← Back
Three families
67 PAYSON AVENUE
MANHATTAN · BIN 1077203
💬 Discuss this project
1945Year Built
2Stories
C0Building Class
R7AZoning
3,800 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · Owner of record: THE BARBARA LEE SELLARS TRUST · 2,800 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 1 filing · 10 docs
Floor 11p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE BARBARA LEE SELLARS TRUST303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC206/10/2025
BFS ARCHITECT PC405/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KNA CONSULTING803/21/2026
BROOKLYN SOLARWORKS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor107/08/2026
ESSENTIAL REMODELING INCGeneral Contractor107/08/2026
GO PRO PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244206/10/2025
BFS ARCHITECT PC7477405/13/2025
Building Lifecycle
All (39)Filed (6)Permit Issued (3)Signed Off (3)Violation (1)Inspection (3)Special Inspection (23)
06/20/2025
Signed off — Alteration
INTERIOR RENOVATION OF FIRST FLOOR DWELLING UNIT, NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01016546-S1
06/20/2025
Signed off — Alteration
INTERIOR RENOVATION OF FIRST FLOOR DWELLING UNIT, NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01016546-I1
06/12/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01193775-I1
06/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
06/12/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
06/12/2025
Special inspection requirement — Final
NARESH MAHANGU
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
06/10/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01193775-P1
05/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/14/2025
Special inspection requirement — Final
Belal Salim
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
05/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Belal Salim
05/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Belal Salim
05/14/2025
Special inspection requirement — Ventilation and air distribution system
Belal Salim
05/14/2025
Special inspection requirement — Fenestration areas
Belal Salim
05/14/2025
Special inspection requirement — Fenestration air leakage
Belal Salim
05/14/2025
Special inspection requirement — Interior lighting power
Belal Salim
05/13/2025
Filed — Alteration
INTERIOR RENOVATION OF FIRST FLOOR DWELLING UNIT, NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01016546-P1
05/13/2025
Filed — Alteration
INTERIOR RENOVATION OF FIRST FLOOR DWELLING UNIT, NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01016546-P2
03/27/2025
Special inspection requirement — Fenestration air leakage
Belal Salim
03/27/2025
Special inspection requirement — Interior lighting power
Belal Salim
03/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Belal Salim
03/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Belal Salim
03/27/2025
Special inspection requirement — Final
Belal Salim
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
03/27/2025
Special inspection requirement — Ventilation and air distribution system
Belal Salim
03/27/2025
Special inspection requirement — Fenestration areas
Belal Salim
03/24/2025
Permit issued — Solar
M01193775-I1-SL
03/17/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01193775-I1
06/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2024
Permit issued — General Construction
M01016546-I1-GC
06/10/2024
Permit issued — Plumbing
M01016546-S1-PL
05/22/2024
Filed — Alteration
INTERIOR RENOVATION OF FIRST FLOOR DWELLING UNIT, NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01016546-S1
05/22/2024
Filed — Alteration
INTERIOR RENOVATION OF FIRST FLOOR DWELLING UNIT, NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01016546-I1
11/06/2017
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC03/24/2025
DOB NOWGeneral ConstructionSigned-offESSENTIAL REMODELING INC06/11/2024
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI06/10/2024
1 project · most recent 04/29/2025
FiledStatusContractorScope
04/29/2025CompleteBROOKYLN SOLARWORKS, LLC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
06/12/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
06/12/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
06/12/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
06/12/2025FinalNARESH MAHANGUprogress
06/12/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/14/2025FinalBelal Salimprogress
05/14/2025Fire-Resistant Penetrations and JointsBelal Salimspecial
05/14/2025Fire-Resistant Penetrations and JointsBelal Salimspecial
05/14/2025Fire-Resistance Rated ConstructionBelal Salimprogress
05/14/2025Fenestration and door U-factor and product ratingsBelal Salimenergy_progress
05/14/2025Ventilation and air distribution systemBelal Salimenergy_progress
05/14/2025Fenestration areasBelal Salimenergy_progress
05/14/2025Fenestration air leakageBelal Salimenergy_progress
05/14/2025Interior lighting powerBelal Salimenergy_progress
03/27/2025Fenestration air leakageBelal Salimenergy_progress
03/27/2025Interior lighting powerBelal Salimenergy_progress
03/27/2025Fenestration and door U-factor and product ratingsBelal Salimenergy_progress
03/27/2025Fire-Resistance Rated ConstructionBelal Salimprogress
03/27/2025FinalBelal Salimprogress
03/27/2025Fire-Resistant Penetrations and JointsBelal Salimspecial
03/27/2025Fire-Resistant Penetrations and JointsBelal Salimspecial
03/27/2025Ventilation and air distribution systemBelal Salimenergy_progress
03/27/2025Fenestration areasBelal Salimenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026M01193775-I1Request digital key ↗
08/24/2026M01193775-P1Request digital key ↗
08/23/2026M01016546-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026M01193775-I1Open ↗
08/23/2026M01016546-P2Open ↗
08/23/2026M01016546-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026M01016546-P1Open ↗
08/28/2026M01016546-P1Open ↗
08/27/2026M01016546-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/29/2026M01016546-S1Open ↗
08/28/2026M01016546-P1Open ↗
08/27/2026M01016546-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026M01193775-I1Open ↗
08/23/2026M01016546-P2Open ↗
08/23/2026M01016546-P1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01193775-I1Open ↗