← Back
Five to six families
160 EAST 36TH STREET
MANHATTAN · BIN 1082109
💬 Discuss this project
1910Year Built
4Stories
C2Building Class
C1-9Zoning
3,954 sfGross Floor Area
5Units
20 Open Violations ▸
Five to six families · Owner of record: 160 EAST 36TH STREET LLC · 988 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof2p · 2 filings · 14 docs
Floor 44p · 1 filing · 4 docs
Floor 31p · 1 filing · 4 docs
Floor 22p · 1 filing · 4 docs
Floor 1
Cellar4p · 1 filing · 4 docs
1 job · most recent 12/29/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/29/2025——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3M36NAMHZ-U1 36,000 BTU · Condensing Unit ×3
MXZ-3C30NA3-U1 28,400 BTU · Condensing Unit ×2
Heating
Markel E3323TD-RP 175 CFM · Electric Heater ×4
Ventilation
Panasonic Panasonic FV-06VE1 60 CFM · Erv ×5
1 job · most recent 12/29/2025
Sprinkler System
FiledStatusContractorScope
12/29/2025——Sprinkler System
1 job · most recent 12/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/29/2025——Storm, Water/Sanitary
1 job · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedS&F ELECTRICAL SERVICE INGeneral Wiring
Building Lifecycle
All (66)Filed (6)Violation (60)
08/14/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL 4 STORY AND CELLAR BUILDING. COMBINING 2 UNITS AT 1ST FLOOR INTO 1 AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01249857-S1
08/14/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL 4 STORY AND CELLAR BUILDING. COMBINING 2 UNITS AT 1ST FLOOR INTO 1 AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01249857-S2
05/07/2026
Violation issued (HPD, open)
A
12/29/2025
Filed — Alteration CO
NEW HVAC AND VENTILATION SYSTEMS IN CONJUNCTION WITH I1 FILING
M01289821-S2
12/29/2025
Filed — Alteration CO
NEW HVAC AND VENTILATION SYSTEMS IN CONJUNCTION WITH I1 FILING
M01289821-S1
11/17/2025
Filed — Alteration CO
NEW HVAC AND VENTILATION SYSTEMS IN CONJUNCTION WITH I1 FILING
M01289821-I1
07/08/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL 4 STORY AND CELLAR BUILDING. COMBINING 2 UNITS AT 1ST FLOOR INTO 1 AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01249857-I1
06/12/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, closed)
I
04/16/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
02/27/2019
Violation issued (HPD, closed)
C
02/27/2019
Violation issued (HPD, open)
C
02/25/2019
Violation issued (HPD, open)
C
02/25/2019
Violation issued (HPD, open)
C
02/08/2019
Violation issued (HPD, open)
C
02/08/2019
Violation issued (HPD, open)
C
02/08/2019
Violation issued (HPD, closed)
C
02/08/2019
Violation issued (HPD, closed)
C
01/31/2019
Violation issued (HPD, closed)
C
01/31/2019
Violation issued (HPD, open)
C
09/25/2018
Violation issued (HPD, open)
A
04/04/2018
Violation issued (HPD, open)
C
04/04/2018
Violation issued (HPD, open)
A
04/04/2018
Violation issued (HPD, open)
B
04/04/2018
Violation issued (HPD, open)
B
08/01/2017
Violation issued (HPD, closed)
B
08/01/2017
Violation issued (HPD, closed)
C
08/01/2017
Violation issued (HPD, closed)
B
08/01/2017
Violation issued (HPD, closed)
B
08/01/2017
Violation issued (HPD, closed)
A
08/01/2017
Violation issued (HPD, closed)
B
08/01/2017
Violation issued (HPD, closed)
B
06/16/2017
Violation issued (HPD, closed)
B
05/17/2017
Violation issued (HPD, closed)
B
05/17/2017
Violation issued (HPD, closed)
B
05/17/2017
Violation issued (HPD, closed)
A
05/17/2017
Violation issued (HPD, closed)
B
05/17/2017
Violation issued (HPD, open)
B
05/17/2017
Violation issued (HPD, closed)
B
05/17/2017
Violation issued (HPD, closed)
A
05/17/2017
Violation issued (HPD, closed)
B
05/17/2017
Violation issued (HPD, closed)
B
05/17/2017
Violation issued (HPD, closed)
C
05/17/2017
Violation issued (HPD, closed)
B
05/12/2017
Violation issued (HPD, closed)
C
05/12/2017
Violation issued (HPD, closed)
B
05/12/2017
Violation issued (HPD, closed)
B
05/12/2017
Violation issued (HPD, closed)
B
05/12/2017
Violation issued (HPD, closed)
B
04/10/2017
Violation issued (HPD, closed)
B
04/10/2017
Violation issued (HPD, closed)
B
04/10/2017
Violation issued (HPD, closed)
C
04/10/2017
Violation issued (HPD, closed)
B
04/10/2017
Violation issued (HPD, closed)
B
04/10/2017
Violation issued (HPD, closed)
B
04/10/2017
Violation issued (HPD, closed)
B
03/28/2017
Violation issued (HPD, closed)
B
03/28/2017
Violation issued (HPD, closed)
B
Latest 60 of 66 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THIRD AVENUE PAVILION RESIDENCES, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADVANCED ENGINEERING & INSPECT. PLL408/14/2026
NY BUILDING ASSOCIATES INC211/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES803/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/13/2026Maintenance information—energy_progress
08/13/2026Fire-Resistant Penetrations and Joints—special
08/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/13/2026HVAC-R and service water heating system controls—energy_progress
08/13/2026HVAC-R and service water heating equipment—energy_progress
08/13/2026HVAC-R and service water piping design and insulation—energy_progress
12/24/2025HVAC-R and service water piping design and insulation—energy_progress
12/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
12/24/2025Fire-Resistant Penetrations and Joints—special
12/24/2025Energy Code Compliance Inspections—progress
12/24/2025HVAC-R and service water heating system controls—energy_progress
12/24/2025HVAC-R and service water heating equipment—energy_progress
12/24/2025Maintenance information—energy_progress
12/23/2025Sprinkler Systems—special
08/19/2025Sprinkler Systems—special
08/05/2025Air barrier - visual inspection—energy_progress
07/03/2025Energy Code Compliance Inspections—progress
07/03/2025Fire-Resistance Rated Construction—progress
07/03/2025Lighting controls—energy_progress
07/03/2025Insulation placement and R values—energy_progress
07/03/2025Fenestration air leakage—energy_progress
07/03/2025Lighting in dwelling units—energy_progress
07/03/2025Fenestration areas—energy_progress
07/03/2025Fenestration and door U-factor and product ratings—energy_progress
07/03/2025Interior lighting power—energy_progress
Latest 25 of 29.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026M01249857-S1Request digital key ↗
08/22/2026M01249857-S2Request digital key ↗
08/22/2026M01249857-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026M01249857-S1Open ↗
08/22/2026M01249857-S2Open ↗
08/13/2026M01249857-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026M01289821-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026M01249857-S1Open ↗
08/22/2026M01249857-S2Open ↗
08/15/2026M01249857-I1Open ↗