← Back
Walk-up cooperative
312 EAST 50 STREET
MANHATTAN · BIN 1085114
💬 Discuss this project
1900Year Built
4Stories
C6Building Class
R8BZoning
6,913 sfGross Floor Area
8Units
Rent Stabilized61 Open Violations ▸
Walk-up cooperative · Owner of record: 312-314 EAST 50 ST CORP · 3,716 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 12 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RVP MANAGEMENT2407/08/2026
312-314 EAST 50 ST CORP803/22/2026
DUCE CONSTRUCTION203/22/2026
S & S EQUITIES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JMV CONSULTING ENGINEERING410/12/2023
A DEGREE OF FREEDOM STRUCTURAL ENGI107/23/2021
JOEL IVES105/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUCE CONSTRUCTION CORPGeneral Contractor803/21/2026
METROTECH MECHANICAL CORPPlumbing207/08/2026
PANAGIOTIS KARAKALPAKIDISElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JMV CONSULTING ENGINEERIN804410/12/2023
A DEGREE OF FREEDOM STRUC925207/23/2021
JIMMY LOW L.L.C.6950105/25/2021
Building Lifecycle
All (85)Filed (6)Permit Issued (6)Signed Off (4)Violation (42)Inspection (3)Objection (4)Special Inspection (20)
05/07/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2024
Violation issued (HPD, open)
A
03/27/2024
Signed off — Alteration
MECHANICAL WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522637-I1
03/27/2024
Signed off — Alteration
PLUMBING WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522702-I1
03/19/2024
Signed off — Alteration
MECHANICAL WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522637-S2
11/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2023
Violation issued (HPD, open)
I
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
10/12/2023
Filed — Alteration
PLUMBING WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522702-P2
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
03/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2023
Signed off — Alteration
MECHANICAL WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522637-S1
03/10/2023
Permit issued — Plumbing
M00522702-I1-PL
11/16/2022
Violation issued (ECB, closed)
Construction
11/16/2022
Violation issued (ECB, closed)
Construction
11/02/2022
Violation issued (HPD, closed)
I
10/12/2022
Permit issued — General Construction
M00522637-I1-GC
06/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/25/2022
Filed — Alteration
PLUMBING WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522702-P1
05/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
04/11/2022
Permit issued — Mechanical Systems
M00522637-S2-MS
04/11/2022
Permit issued — Structural
M00522637-S1-ST
03/24/2022
Violation issued (ECB, closed)
Unknown
03/14/2022
Violation issued (ECB, closed)
Unknown
03/08/2022
Violation issued (HPD, closed)
A
01/31/2022
Permit issued — Plumbing
M00522702-I1-PL
12/16/2021
Permit issued — General Construction
M00522637-I1-GC
07/30/2021
Filed — Alteration
MECHANICAL WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522637-S2
07/23/2021
Filed — Alteration
MECHANICAL WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522637-S1
06/16/2021
Objection raised — Other
06/16/2021
Objection resolved — Addressed
06/16/2021
Objection raised — Other
06/16/2021
Objection resolved — Addressed
06/02/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Vuto
06/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Vuto
06/02/2021
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Vuto
06/02/2021
Special inspection requirement — Maintenance information
Joseph Vuto
05/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
05/28/2021
Special inspection requirement — Post-installed Anchors
Dominic Cullen
05/28/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
05/28/2021
Special inspection requirement — Structural Steel - Details
Dominic Cullen
05/28/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Dominic Cullen
05/28/2021
Special inspection requirement — Structural Steel - Welding
Dominic Cullen
05/28/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
05/27/2021
Filed — Alteration
PLUMBING WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522702-I1
05/27/2021
Special inspection requirement — Final
Joseph Vuto
05/27/2021
Special inspection requirement — Mechanical Systems
Joseph Vuto
05/27/2021
Special inspection requirement — Final
Dominic Cullen
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/25/2021
Filed — Alteration
MECHANICAL WORK FOR RENOVATIONS OF APT 3E AS PER PLANS FILED HEREWITH.
M00522637-I1
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP03/10/2023
DOB NOWGeneral ConstructionSigned-offDUCE CONSTRUCTION CORP10/12/2022
DOB NOWMechanical SystemsSigned-offDUCE CONSTRUCTION CORP04/11/2022
DOB NOWStructuralSigned-offDUCE CONSTRUCTION CORP04/11/2022
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP01/31/2022
DOB NOWGeneral ConstructionSigned-offDUCE CONSTRUCTION CORP12/16/2021
BISOTISSUEDDL RESTORATION/BUILDERS CORP.10/10/2007
3 projects · most recent 11/02/2022
General Wiring
FiledStatusContractorScope
11/02/2022CompleteBASS ELECTRICAL CORP.General Wiring
03/30/2022CompleteBASS ELECTRICAL CORP.General Wiring
03/05/2021CompleteDEMAND ELECTRIC INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/17/2023Fire-Resistant Penetrations and JointsJoseph Vutospecial
03/31/2023Fire-Resistant Penetrations and JointsJoseph Vutospecial
05/12/2022Fire-Resistant Penetrations and JointsJoseph Vutospecial
06/02/2021HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
06/02/2021HVAC-R and service water heating equipmentJoseph Vutoenergy_progress
06/02/2021HVAC-R and service water heating system controlsJoseph Vutoenergy_progress
06/02/2021Maintenance informationJoseph Vutoenergy_progress
05/28/2021Fire-Resistant Penetrations and JointsJoseph Vutospecial
05/28/2021Post-installed AnchorsDominic Cullenspecial
05/28/2021Structural Stability – Alterations of existing buildingsDominic Cullenspecial
05/28/2021Structural Steel - DetailsDominic Cullenspecial
05/28/2021Structural Steel - High Strength BoltingDominic Cullenspecial
05/28/2021Structural Steel - WeldingDominic Cullenspecial
05/28/2021Structural Stability – Alterations of existing buildingsDominic Cullenspecial
05/27/2021FinalJoseph Vutoprogress
05/27/2021Mechanical SystemsJoseph Vutospecial
05/27/2021FinalDominic Cullenprogress
05/14/2021Lighting in dwelling unitsJIMMY LOWenergy_progress
05/14/2021FinalJIMMY LOWprogress
05/14/2021Fire-Resistant Penetrations and JointsJIMMY LOWspecial
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00522637-S2Request digital key ↗
09/03/2026M00522637-I1Request digital key ↗
09/02/2026M00522702-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M00522637-S2Open ↗
09/02/2026M00522637-S2Open ↗
09/02/2026M00522637-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/22/2026M00522702-I1Open ↗
09/02/2026M00522637-S2Open ↗
09/02/2026M00522637-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00522702-P1Open ↗
09/02/2026M00522702-P2Open ↗
09/02/2026M00522702-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026M00522702-I1Open ↗
09/02/2026M00522702-P1Open ↗
09/02/2026M00522702-P2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00522637-S2Open ↗
08/13/2026M00522637-I1Open ↗