← Back
Predominantly retail with other uses
303 EAST 53 STREET
MANHATTAN · BIN 1085117
💬 Discuss this project
1910Year Built
4Stories
K4Building Class
C1-9Zoning
5,790 sfGross Floor Area
8Units
Rent Stabilized8 Open Violations 6 unresolved · 2 paperwork only ▸
Predominantly retail with other uses · Owner of record: EDRO REALTY CO, INC · 3,045 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EDRO REALTY504/09/2026
OWNER OF 305 E 53 ST103/22/2026
1370 REALTY303/22/2026
ACB103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CD ARCHITECT STUDIO, LLP109/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON PAUL DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.G GENERAL WELDINGElectrical103/21/2026
MARANGELLI, GAETANOElectrical103/21/2026
MARSON CONTRACTING CO,INCElectrical103/21/2026
TRINCHESE CONSTRUCTION INGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CD ARCHITECT STUDIO, LLP2573109/12/2025
Building Lifecycle
All (26)Filed (1)Permit Issued (1)Signed Off (1)Violation (7)Inspection (3)Objection (4)Special Inspection (9)
04/21/2026
Signed off — Alteration
RESTORE EX. EATING & DRINKING PLACE & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION WORK FOR INTERIOR FINISHES AT BASEMENT FLOOR. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01283585-I1
04/17/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/06/2025
Permit issued — General Construction
M01283585-I1-GC
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/01/2025
Objection raised — Fire_Protection
10/01/2025
Objection raised — Admin
09/12/2025
Filed — Alteration
RESTORE EX. EATING & DRINKING PLACE & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION WORK FOR INTERIOR FINISHES AT BASEMENT FLOOR. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01283585-I1
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Peter D'Angelo
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nat Costanza
09/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Nat Costanza
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
09/10/2025
Special inspection requirement — Fenestration areas
Nat Costanza
09/10/2025
Special inspection requirement — Interior lighting power
Nat Costanza
09/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nat Costanza
09/10/2025
Special inspection requirement — Insulation placement and R values
Nat Costanza
09/10/2025
Special inspection requirement — Fenestration air leakage
Nat Costanza
05/17/2004
Violation issued (ECB, open)
Zoning
05/04/2004
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
05/04/2004
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
10/05/2003
Violation issued (ECB, closed)
Construction
10/25/2002
Violation issued (ECB, closed)
Construction
10/25/2002
Violation issued (ECB, closed)
Construction
10/25/2002
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTRINCHESE CONSTRUCTION IN11/06/2025
BISPLISSUEDCAM ENERGY HTG&AIR COND I09/25/2013
BISMHISSUEDSITELINE DESIGN & CONSTRU09/06/2013
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/17/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/10/2025Tenant Protection Plan CompliancePeter D'Angelospecial
09/10/2025Fire-Resistant Penetrations and JointsNat Costanzaspecial
09/10/2025Energy Code Compliance InspectionsNat Costanzaprogress
09/10/2025Fire-Resistance Rated ConstructionNat Costanzaprogress
09/10/2025Fenestration areasNat Costanzaenergy_progress
09/10/2025Interior lighting powerNat Costanzaenergy_progress
09/10/2025Fenestration and door U-factor and product ratingsNat Costanzaenergy_progress
09/10/2025Insulation placement and R valuesNat Costanzaenergy_progress
09/10/2025Fenestration air leakageNat Costanzaenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026M01283585-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
10/03/2013121740768Open ↗
09/13/2013121740768Open ↗
09/13/2013121740768Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/21/2013121740768Open ↗
08/09/2013121740768Open ↗
▸Seals & Professional Certifications4
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/23/2013121740768Open ↗
08/23/2013121740768Open ↗
08/09/2013121740768Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M01283585-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
04/07/2014121740768Open ↗
03/26/2014121740768Open ↗
▸BISSCHEDULE B - PLUMBING2
10/21/2013121740768Open ↗
08/09/2013121740768Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/09/2013121740768Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01283585-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/23/2013121740768Open ↗
08/09/2013121740768Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/09/2013121740768Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
02/26/2014121740768Open ↗
▸BISEFILING COVER SHEET1
08/09/2013121740768Open ↗