLD JOB#123775557 & LAA#122322316. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00797971-I1
06/25/2025
Permit issued — General Construction
M01213747-I1-GC
06/19/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Admin
05/30/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Admin
05/29/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Cost
05/15/2025
Filed — Alteration
INSTALL A LAVATORY ON THE FIRST FLOOR XIST BATHROOM
M01213770-I1
05/15/2025
Filed — Alteration
THIS APPLICATION IS TO RENOVATE EXIST BATHROOM & REPLACE NEW FLOOR
M01213747-I1
05/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
LILYANNE PARENGKUAN
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LILYANNE PARENGKUAN
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LILYANNE PARENGKUAN
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
LILYANNE PARENGKUAN
11/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/06/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
10/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
10/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
10/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
10/06/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
10/06/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
09/27/2024
Filed — Alteration
REPLACE ONE BOILER AND ONE H.W.H. IN THE BOILER ROOM, TAKE OVER THE OLD JOB#123775557 & LAA#122322316. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00797971-P1
09/24/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
09/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
09/24/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
09/24/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
07/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2023
Permit issued — Plumbing
M00797971-I1-PL
08/26/2022
Filed — Alteration
REPLACE ONE BOILER AND ONE H.W.H. IN THE BOILER ROOM, TAKE OVER THE OLD JOB#123775557 & LAA#122322316. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M00797971-I1
06/10/2015
Violation issued (HPD, closed)
B
02/02/2015
Violation issued (HPD, closed)
I
09/02/2009
Violation issued (ECB, closed)
Construction
06/20/2000
Violation issued (HPD, open)
B
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/1996
Violation issued (ECB, closed)
Construction
01/16/1996
Violation issued (ECB, closed)
Construction
02/08/1991
Violation issued (HPD, open)
B
01/25/1991
Violation issued (HPD, open)
C
01/22/1991
Violation issued (HPD, open)
B
01/22/1991
Violation issued (HPD, open)
B
01/22/1991
Violation issued (HPD, open)
B
01/22/1991
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
11/01/1990
Violation issued (HPD, open)
B
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTLS CONSTRUCTION GROUP I*06/25/2025
DOB NOWPlumbingSigned-offAURORA P & H CONT INC04/26/2023
1 project · most recent 05/15/2025
Water/Sanitary
FiledStatusContractorScope
05/15/2025——Water/Sanitary
1 project · most recent 06/06/2025
General Wiring
FiledStatusContractorScope
06/06/2025CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/15/2025Fire-Resistance Rated ConstructionLILYANNE PARENGKUANprogress
04/21/2025Fire-Resistant Penetrations and JointsLILYANNE PARENGKUANspecial
04/21/2025Fire-Resistant Penetrations and JointsLILYANNE PARENGKUANspecial
04/21/2025Energy Code Compliance InspectionsLILYANNE PARENGKUANprogress
10/06/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/06/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/06/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
10/06/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
10/06/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
10/06/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
10/06/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
09/24/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/24/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
09/24/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
09/24/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
09/24/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
09/24/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/24/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026M01213747-I1Request digital key ↗
08/23/2026M01213770-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
07/01/2019123775557Open ↗
07/30/2014121675936Open ↗
06/13/2013121675936Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M01213747-I1Open ↗
08/25/2026M00797971-P1Open ↗
08/25/2026M00797971-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01213747-I1Open ↗
08/25/2026M00797971-P1Open ↗
08/24/2026M00797971-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026M01213770-I1Open ↗
08/13/2026M00797971-P1Open ↗
08/13/2026M01213747-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/01/2019123775557Open ↗
06/13/2013121675936Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/01/2019123775557Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/01/2019123775557Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
07/01/2019123775557Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/01/2019123775557Open ↗
06/13/2013121675936Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026M01213770-I1Open ↗
08/13/2026M01213747-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form1
08/13/2026M00797971-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/01/2019123775557Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00797971-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00797971-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
06/13/2013121675936Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/01/2019123775557Open ↗
06/13/2013121675936Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
07/01/2019123775557Open ↗
06/13/2013121675936Open ↗
▸BISADDITIONAL INFORMATION1
08/02/2014121675936Open ↗