DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
HPD11/23/1992§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LOCKED FRONT ENTRANCE DOOR PREVINTING ACCESS TO BELLS TO APTS.
HPD03/04/1986SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION EAST WALL PIERCED AT CELLAR FRONT CREATING ARCHWAY TO 318 WEST 45TH ST.
HPD03/04/1986§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALLS PIERCED CELLAR FRONT CREATING ARCHWAY BETWEEN 316 AND 320 WEST 45TH STREET BLDGS.
HPD03/04/1986§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING AT WEST WALL TO ADJOINING BUILDING IN CELLAR.
HPD11/25/1985§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING AT WEST WALL AT ADJOINING BUILDING.
HPD11/25/1985§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WEST WALL PIERCED AT CELLAR FRONT CREATING ARCHWAY TO 318 W 145 ST.
ECB11/29/2017FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED.AT TIME OF SPOT CHECK INSPECTION FOR PLUMBING ROUGHING I OBSERVED ALL WALLS WAS CLOSED AT TIME OF INSPECTION & ALL PLUMBING CONTINUED WAS WORKING.PHOTO TAKENothing owed — awaiting certificate of correction
ECB11/29/2017FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION NO APPROVED PLANS ORSITE AT TIME OF A SPOT CHECK INSPECTION FORWASTE,WATER&SHOWER ROUGHING.REM:PROVIDE PLANS.Nothing owed — awaiting certificate of correction
ECB12/15/1997FAILURE TO PROVIDE APPROVED PLANS AT TIEM OF INSPECTION ALT AT 2N AND 3RD STORY ROOF. REMEDY: STOP ALL WORK PROVIDE APPROVED PLANS SO THAT AN INSPECTION CAN BE MADE.Nothing owed — awaiting certificate of correction
ECB11/21/1990OPERATION OF PA WITHOUT A CURRENT PERMIT. REMEDY - OBTAIN A CURRENT PERMIT. FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION - REMEDY - OBTAIN & PROVIDE APPROVAL PAPLANS AND OBTAIN A CURRENT PERMIT.Nothing owed — awaiting certificate of correction