← Back
Walk-up apt, over six families with stores
247 EAST 31 STREET
MANHATTAN · BIN 1081626
💬 Discuss this project
1910Year Built
4Stories
C7Building Class
C1-8AZoning
12,432 sfGross Floor Area
29Units
Rent Stabilized8 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: MARCHI RLTY CORP · 5,728 sf lot · 2.17 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 7 docs
Floor 4Under Construction1 filing · 4 docs
Floor 3Under Construction2p · 2 filings · 11 docs
Floor 2Under Construction2p · 2 filings · 11 docs
Floor 1Under Construction2p · 2 filings · 11 docs
CellarUnder Construction5p · 3 filings · 18 docs
BasementUnder Construction1p · 1 filing · 7 docs
1 job · most recent 08/07/2026
FiledStatusContractorScope
08/07/2026——26 heads
1 job · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 job · most recent 08/07/2026
Sidewalk Shed
FiledStatusContractorScope
08/07/2026Permit IssuedCELTIC SERVICES NYC INCSidewalk Shed
Building Lifecycle
All (45)Filed (6)Permit Issued (4)Violation (21)Objection (2)Special Inspection (12)
08/07/2026
Filed — Full Demolition
CUT/CAP & REMOVE SPRINKLER SYSTEM IN BASEMENT, FLOORS 1-3 PRIOR TO FULL DEMOLITION OF BUILDING
M01330795-S2
08/07/2026
Permit issued — Sidewalk Shed
M01330795-S2-SH
08/03/2026
Permit issued — General Construction
M01436805-I1-GC
07/30/2026
Filed — Alteration
INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS, CEILINGS, FLOORS, FINISHES & BOILERs AS PER PLANS FILED HEREWITH TO PREPARE FOR FULL DEMOLITION UNDER SEPARATE FILING 249 E 31 ST & REAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01436805-I1
07/27/2026
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
06/02/2026
Objection resolved — Addressed
05/07/2026
Violation issued (HPD, open)
A
02/26/2026
Objection raised — Other
02/20/2026
Filed — Full Demolition
CUT/CAP & REMOVE SPRINKLER SYSTEM IN BASEMENT, FLOORS 1-3 PRIOR TO FULL DEMOLITION OF BUILDING
M01330795-I1
02/20/2026
Filed — Full Demolition
CUT/CAP & REMOVE SPRINKLER SYSTEM IN BASEMENT, FLOORS 1-3 PRIOR TO FULL DEMOLITION OF BUILDING
M01330795-S1
12/09/2025
Special inspection requirement — Demolition
TONY ONYEAGORO
12/09/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
TONY ONYEAGORO
12/09/2025
Special inspection requirement — Sprinkler Systems
TONY ONYEAGORO
06/12/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, closed)
I
04/16/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
08/08/2023
Permit issued — Boiler Equipment
M00803534-I1-BE
08/08/2023
Permit issued — Plumbing
M00803646-I1-PL
07/25/2023
Filed — Alteration
M00803534-I1
07/25/2023
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BOILER.
M00803646-I1
03/29/2023
Violation issued (HPD, closed)
A
12/29/2022
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/29/2022
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/22/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
12/22/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
12/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/22/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
12/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/02/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
I
11/23/2016
Violation issued (HPD, closed)
I
10/16/2015
Violation issued (HPD, closed)
I
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/07/1986
Violation issued (HPD, open)
A
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CELTIC SERVICES NYC309/13/2026
MARCHI REALTY807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHI PRO GROUP203/21/2026
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY GAS HTG SVC CO INCPlumbing207/08/2026
CELTIC SERVICES NYC INCGeneral Contractor108/08/2026
DTO ALTERATIONS LLCGeneral Contractor108/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034202/20/2026
NEW YORK ENGINEERING ASSO851207/25/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCELTIC SERVICES NYC INC08/07/2026
DOB NOWGeneral ConstructionPermit IssuedDTO ALTERATIONS LLC08/03/2026
DOB NOWBoiler EquipmentPermit IssuedCITY GAS HTG SVC CO INC08/08/2023
DOB NOWPlumbingPermit IssuedCITY GAS HTG SVC CO INC08/08/2023
BISPLISSUEDTHEODORE WAGNER PLM & HTNG05/19/1993
BIS—ISSUEDWIN SING INC05/13/1993
BIS—ISSUEDWIN SING INC10/27/1992
BISMHISSUEDWIN SING INC10/22/1992
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/27/2026FinalROBESPIERRE ARISTILDEprogress
12/09/2025DemolitionTONY ONYEAGOROspecial
12/09/2025Structural Stability – Alterations of existing BuildingsTONY ONYEAGOROspecial
12/09/2025Sprinkler SystemsTONY ONYEAGOROspecial
12/29/2022Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/29/2022Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/22/2022Heating SystemsLOUIS ARENAspecial
12/22/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
12/22/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/22/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/22/2022Maintenance informationLOUIS ARENAenergy_progress
12/22/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026M00803646-I1Request digital key ↗
08/29/2026M00803534-I1Request digital key ↗
08/16/2026M01436805-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00803534-I1Open ↗
09/23/2026M00803534-I1Open ↗
08/30/2026M01330795-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M00803534-I1Open ↗
08/28/2026M00803646-I1Open ↗
08/23/2026M01436805-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026M00803646-I1Open ↗
08/29/2026M00803534-I1Open ↗
08/16/2026M01436805-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/29/2026M00803646-I1Open ↗
08/29/2026M00803534-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/16/2026M01436805-I1Open ↗
▸Other Documents1
▸DOB NOWStructure Photographs1
08/13/2026M01330795-I1Open ↗