← Back
Walk-up apt, over six families with stores
146 2 AVENUE
MANHATTAN · BIN 1077564
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
R7AZoning
38,243 sfGross Floor Area
62Units
Rent Stabilized19 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 269 ASSOCIATES, LLC · 9,412 sf lot · 4.06 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
269 ASSOCI403/21/2026
269 ASSOCIATES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NORMAN C. LOK, PE209/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NORTHEAST EXPEDITING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CBB PLUMBING CORPPlumbing207/08/2026
BIRNBAUM, ALANElectrical103/21/2026
DANUBE ELECTRIC CO., INC.Electrical103/22/2026
JOSEF BOSROKElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
TRIDENT BUILDERS GROUPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818209/11/2025
Building Lifecycle
All (33)Filed (2)Permit Issued (2)Signed Off (2)Violation (21)Inspection (2)Special Inspection (4)
03/05/2026
Signed off — Alteration
Plumbing for interior renovation of apartment 4A
M01201582-S1
03/05/2026
Signed off — Alteration
Plumbing for interior renovation of apartment 4A
M01201582-I1
01/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2025
Permit issued — General Construction
M01201582-I1-GC
10/22/2025
Permit issued — Plumbing
M01201582-S1-PL
09/11/2025
Filed — Alteration
Plumbing for interior renovation of apartment 4A
M01201582-S1
09/07/2025
Violation issued (HPD, closed)
C
09/07/2025
Violation issued (HPD, closed)
A
09/07/2025
Violation issued (HPD, closed)
A
08/19/2025
Filed — Alteration
Plumbing for interior renovation of apartment 4A
M01201582-I1
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NORMAN LOK
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
NORMAN LOK
03/26/2025
Special inspection requirement — Final
ADITYA DESAI
11/02/2022
Violation issued (HPD, closed)
I
03/04/2022
Violation issued (HPD, open)
B
03/04/2022
Violation issued (HPD, closed)
B
03/04/2022
Violation issued (HPD, closed)
C
03/04/2022
Violation issued (HPD, closed)
C
03/04/2022
Violation issued (HPD, closed)
A
03/04/2022
Violation issued (HPD, closed)
C
03/04/2022
Violation issued (HPD, closed)
C
03/04/2022
Violation issued (HPD, closed)
B
03/04/2022
Violation issued (HPD, open)
A
05/16/2013
Violation issued (HPD, closed)
C
05/16/2013
Violation issued (HPD, closed)
B
05/16/2013
Violation issued (HPD, closed)
B
10/15/2011
Violation issued (HPD, closed)
B
04/09/2008
Violation issued (HPD, closed)
B
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTRIDENT BUILDERS GROUP10/22/2025
DOB NOWPlumbingSigned-offCBB PLUMBING CORP10/22/2025
BISPLISSUEDAJIT ONE MECH&GEN'L CONTR12/11/2002
BISOTISSUEDCRAFTSMAN CONSTRUCTION CORP.09/20/2002
BISMHISSUEDGEO CONTR.04/18/2001
BISOTISSUEDGEO CONTRACTING CORP04/26/2000
BISPLISSUEDDV PLUMBING INC04/24/2000
1 job · most recent 10/23/2025
General Wiring
FiledStatusContractorScope
10/23/2025CompleteDANUBE ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/26/2025Fire-Resistant Penetrations and JointsNORMAN LOKspecial
03/26/2025Tenant Protection Plan ComplianceNORMAN LOKspecial
03/26/2025Fire-Resistance Rated ConstructionNORMAN LOKprogress
03/26/2025FinalADITYA DESAIprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026M01201582-I1Request digital key ↗
08/21/2026M01201582-S1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026M01201582-I1Open ↗
08/21/2026M01201582-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M01201582-I1Open ↗
08/25/2026M01201582-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M01201582-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/21/2026M01201582-I1Open ↗
08/21/2026M01201582-S1Open ↗
▸Other Documents2
▸DOB NOWWaiver Document2
08/13/2026M01201582-I1Open ↗
08/13/2026M01201582-S1Open ↗