← Back
Elevator apt, miscellaneous
2905 FREDRICK DOUGLASS BL
MANHATTAN · BIN 1085377
💬 Discuss this project
1993Year Built
7Stories
D9Building Class
R8Zoning
55,433 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized42 Open Violations 40 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator apt, miscellaneous · Owner of record: BETHANY HOUSING DEVELOPMENT FUND CORP · 19,990 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
3 jobs · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedTIMOTHY COLEMAN LICENSEDGeneral Wiring
02/05/2026Permit IssuedTIMOTHY COLEMAN LICENSEDGeneral Wiring
04/25/2022Permit IssuedTRIPLE T ELECTRIC INCGeneral Wiring
Building Lifecycle
All (72)Filed (1)Permit Issued (1)Signed Off (1)Facade (FISP) (3)Violation (60)Special Inspection (6)
08/20/2026
Violation issued (HPD, open)
C
04/03/2026
Violation issued (HPD, closed)
B
09/05/2024
Cycle 9 facade report signed — SWARMP
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/09/2024
Cycle 9 facade report submitted
03/24/2024
Cycle 9 facade inspection completed
01/23/2024
Violation issued (HPD, closed)
C
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2022
Signed off — Alteration
DRAWINGS ARE FILED TO RESTORE EXISTING FIRE DAMAGED APARTMENT 6G ON THE SIXTH FLOOR. MINOR PARTITION WORK, NEW FLOORING, PLASTER & PAINTING EXISTING WALLS, & INSTALLATION OF NEW FINISHES AS PER PLAN. NO CHANGE TO EGRESS, OCCUPANCY, OR USE GROUP.
M00782615-I1
10/13/2022
Permit issued — General Construction
M00782615-I1-GC
08/23/2022
Violation issued (HPD, closed)
C
08/23/2022
Violation issued (HPD, closed)
C
08/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/11/2022
Filed — Alteration
DRAWINGS ARE FILED TO RESTORE EXISTING FIRE DAMAGED APARTMENT 6G ON THE SIXTH FLOOR. MINOR PARTITION WORK, NEW FLOORING, PLASTER & PAINTING EXISTING WALLS, & INSTALLATION OF NEW FINISHES AS PER PLAN. NO CHANGE TO EGRESS, OCCUPANCY, OR USE GROUP.
M00782615-I1
07/27/2022
Special inspection requirement — Final
ELLIOTT HARDIE
07/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
ELLIOTT HARDIE
07/27/2022
Special inspection requirement — Energy Code Compliance Inspections
ELLIOTT HARDIE
07/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
ELLIOTT HARDIE
07/27/2022
Special inspection requirement — Insulation placement and R values
ELLIOTT HARDIE
07/27/2022
Special inspection requirement — Lighting in dwelling units
ELLIOTT HARDIE
03/09/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
C
02/17/2022
Violation issued (HPD, closed)
B
02/17/2022
Violation issued (HPD, closed)
B
02/17/2022
Violation issued (HPD, closed)
B
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
C
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
C
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
C
02/17/2022
Violation issued (HPD, closed)
C
02/17/2022
Violation issued (HPD, closed)
B
02/17/2022
Violation issued (HPD, closed)
B
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
C
02/16/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/02/2021
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
03/31/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2020
Violation issued (ECB, open)
Elevators
10/14/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/13/2020
Violation issued (ECB, open)
Elevators
06/29/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2019
Violation issued (HPD, open)
A
10/16/2019
Violation issued (HPD, closed)
C
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/27/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/10/2018
Violation issued (HPD, closed)
I
03/27/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 72 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEVELOPMENT OUTREACH503/22/2026
BETHANY HOUSING DEVELOPMENT FUND CORP503/22/2026
BETHANY HOUSING DEVLETC303/22/2026
GOTHAMS CONSTRUCTION303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK S CAMINITI, RA108/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICE RICE CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL PURPOSE SERVICES INCGeneral Contractor303/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offALL PURPOSE SERVICES INC10/13/2022
BISCCISSUEDGOTHAM CONSRCUTION CORP03/21/1994
BISSPISSUEDMEDCO PLUMBING INC03/18/1994
BIS—ISSUEDGOTHAM CONST.CORP.12/02/1993
BISSDISSUEDMEDCO PLUMBING INC.10/15/1993
BISEQISSUEDUNITED HOISTING CO. INC.07/07/1993
BIS—ISSUEDGOTHAM CONST.CORP.12/03/1992
BISEQISSUEDGOTHAM CONST.CORP.12/03/1992
BISEQISSUEDVAN SAN CONST.CORP.05/26/1992
BIS—ISSUEDVAN SAN CONST.CORP.05/26/1992
BISEQISSUEDGATEWAY DEMOLITION CORP08/12/1991
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/27/2022FinalELLIOTT HARDIEprogress
07/27/2022Fire-Resistance Rated ConstructionELLIOTT HARDIEprogress
07/27/2022Energy Code Compliance InspectionsELLIOTT HARDIEprogress
07/27/2022Fenestration and door U-factor and product ratingsELLIOTT HARDIEenergy_progress
07/27/2022Insulation placement and R valuesELLIOTT HARDIEenergy_progress
07/27/2022Lighting in dwelling unitsELLIOTT HARDIEenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/02/2026M00782615-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature6
09/30/2026M00782615-I1Open ↗
09/30/2026M00782615-I1Open ↗
09/30/2026M00782615-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M00782615-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00782615-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/28/2018100649309Open ↗
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
12/28/2018100649309Open ↗