← Back
Walk-up apt, over six families with stores
280 LENOX AVENUE
MANHATTAN · BIN 1083975
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
C4-4AZoning
24,122 sfGross Floor Area
20Units
Rent Stabilized45 Open Violations 42 unresolved · 3 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: SHEBA REALTY II LLC · 5,800 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 14p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHEBA REALTY II LLC703/22/2026
SHEBA REALTY2003/22/2026
R P CONSTRUCTION US403/22/2026
SHEBA REALTY 11 LLC103/22/2026
OWNER OF 282 LENOX AVE303/22/2026
OWNER OF PREMISES #282 LE103/22/2026
LENNOX WEST REALTY CO103/22/2026
HPD103/21/2026
EMPIRESTATEEQUITIES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE L. PENA,P.E.305/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HARARI DAVIDElectrical103/21/2026
JOE MIDDLETONElectrical103/21/2026
LEONCIO REYESElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
Building Lifecycle
All (129)Filed (3)Violation (60)Objection (50)Special Inspection (16)
05/26/2022
Special inspection requirement — Maintenance information
05/26/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/26/2022
Special inspection requirement — Mechanical Systems
05/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/26/2022
Special inspection requirement — Final
05/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
05/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
05/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
05/25/2022
Filed — Alteration
Propose Mech Exhaust in Both Bathrooms, 8 Mechanical H.V.A.C vents through out space. Propose fire stopping at Front entrance Ceiling has been installed no longer exposing the wood cross beams, floor joists and subfloor. Propose work continue in comments
M00508697-P1
05/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/25/2022
Special inspection requirement — Mechanical Systems
05/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/25/2022
Special inspection requirement — Final
05/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
05/25/2022
Special inspection requirement — Maintenance information
05/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
05/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
03/08/2022
Violation issued (HPD, closed)
A
01/21/2022
Objection raised — Fire_Protection
01/21/2022
Objection resolved — Addressed
01/21/2022
Objection raised — Scope
01/21/2022
Objection resolved — Addressed
01/21/2022
Objection raised — Scope
01/21/2022
Objection resolved — Addressed
01/21/2022
Objection raised — Fire_Protection
01/21/2022
Objection resolved — Addressed
01/21/2022
Objection raised — Fire_Protection
01/21/2022
Objection resolved — Addressed
01/21/2022
Objection raised — Scope
01/21/2022
Objection resolved — Addressed
01/20/2022
Objection raised — Scope
01/20/2022
Objection resolved — Addressed
09/17/2021
Objection raised — Scope
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Other
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Fire_Protection
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Inspections
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Other
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Inspections
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Structural
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Accessibility
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Fire_Protection
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Other
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Accessibility
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Energy
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Accessibility
09/17/2021
Objection resolved — Addressed
09/17/2021
Objection raised — Fire_Protection
09/17/2021
Objection resolved — Addressed
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDR&P CONSTRUCTION US INC12/11/2017
BISEQISSUEDR&P CONSTRUCTION US INC07/07/2017
BISEQISSUEDGUL & G CONTRACTING INC03/10/2017
BISFBISSUEDAPPROVED OIL CO OF BKLYN02/23/2015
BISPLISSUEDTARDIO PLUMBING, LLC02/23/2015
1 project · most recent 05/25/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/25/2022——Air Conditioning Systems
Cooling
Daikin RXYQ168TTJU 160 BTU · Vrf Outdoor ×2
2 projects · most recent 11/13/2019
General Wiring
FiledStatusContractorScope
11/13/2019Permit IssuedLERCO ELECTRIC LLCGeneral Wiring
02/04/2019CompleteCORE ELECTRICAL CORP—
1 project · most recent 05/25/2022
FiledStatusContractorScope
05/25/2022——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/26/2022Maintenance information—energy_progress
05/26/2022Structural Stability – Alterations of existing buildings—special
05/26/2022Mechanical Systems—special
05/26/2022Fire-Resistant Penetrations and Joints—special
05/26/2022Final—progress
05/26/2022HVAC-R and service water piping design and insulation—energy_progress
05/26/2022HVAC-R and service water heating equipment—energy_progress
05/26/2022HVAC-R and service water heating system controls—energy_progress
05/25/2022Fire-Resistant Penetrations and Joints—special
05/25/2022Mechanical Systems—special
05/25/2022Structural Stability – Alterations of existing buildings—special
05/25/2022Final—progress
05/25/2022HVAC-R and service water piping design and insulation—energy_progress
05/25/2022Maintenance information—energy_progress
05/25/2022HVAC-R and service water heating system controls—energy_progress
05/25/2022HVAC-R and service water heating equipment—energy_progress
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/03/2026M00508697-P1Request digital key ↗
08/14/2026M00508697-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00261385-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION9
12/11/2019123864746Open ↗
12/08/2017123075901Open ↗
06/13/2017140654432Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION7
12/12/2017123075901Open ↗
06/13/2017140654432Open ↗
03/20/2017122950422Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
12/11/2019123864746Open ↗
12/08/2017123075901Open ↗
12/08/2017123075901Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
12/08/2017123075901Open ↗
03/15/2017122950422Open ↗
03/05/2015122277703Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/13/2017140654432Open ↗
03/15/2017122950422Open ↗
03/05/2015122277703Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026M00261385-I1Open ↗
08/13/2026M00508697-I1Open ↗
08/13/2026M00508697-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/18/2009120068639Open ↗
06/06/2008110195280Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/13/2017140654432Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/13/2017140654432Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/28/2015122277703Open ↗
03/05/2015122277703Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/05/2015122277703Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
12/11/2019123864746Open ↗
12/08/2017123075901Open ↗
06/13/2017140654432Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00261385-I1Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/11/2019123864746Open ↗
12/08/2017123075901Open ↗
06/13/2017140654432Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
06/18/2009120068639Open ↗
06/06/2008110195280Open ↗
06/18/2009120068639Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00508697-P1Open ↗
08/13/2026M00508697-I1Open ↗
08/13/2026M00261385-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/11/2019123864746Open ↗
12/08/2017123075901Open ↗
08/22/2016122277703Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
08/22/2016122277703Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/13/2017140654432Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/22/2016122277703Open ↗
07/09/2009110195280Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/18/2009120068639Open ↗
06/06/2008110195280Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT7
12/11/2019123864746Open ↗
12/08/2017123075901Open ↗
08/22/2016122277703Open ↗
Showing 3 of 7 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
07/07/2017140654432Open ↗
06/20/2017140654432Open ↗
06/20/2017140654432Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET6
12/11/2019123864746Open ↗
12/08/2017123075901Open ↗
03/15/2017122950422Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
09/28/2015122277703Open ↗
04/23/2015122277703Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/13/2017140654432Open ↗
▸Other Documents3
▸DOB NOWDHCR Document2
08/13/2026M00508697-I1Open ↗
08/13/2026M00508697-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/09/2009110195280Open ↗