← Back
Condo, residential unit in elevator building
519 WEST 135 STREET
MANHATTAN · BIN 1086152
💬 Discuss this project
2002Year Built
7Stories
R4Building Class
R7AZoning
19,776 sfGross Floor Area
13Units
Rent Stabilized2 Open Violations ▸FISP: SWARMP
Condo, residential unit in elevator building · 3,997 sf lot · 4.95 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RE-BRICK CONSTRUCTION503/22/2026
TO THE OWNER OF103/22/2026
MIKEESON CONST. CORP103/22/2026
MIKE SAM CONSTRUCTION COR303/22/2026
NEW YORK CITY DEPT OF R.E103/22/2026
CITY OF NY103/22/2026
GLEAM REALTY1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ ENGINEERING, P.C308/02/2023
C2B ARCHITECTS PC105/30/2023
ENTHINK ENGINEERS LLC111/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor507/08/2026
RE-BRICK CONSTRUCTION INCGeneral Contractor303/21/2026
PHARAOHS RESTORATIONGeneral Contractor207/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL STATE PROPERTY INSPEC4288105/30/2023
Building Lifecycle
All (67)Filed (5)Permit Issued (6)Signed Off (3)Facade (FISP) (12)Violation (41)
08/15/2024
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00876816-I1
07/12/2024
Cycle 9 facade report signed — SWARMP
05/24/2024
Permit issued — Sidewalk Shed
M00876816-I1-SH
05/09/2024
Cycle 9 facade report submitted
04/23/2024
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00877212-I1
04/16/2024
Violation issued (ECB, closed)
Local Law
04/02/2024
Signed off — Alteration
APPLICATION FILED FOR FACADE AND CURTAIN WALL REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00873158-I1
03/30/2024
Cycle 9 facade inspection completed
10/17/2023
Permit issued — General Construction
M00873158-I1-GC
08/02/2023
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00876816-P1
07/31/2023
Violation issued (ECB, closed)
Construction
07/31/2023
Violation issued (ECB, closed)
Construction
06/29/2023
Permit issued — General Construction
M00873158-I1-GC
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2023
Filed — Alteration
APPLICATION FILED FOR FACADE AND CURTAIN WALL REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00873158-I1
05/30/2023
Permit issued — Sidewalk Shed
M00876816-I1-SH
05/26/2023
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00876816-I1
05/26/2023
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00877212-I1
05/26/2023
Permit issued — Supported Scaffold
M00877212-I1-SF
03/30/2023
Violation issued (HPD, closed)
A
11/03/2022
Permit issued — Sidewalk Shed
M08023901-I1-SH
11/02/2022
Violation issued (HPD, closed)
I
11/01/2022
Filed — Alteration
M08023901-I1
07/11/2022
Cycle 9 facade report submitted
07/11/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2022
Cycle 9 facade report signed — UNSAFE
05/26/2022
Cycle 9 facade inspection completed
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
C
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
A
12/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2018
Violation issued (HPD, closed)
I
07/20/2017
Cycle 8 facade report submitted
07/20/2017
Cycle 8 facade report signed — SAFE
06/26/2017
Cycle 8 facade inspection completed
11/25/2016
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (HPD, closed)
I
11/20/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/17/2013
Violation issued (ECB, closed)
Construction
08/07/2012
Cycle 7 facade report submitted
07/31/2012
Cycle 7 facade report signed — SAFE
07/23/2012
Cycle 7 facade inspection completed
01/25/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/11/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/09/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2001
Violation issued (ECB, closed)
Site Safety
10/24/2001
Violation issued (ECB, closed)
Construction
08/08/2001
Violation issued (ECB, closed)
Site Safety
08/08/2001
Violation issued (ECB, closed)
Site Safety
08/08/2001
Violation issued (ECB, closed)
Site Safety
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC05/24/2024
DOB NOWGeneral ConstructionSigned-offPHARAOHS RESTORATION10/17/2023
DOB NOWGeneral ConstructionSigned-offPHARAOHS RESTORATION06/29/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC05/30/2023
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC05/26/2023
DOB NOWSidewalk ShedPermit IssuedRE-BRICK CONSTRUCTION INC11/03/2022
BIS—ISSUEDMIKEESAM CONSTRUCTION CORP.09/19/2002
BISEQISSUEDMIKESAM CONSTRUCTION CORP.01/08/2002
BISEQISSUEDMIKESAM CONSTRUCTION CORP.09/18/2001
BISSDISSUEDCHIEF FIRE CONTR. CO. INC09/06/2001
BIS—ISSUEDMIKEESAM CONSTRUCTION CORP.04/19/2001
BISEQISSUEDMIKESAM CONSTRUCTION CORP.04/19/2001
2 projects · most recent 05/31/2023
FiledStatusContractorScope
05/31/2023CompleteBOROWIDE ELECT'L CONTR'S—
11/29/2022Permit IssuedRICHARD NEU—
Nothing on file for this building.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026M08023901-I1Request digital key ↗
08/31/2026M00877212-I1Request digital key ↗
08/31/2026M00876816-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026M08023901-I1Open ↗
08/31/2026M00877212-I1Open ↗
08/31/2026M00876816-P1Open ↗
Showing 3 of 5 on file for this type