← Back
Walk-up cooperative
614 EAST 9 STREET
MANHATTAN · BIN 1077482
💬 Discuss this project
1910Year Built
5Stories
C6Building Class
R8BZoning
33,000 sfGross Floor Area
38Units
Rent Stabilized18 Open Violations 16 unresolved · 2 paperwork only ▸
Walk-up cooperative · Owner of record: 614-20 E 9TH ST HDFC · 9,750 sf lot · 3.38 FAR built · Flood zone X500
Locations of Work
Structural
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERITAS PROPERTY MANAGEMENT1703/22/2026
614-20 E 9TH ST HDFC103/22/2026
614-620 EAST 9TH ST HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALNOUR CONSULTING207/31/2024
BUCK MOORHEAD ARCHITECT306/28/2024
ASHRAF CORP107/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1003/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATTRO CONSULTING GROUPGeneral Contractor903/21/2026
INTERSYSTEM INSTALLATIONGeneral Contractor607/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALNOUR CONSULTING ENGINEE607207/31/2024
Building Lifecycle
All (39)Filed (6)Permit Issued (7)Signed Off (2)Violation (7)Inspection (1)Objection (2)Special Inspection (14)
04/17/2025
Signed off — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-S1
08/15/2024
Signed off — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-I1
08/08/2024
Objection raised — Scope
08/08/2024
Objection resolved — Addressed
07/31/2024
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-P3
06/28/2024
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-P2
06/06/2024
Special inspection requirement — Final
WILLIAM MOORHEAD
06/06/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Nouredine Benabdelhak
06/06/2024
Special inspection requirement — Structural Steel - Details
Nouredine Benabdelhak
06/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nouredine Benabdelhak
05/29/2024
Special inspection requirement — Insulation placement and R values
WILLIAM MOORHEAD
05/29/2024
Special inspection requirement — Final
WILLIAM MOORHEAD
05/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MOORHEAD
05/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MOORHEAD
05/29/2024
Special inspection requirement — Air barrier - visual inspection
WILLIAM MOORHEAD
04/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/11/2023
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-P1
04/05/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MOORHEAD
04/05/2023
Special inspection requirement — Air barrier — testing
WILLIAM MOORHEAD
04/05/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MOORHEAD
04/05/2023
Special inspection requirement — Final
WILLIAM MOORHEAD
04/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MOORHEAD
09/28/2022
Permit issued — Sidewalk Shed
M00557630-I1-SH
08/02/2022
Permit issued — General Construction
M00496334-I1-GC
07/13/2022
Permit issued — Sidewalk Shed
M00557630-I1-SH
07/01/2022
Permit issued — Structural
M00496334-S1-ST
01/14/2022
Permit issued — Structural
M00496334-S1-ST
08/09/2021
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-S1
08/04/2021
Permit issued — Sidewalk Shed
M00557630-I1-SH
07/16/2021
Permit issued — Sidewalk Shed
M00557630-I1-SH
07/14/2021
Filed — Alteration
M00557630-I1
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2021
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-I1
04/16/2021
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
I
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM INSTALLATION09/28/2022
DOB NOWGeneral ConstructionSigned-offCATTRO CONSULTING GROUP08/02/2022
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM INSTALLATION07/13/2022
DOB NOWStructuralSigned-offCATTRO CONSULTING GROUP07/01/2022
DOB NOWStructuralSigned-offCATTRO CONSULTING GROUP01/14/2022
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM INSTALLATION08/04/2021
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM INSTALLATION07/16/2021
BIS—ISSUEDHAND IN HAND CONST.04/23/1992
3 projects · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025Permit IssuedVERE ELECTRIC CORP.General Wiring
08/01/2022Permit IssuedTIMOTHY COLEMAN LICENSEDGeneral Wiring
05/12/2022CompleteSTEVEN FARKAS—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
06/06/2024FinalWILLIAM MOORHEADprogress
06/06/2024Structural Steel - High Strength BoltingNouredine Benabdelhakspecial
06/06/2024Structural Steel - DetailsNouredine Benabdelhakspecial
06/06/2024Structural Stability – Alterations of existing buildingsNouredine Benabdelhakspecial
05/29/2024Insulation placement and R valuesWILLIAM MOORHEADenergy_progress
05/29/2024FinalWILLIAM MOORHEADprogress
05/29/2024Fire-Resistance Rated ConstructionWILLIAM MOORHEADprogress
05/29/2024Fenestration and door U-factor and product ratingsWILLIAM MOORHEADenergy_progress
05/29/2024Air barrier - visual inspectionWILLIAM MOORHEADenergy_progress
04/05/2023Insulation placement and R valuesWILLIAM MOORHEADenergy_progress
04/05/2023Air barrier — testing WILLIAM MOORHEADenergy_progress
04/05/2023Fenestration and door U-factor and product ratingsWILLIAM MOORHEADenergy_progress
04/05/2023FinalWILLIAM MOORHEADprogress
04/05/2023Fire-Resistance Rated ConstructionWILLIAM MOORHEADprogress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00496334-I1Request digital key ↗
09/03/2026M00496334-P3Request digital key ↗
09/03/2026M00496334-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026M00496334-P2Open ↗
08/29/2026M00496334-P2Open ↗
08/29/2026M00496334-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00496334-P3Open ↗
09/03/2026M00496334-P2Open ↗
09/03/2026M00496334-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026M00496334-P3Open ↗
08/23/2026M00496334-P3Open ↗
08/23/2026M00496334-P3Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00496334-P3Open ↗
09/03/2026M00496334-S1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00496334-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00496334-I1Open ↗