← Back
Walk-up apt, over six families with stores
260 BROOME STREET
MANHATTAN · BIN 1079706
💬 Discuss this project
1900Year Built
6Stories
C7Building Class
C4-4AZoning
17,353 sfGross Floor Area
16Units
Rent Stabilized41 Open Violations ▸
Walk-up apt, over six families with stores · 2,576 sf lot · 6.74 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
Floor 1Under Construction6p · 2 filings · 16 docs
CellarUnder Construction8p · 2 filings · 16 docs
1 job · most recent 05/23/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/23/2024Permit IssuedTHE REPUBLIC TRADING CO,Heating and Air Conditioning Systems
Heat / Cool
Daikin FXTQ18TAVJUA 600 CFM · Vrf Indoor ×1
RXSQ24TBVJUA 23,000 BTU · Vrf Outdoor ×1
1 job · most recent 06/04/2018
General Wiring Lighting
FiledStatusContractorScope
06/04/2018CompleteWIRETECH ELECTRIC CORPGeneral Wiring, Lighting
Building Lifecycle
All (68)Filed (3)Permit Issued (5)Signed Off (1)Violation (37)Objection (4)Special Inspection (18)
09/16/2026
Permit issued — Mechanical Systems
M01051329-I1-MS
04/29/2026
Violation issued (HPD, open)
A
03/05/2026
Permit issued — General Construction
M01037410-I1-GC
11/17/2025
Violation issued (HPD, closed)
I
07/03/2025
Permit issued — General Construction
M01037410-I1-GC
07/01/2025
Permit issued — Mechanical Systems
M01051329-I1-MS
06/04/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, closed)
I
06/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
05/29/2024
Objection raised — Scope
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Inspections
05/29/2024
Objection resolved — Addressed
05/28/2024
Filed — Alteration
Herewith filing interior alterations, work to include general construction as per plans submitted. There is no change to use, egress or occupancy under this application.
M01037410-I1
05/23/2024
Filed — Alteration
Herewith filing installation of mechanical equipment as per plans submitted. No change to use, egress or occupancy under this application.
M01051329-I1
05/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Crosetto
05/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Crosetto
05/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Crosetto
05/16/2024
Special inspection requirement — Maintenance information
Nicolas Crosetto
05/16/2024
Special inspection requirement — Shutoff dampers
Nicolas Crosetto
05/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIZABETH HARDWICK
05/16/2024
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
05/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIZABETH HARDWICK
05/16/2024
Special inspection requirement — Preliminary
Nicolas Crosetto
05/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Dominick Pilla
05/14/2024
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
05/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
Dominick Pilla
05/14/2024
Special inspection requirement — Final
Nicolas Crosetto
04/17/2024
Special inspection requirement — Final
ELIZABETH HARDWICK
04/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIZABETH HARDWICK
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, closed)
I
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Violation issued (HPD, open)
A
11/02/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, closed)
I
01/31/2022
Signed off — Alteration
Application filed for Equipment Use Cards only. No work to be performed. All mechanical work filed, approved and signed off under Alt. 123338753
M00657447-I1
01/22/2022
Permit issued — Mechanical Systems
M00657447-I1-MS
01/06/2022
Filed — Alteration
Application filed for Equipment Use Cards only. No work to be performed. All mechanical work filed, approved and signed off under Alt. 123338753
M00657447-I1
01/05/2022
Special inspection requirement — Final
Ari Kamo
01/05/2022
Special inspection requirement — Mechanical Systems
Ari Kamo
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/05/2018
Violation issued (HPD, closed)
I
07/24/2018
Violation issued (ECB, closed)
Construction
11/06/2017
Violation issued (HPD, closed)
I
10/24/2016
Violation issued (HPD, closed)
I
11/24/2015
Violation issued (HPD, closed)
B
11/24/2015
Violation issued (HPD, closed)
B
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/12/2010
Violation issued (HPD, closed)
B
05/12/2010
Violation issued (HPD, closed)
B
07/01/2008
Violation issued (ECB, closed)
Construction
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2002
Violation issued (HPD, closed)
B
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 68 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TENEMENT MUSEUM709/17/2026
LOWER EST SIDE TENEMENT MUSUEM1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PERKINS EASTMAN105/28/2024
KOHLER RONAN, LLC205/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING403/21/2026
EFG CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LOWER EAST SIDE TENEMENTGeneral Contractor303/21/2026
THE REPUBLIC TRADING CO,General Contractor309/17/2026
TOMASZ SZYSZKAElectrical103/21/2026
STREAMLINE USA LLCGeneral Contractor107/08/2026
WATER DYNAMIC P & H CORPPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMINICK R. PILLA1300205/28/2024
GIANTS IN THE DIRT9101205/28/2024
MEP INSPECTIONS, INC1102105/23/2024
AK ENGINEERING PC678101/06/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTHE REPUBLIC TRADING CO,09/16/2026
DOB NOWGeneral ConstructionPermit IssuedTHE REPUBLIC TRADING CO,03/05/2026
DOB NOWGeneral ConstructionPermit IssuedLOWER EAST SIDE TENEMENT07/03/2025
DOB NOWMechanical SystemsPermit IssuedTHE REPUBLIC TRADING CO,07/01/2025
DOB NOWMechanical SystemsSigned-offSTREAMLINE USA LLC01/22/2022
BISOTISSUEDSTREAMLINE USA LLC05/07/2018
BISMHISSUEDSTREAMLINE USA LLC05/07/2018
BISEQISSUEDROCKLEDGE SCAFFOLD CORP09/17/2009
BISEQISSUEDROCKLEDGE SCAFFOLD CORP09/30/2008
BISPLISSUEDNYC PLUMBING & HEATING IN07/30/2002
BISMHISSUEDMOAH AND DAVID CONSSTRUCTION07/19/2002
BISEQISSUEDMOAH AND DAVID CONSSTRUCTION07/19/2002
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/27/2024Energy Code Compliance InspectionsNicolas Crosettoprogress
05/16/2024HVAC-R and service water heating system controlsNicolas Crosettoenergy_progress
05/16/2024HVAC-R and service water piping design and insulationNicolas Crosettoenergy_progress
05/16/2024HVAC-R and service water heating equipmentNicolas Crosettoenergy_progress
05/16/2024Maintenance informationNicolas Crosettoenergy_progress
05/16/2024Shutoff dampersNicolas Crosettoenergy_progress
05/16/2024Fire-Resistant Penetrations and JointsELIZABETH HARDWICKspecial
05/16/2024Post-installed AnchorsNicolas Crosettospecial
05/16/2024Fire-Resistance Rated ConstructionELIZABETH HARDWICKprogress
05/16/2024PreliminaryNicolas Crosettoprogress
05/15/2024Tenant Protection Plan ComplianceDominick Pillaspecial
05/14/2024Mechanical SystemsNicolas Crosettospecial
05/14/2024Tenant Protection Plan ComplianceDominick Pillaspecial
05/14/2024FinalNicolas Crosettoprogress
04/17/2024FinalELIZABETH HARDWICKprogress
04/17/2024Fire-Resistant Penetrations and JointsELIZABETH HARDWICKspecial
01/05/2022FinalAri Kamoprogress
01/05/2022Mechanical SystemsAri Kamospecial
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00657447-I1Request digital key ↗
08/27/2026M01037410-I1Request digital key ↗
08/14/2026M01051329-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
04/16/2019123338753Open ↗
03/27/2019123338753Open ↗
09/19/2017123338753Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION5
05/08/2018123338753Open ↗
05/08/2018123338753Open ↗
12/14/2010110278734Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
05/20/2019123338753Open ↗
05/20/2019123338753Open ↗
05/17/2019123338753Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026M00657447-I1Open ↗
08/23/2026M01037410-I1Open ↗
08/23/2026M01051329-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026M00657447-I1Open ↗
08/23/2026M01037410-I1Open ↗
08/23/2026M01037410-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026M01051329-I1Open ↗
08/13/2026M01037410-I1Open ↗
08/13/2026M00657447-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/19/2017123338753Open ↗
09/26/2008110278734Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/19/2017123338753Open ↗
09/19/2017123338753Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/26/2008110278734Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/19/2017123338753Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01037410-I1Open ↗
08/13/2026M01051329-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/26/2008110278734Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/19/2017123338753Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/20/2019123338753Open ↗
05/17/2019123338753Open ↗
04/04/2018123338753Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/20/2019123338753Open ↗
05/17/2019123338753Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/18/2011110278734Open ↗
12/14/2010110278734Open ↗
12/14/2010110278734Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/20/2019123338753Open ↗
05/17/2019123338753Open ↗
11/18/2011110278734Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/26/2008110278734Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/20/2019123338753Open ↗
05/17/2019123338753Open ↗
09/19/2017123338753Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION3
11/27/2018123338753Open ↗
03/14/2018123338753Open ↗
03/14/2018123338753Open ↗
▸BISBOROUGH INTAKE FORM3
05/20/2019123338753Open ↗
05/17/2019123338753Open ↗
03/27/2019123338753Open ↗
▸BISEFILING COVER SHEET2
09/19/2017123338753Open ↗
09/19/2017123338753Open ↗
▸BISeFiling Job Application Cover Sheet1
09/26/2008110278734Open ↗