← Back
Over six families without stores
213 WEST 13 STREET
MANHATTAN · BIN 1084956
💬 Discuss this project
1851Year Built
6Stories
C1Building Class
R6Zoning
13,000 sfGross Floor Area
24Units
Rent Stabilized4 Open Violations 1 unresolved · 3 paperwork only ▸
Over six families without stores · Owner of record: 213-215 WEST 13TH STREET ASSOCIATES, LLC · 3,125 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING707/08/2026
THE OWNER OF103/22/2026
MOBILE BOILER INC103/21/2026
213-215 W 13TH ST ASSOC203/21/2026
213-215 WEST 13TH STREET ASSOC603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC105/15/2023
SYED ENGINEERING, P.C.205/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor507/08/2026
EDWARDS ROLANDElectrical103/21/2026
NORMAN TCHERNOFFElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
ROLAND EDWARDSElectrical103/21/2026
Building Lifecycle
All (16)Filed (3)Permit Issued (3)Signed Off (2)Violation (7)Special Inspection (1)
09/24/2025
Violation issued (HPD, closed)
B
09/24/2025
Violation issued (HPD, closed)
C
05/18/2023
Permit issued — Supported Scaffold
M00874655-I1-SF
05/15/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00874655-I1
11/09/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00517953-I1
11/09/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00517954-I1
05/10/2021
Permit issued — Sidewalk Shed
M00517953-I1-SH
05/10/2021
Permit issued — Supported Scaffold
M00517954-I1-SF
05/09/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00517953-I1
05/09/2021
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00517954-I1
05/06/2021
Special inspection requirement — Final
RAFI HAMID
04/16/2021
Violation issued (HPD, closed)
A
12/10/2018
Violation issued (HPD, closed)
A
12/10/2018
Violation issued (HPD, closed)
A
04/20/2001
Violation issued (ECB, open)
Public Assembly
07/27/1993
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING05/18/2023
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/10/2021
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING05/10/2021
BISOTISSUEDRAFAEL ADAMI RESTORATION05/31/2017
BISPLISSUEDDNA PLUMBING CONTR. INC03/27/2017
BISOTISSUEDGGP CONTRACTING CORP02/01/2017
BISOTISSUEDACRON CONSTRUCTION CORP11/04/1998
BISOTISSUEDACRON RESTORATION CORP12/05/1997
1 project · most recent 05/14/2021
FiledStatusContractorScope
05/14/2021Permit IssuedRICHARD NEU—
1 project · most recent 05/15/2023
Scaffold
FiledStatusContractorScope
05/15/2023Permit IssuedTOPLINE NYC CONTRACTINGScaffold
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
05/06/2021FinalRAFI HAMIDprogress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00517954-I1Request digital key ↗
09/03/2026M00517953-I1Request digital key ↗
08/31/2026M00874655-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
05/10/2017123009341Open ↗
05/04/2017123009341Open ↗
02/02/2017123009341Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
06/02/2017122935388Open ↗
04/06/2017123009341Open ↗
02/02/2017123009341Open ↗
▸Seals & Professional Certifications13
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/02/2017123009341Open ↗
02/02/2017123009341Open ↗
02/02/2017123009341Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/07/2019122935388Open ↗
02/02/2017123009341Open ↗
11/22/2016122935388Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026M00517953-I1Open ↗
08/13/2026M00517954-I1Open ↗
08/13/2026M00874655-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/02/2017123009341Open ↗
11/22/2016122935388Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M00517954-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/10/2017123009341Open ↗
05/04/2017123009341Open ↗
02/02/2017123009341Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
02/02/2017123009341Open ↗
11/22/2016122935388Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/02/2017123009341Open ↗
11/22/2016122935388Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/07/2019122935388Open ↗
02/02/2017123009341Open ↗
11/22/2016122935388Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/07/2019122935388Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLANDMARKS APPROVAL3
06/07/2019122935388Open ↗
05/04/2017123009341Open ↗
02/02/2017123009341Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/18/2019122935388Open ↗
06/07/2019122935388Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/07/2019122935388Open ↗
11/22/2016122935388Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION2
05/10/2017123009341Open ↗
05/04/2017123009341Open ↗
▸BISBOROUGH INTAKE FORM2
06/18/2019122935388Open ↗
06/07/2019122935388Open ↗
▸BISEFILING COVER SHEET2
02/02/2017123009341Open ↗
11/22/2016122935388Open ↗