← Back
Walk-up apt, over six families with stores
64 EAST BROADWAY
MANHATTAN · BIN 1077596
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
C6-1GZoning
15,082 sfGross Floor Area
28Units
Rent Stabilized18 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 64 EAST BROADWAY REALTY · 3,438 sf lot · 4.39 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 53p · 1 filing · 15 docs
Floor 41p · 1 filing · 15 docs
Floor 32p · 1 filing · 15 docs
Floor 21p · 1 filing · 15 docs
Floor 1
Cellar1p · 1 filing · 15 docs
Sub-Cellar1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
98 RIVINGTON REALTY1407/08/2026
64 EAST BROADWAY REALTY LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REVANS DESIGN PE PC405/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUSKA803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEMAR MECHANICAL INCPlumbing207/08/2026
DEMAR PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REVANS DESIGN PE PC4617405/08/2023
Building Lifecycle
All (81)Filed (4)Permit Issued (4)Signed Off (2)Violation (60)Inspection (5)Special Inspection (6)
07/28/2026
Violation issued (HPD, open)
B
07/28/2026
Violation issued (HPD, closed)
C
07/28/2026
Violation issued (HPD, closed)
C
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
A
07/27/2026
Violation issued (HPD, closed)
C
07/27/2026
Violation issued (HPD, open)
B
01/15/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, closed)
C
04/01/2024
Violation issued (HPD, closed)
A
09/01/2023
Signed off — Alteration
REPLACE NEW GAS METER BARS, GAS METERS, & GAS PIPING AS PER PLANS. RECONNECT TO EXISTING APPLIANCES. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487575-I1
08/31/2023
Signed off — Alteration
REPLACE (1) NEW LOW PRESSURE BOILER & INTEGRAL BURNER IN SAME PLACES AS EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00487547-I1
05/08/2023
Filed — Alteration
REPLACE NEW GAS METER BARS, GAS METERS, & GAS PIPING AS PER PLANS. RECONNECT TO EXISTING APPLIANCES. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487575-P2
04/25/2023
Violation issued (HPD, closed)
C
04/25/2023
Violation issued (HPD, closed)
A
04/25/2023
Violation issued (HPD, open)
C
04/25/2023
Violation issued (HPD, closed)
B
04/25/2023
Violation issued (HPD, open)
B
04/25/2023
Violation issued (HPD, closed)
A
04/25/2023
Violation issued (HPD, closed)
B
03/15/2023
Violation issued (HPD, closed)
A
11/30/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/22/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/31/2022
Filed — Alteration
REPLACE NEW GAS METER BARS, GAS METERS, & GAS PIPING AS PER PLANS. RECONNECT TO EXISTING APPLIANCES. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487575-P1
09/14/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/26/2022
Permit issued — Boiler Equipment
M00487547-I1-BE
04/26/2022
Permit issued — Plumbing
M00487575-I1-PL
02/15/2022
Violation issued (HPD, closed)
A
11/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
11/15/2021
Special inspection requirement — Maintenance information
PAUL REVANS
09/14/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/20/2021
Permit issued — Plumbing
M00487575-I1-PL
05/20/2021
Permit issued — Boiler Equipment
M00487547-I1-BE
05/05/2021
Filed — Alteration
REPLACE NEW GAS METER BARS, GAS METERS, & GAS PIPING AS PER PLANS. RECONNECT TO EXISTING APPLIANCES. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487575-I1
05/05/2021
Filed — Alteration
REPLACE (1) NEW LOW PRESSURE BOILER & INTEGRAL BURNER IN SAME PLACES AS EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00487547-I1
05/03/2021
Violation issued (HPD, closed)
C
04/22/2021
Violation issued (HPD, closed)
B
04/22/2021
Violation issued (HPD, closed)
B
04/22/2021
Violation issued (HPD, closed)
C
04/22/2021
Violation issued (HPD, closed)
B
04/22/2021
Violation issued (HPD, closed)
C
04/22/2021
Violation issued (HPD, closed)
C
04/22/2021
Violation issued (HPD, closed)
B
03/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
03/16/2021
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
03/16/2021
Special inspection requirement — Maintenance information
PAUL REVANS
03/16/2021
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
10/04/2020
Violation issued (HPD, closed)
A
10/04/2020
Violation issued (HPD, closed)
A
10/04/2020
Violation issued (HPD, closed)
A
09/02/2020
Violation issued (HPD, closed)
A
09/02/2020
Violation issued (HPD, closed)
A
09/02/2020
Violation issued (HPD, closed)
C
09/02/2020
Violation issued (HPD, closed)
B
09/02/2020
Violation issued (HPD, closed)
C
09/02/2020
Violation issued (HPD, closed)
B
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC04/26/2022
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC04/26/2022
DOB NOWPlumbingSigned-offDEMAR PLUMBING CORP05/20/2021
DOB NOWBoiler EquipmentSigned-offDEMAR PLUMBING CORP05/20/2021
BISPLISSUEDCHOU & CHEN CO INC.03/06/1991
BISOTISSUEDHIP HING CONST. CO02/26/1991
BISOTISSUEDHIP HING CONSTRUCTION CO.12/12/1990
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/30/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/22/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/14/2022Pass-Final Boiler Equipment InspectionPassView ↗
09/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/15/2021Fire-Resistant Penetrations and JointsPAUL REVANSspecial
11/15/2021Maintenance informationPAUL REVANSenergy_progress
03/16/2021Fire-Resistant Penetrations and JointsPAUL REVANSspecial
03/16/2021HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
03/16/2021Maintenance informationPAUL REVANSenergy_progress
03/16/2021HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00487575-I1Request digital key ↗
09/03/2026M00487575-P1Request digital key ↗
09/03/2026M00487575-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00487575-I1Open ↗
09/03/2026M00487575-P1Open ↗
09/03/2026M00487547-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M00487547-I1Open ↗
08/28/2026M00487575-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026M00487547-I1Open ↗
08/28/2026M00487575-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00487575-I1Open ↗
09/03/2026M00487575-P1Open ↗
09/03/2026M00487547-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00487547-I1Open ↗
08/13/2026M00487575-I1Open ↗
▸Other Documents4
▸DOB NOWDHCR Document4
09/03/2026M00487575-P1Open ↗
09/03/2026M00487575-I1Open ↗
09/03/2026M00487547-I1Open ↗
Showing 3 of 4 on file for this type