← Back
Elevator co-op, conversion from loft/warehouse
114 WEST 29 STREET
MANHATTAN · BIN 1078687
💬 Discuss this project
1912Year Built
4Stories
D0Building Class
M1-8A/R11Zoning
73,668 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized4 Open Violations ▸
Elevator co-op, conversion from loft/warehouse · Owner of record: WEST 29TH ST OWNERS · 8,394 sf lot · 8.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 24p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST 29TH STREET OWNERS603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUSTAINABLE DESIGN ENGINEERING PLLC612/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GAUDIOSO CONTRACTING INCGeneral Contractor407/08/2026
FINE MECHANICAL CORPPlumbing407/08/2026
MICHAEL BOSSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUSTAINABLE DESIGN ENGINE1404412/16/2024
Building Lifecycle
All (45)Filed (6)Permit Issued (4)Signed Off (3)Violation (11)Inspection (3)Special Inspection (18)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
01/10/2025
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-S2
01/03/2025
Special inspection requirement — Mechanical Systems
Kenny Mak
01/03/2025
Special inspection requirement — Final
Kayan Tse
01/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
01/03/2025
Special inspection requirement — Maintenance information
Kenny Mak
01/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenny Mak
01/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Kenny Mak
01/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Kenny Mak
12/16/2024
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-P3
11/08/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-I1
10/25/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-S1
10/17/2024
Permit issued — Mechanical Systems
M00896970-S2-MS
10/15/2024
Special inspection requirement — Maintenance information
Kenny Mak
10/15/2024
Special inspection requirement — Mechanical Systems
Kenny Mak
10/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
10/15/2024
Special inspection requirement — Final
Kayan Tse
10/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenny Mak
10/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Kenny Mak
10/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Kenny Mak
10/07/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/15/2024
Permit issued — General Construction
M00896970-I1-GC
05/20/2024
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-S2
05/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2024
Violation issued (HPD, closed)
A
03/26/2024
Permit issued — Plumbing
M00896970-S1-PL
03/21/2024
Permit issued — General Construction
M00896970-I1-GC
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
01/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
01/09/2024
Special inspection requirement — Final
Shamsul Siddique
01/09/2024
Special inspection requirement — Lighting in dwelling units
Kenny Mak
12/22/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-P2
12/22/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-P1
09/06/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-I1
09/06/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE 2ND FLOOR APARTMENT. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW PARTITIONS & FINISHES, NEW DROP CEILING, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00896970-S1
03/15/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
04/01/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGAUDIOSO CONTRACTING10/17/2024
DOB NOWGeneral ConstructionSigned-offGAUDIOSO CONTRACTING07/15/2024
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP03/26/2024
DOB NOWGeneral ConstructionSigned-offGAUDIOSO CONTRACTING03/21/2024
BISOTISSUEDURBAN D.C. INC10/25/2000
BISOTISSUEDFPC CONSTRUCTION09/30/1997
BISOTISSUED14TH STREET REALTY ASSOCIATION03/30/1995
1 project · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024CompleteLMS ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/03/2025Mechanical SystemsKenny Makspecial
01/03/2025FinalKayan Tseprogress
01/03/2025Energy Code Compliance InspectionsKenny Makprogress
01/03/2025Maintenance informationKenny Makenergy_progress
01/03/2025HVAC-R and service water piping design and insulationKenny Makenergy_progress
01/03/2025HVAC-R and service water heating system controlsKenny Makenergy_progress
01/03/2025HVAC-R and service water heating equipmentKenny Makenergy_progress
10/15/2024Maintenance informationKenny Makenergy_progress
10/15/2024Mechanical SystemsKenny Makspecial
10/15/2024Energy Code Compliance InspectionsKenny Makprogress
10/15/2024FinalKayan Tseprogress
10/15/2024HVAC-R and service water piping design and insulationKenny Makenergy_progress
10/15/2024HVAC-R and service water heating system controlsKenny Makenergy_progress
10/15/2024HVAC-R and service water heating equipmentKenny Makenergy_progress
01/09/2024Fire-Resistant Penetrations and JointsKenny Makspecial
01/09/2024Energy Code Compliance InspectionsKenny Makprogress
01/09/2024FinalShamsul Siddiqueprogress
01/09/2024Lighting in dwelling unitsKenny Makenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026M00896970-I1Request digital key ↗
08/29/2026M00896970-P3Request digital key ↗
08/29/2026M00896970-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature15
08/30/2026M00896970-I1Open ↗
08/30/2026M00896970-I1Open ↗
08/30/2026M00896970-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026M00896970-I1Open ↗
08/29/2026M00896970-S2Open ↗
08/29/2026M00896970-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/30/2026M00896970-I1Open ↗
08/29/2026M00896970-P3Open ↗
08/27/2026M00896970-S2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026M00896970-S2Open ↗
08/29/2026M00896970-S1Open ↗
08/29/2026M00896970-I1Open ↗
Showing 3 of 6 on file for this type