Walk-up apt, over six families with stores
962 1 AVENUE
MANHATTAN · BIN 1085124
💬 Discuss this project
1900Year Built
4Stories
C7Building Class
R10Zoning
21,976 sfGross Floor Area
29Units
Rent Stabilized9 Open Violations 7 unresolved · 2 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 400 EAST 53RD STREET, LLC · 7,452 sf lot · 2.95 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 38p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WILLIAM GOTTLIEB MANAGEMENT1708/28/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC PAINTING CONTRACTING*General Contractor407/08/2026
HT PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666409/18/2024
Building Lifecycle
All (48)Filed (6)Permit Issued (3)Inspection (1)Objection (10)Special Inspection (28)
07/31/2026
Filed — Alteration
STRUCTURAL REINFORCEMENT OF THE EXISTING 2ND FLOOR FRAMING IN THE AREA OF 1ST FLOOR COMMERCIAL TENANT SPACE UTILIZING EXISTING BRICK PIERS AS THE PERMANENT FOUNDATIONS WITH STEEL COLUMNS AND GIRDER BEAMS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY.
M01411486-I1
07/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/08/2026
Special inspection requirement — Structural Steel - Welding
06/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/08/2026
Special inspection requirement — Structural Steel - Details
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/03/2026
Special inspection requirement — Final
03/03/2025
Objection raised — Energy
03/03/2025
Objection raised — Scope
03/03/2025
Objection raised — Other
03/03/2025
Objection raised — Admin
02/14/2025
Filed — Alteration
M01159152-I1
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2024
Permit issued — General Construction
M00946512-I1-GC
09/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
09/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
09/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
09/26/2024
Special inspection requirement — Final
ALEKSANDR LEVIN
09/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
09/26/2024
Special inspection requirement — Lighting in dwelling units
ALEKSANDR LEVIN
09/26/2024
Special inspection requirement — Lighting controls
ALEKSANDR LEVIN
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
09/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
09/18/2024
Filed — Alteration
INTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT LIGHT FIXTS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
M00946512-P1
09/18/2024
Filed — Alteration
INTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT LIGHT FIXTS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
M00946512-P2
06/21/2024
Permit issued — Plumbing
M00946512-S1-PL
06/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Lighting controls
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Lighting in dwelling units
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Final
ALEKSANDR LEVIN
06/20/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
01/18/2024
Permit issued — General Construction
M00946512-I1-GC
12/08/2023
Objection resolved — Addressed
12/08/2023
Objection resolved — Addressed
12/08/2023
Objection resolved — Addressed
11/17/2023
Objection raised — Scope
11/17/2023
Objection raised — Scope
11/13/2023
Filed — Alteration
INTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT LIGHT FIXTS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
M00946512-S1
11/13/2023
Objection raised — Scope
11/03/2023
Filed — Alteration
INTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT LIGHT FIXTS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
M00946512-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNYC PAINTING CONTRACTING*11/21/2024
DOB NOWPlumbingPermit IssuedHT PLUMBING & HEATING COR06/21/2024
DOB NOWGeneral ConstructionPermit IssuedNYC PAINTING CONTRACTING*01/18/2024
1 project · most recent 09/18/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/18/2024Permit IssuedHT PLUMBING & HEATING CORGas, Water/Sanitary
1 project · most recent 07/31/2026
Steel
FiledStatusContractorScope
07/31/2026——Steel
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
07/22/2026Structural Stability – Alterations of existing buildings—special
06/08/2026Structural Steel - Welding—special
06/08/2026Structural Steel - High Strength Bolting—special
06/08/2026Structural Steel - Details—special
06/03/2026Tenant Protection Plan Compliance—special
06/03/2026Final—progress
09/27/2024Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
09/27/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
09/27/2024Energy Code Compliance InspectionsALEKSANDR LEVINprogress
09/27/2024HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
09/26/2024FinalALEKSANDR LEVINprogress
09/26/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
09/26/2024Lighting in dwelling unitsALEKSANDR LEVINenergy_progress
09/26/2024Lighting controlsALEKSANDR LEVINenergy_progress
09/26/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
09/26/2024Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
09/26/2024Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/20/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/20/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/20/2024Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
06/20/2024Energy Code Compliance InspectionsALEKSANDR LEVINprogress
06/20/2024HVAC-R and service water piping design and insulationALEKSANDR LEVINenergy_progress
06/20/2024Lighting controlsALEKSANDR LEVINenergy_progress
06/20/2024Lighting in dwelling unitsALEKSANDR LEVINenergy_progress
06/20/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
Latest 25 of 28.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026M00946512-P4Request digital key ↗
08/28/2026M00946512-P4Request digital key ↗
08/28/2026M00946512-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M00946512-P4Open ↗
09/23/2026M00946512-P4Open ↗
08/28/2026M00946512-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026M00946512-P4Open ↗
08/28/2026M00946512-I1Open ↗
08/28/2026M00946512-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026M00946512-P3Open ↗
08/28/2026M00946512-P1Open ↗
08/28/2026M00946512-S1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026M00946512-P3Open ↗
08/28/2026M00946512-P1Open ↗
08/28/2026M00946512-S1Open ↗
Showing 3 of 8 on file for this type