| Owner | Filings | Most Recent |
|---|---|---|
| HUDSON RIVER PARK TRUST | 1 | 09/13/2026 |
| NYS DEPARTMENT OF TRANSPORTATION | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LERA CONSULTING STRUCTURAL ENGINEER | 2 | 03/30/2026 |
| SHENOY ENGINEERING, PC | 3 | 03/27/2026 |
| SAGE AND COOMBE ARCHITECTS | 1 | 03/27/2026 |
| PHILIP HABIB & ASSOCIATES | 1 | 03/27/2026 |
| TJP INC | 1 | 03/27/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/30/2026 | — | — | Air Conditioning Systems | Cooling Lg ZRNU483M3AA 48,100 BTU · Vrf Indoor ×2 ARDE-112-36D-10A-1-A2 2,500 CFM · Erv ×1 KCHH060HDGC 652,000 BTU · Chiller ×1 KNUAB121A 13,600 BTU · Vrf Outdoor ×1 KUSAB121A 13,600 BTU · Vrf Outdoor ×1 ZRNU123MAAA 12,300 BTU · Vrf Indoor ×1 ZRNU363M2AA 36,200 BTU · Vrf Outdoor ×1 ZRUM168BTE6 157,000 BTU · Vrf Outdoor ×1 Seresco NE-002-NP-I-A0NT5801N0C3BN3H/ NC-B-1V 800 CFM · Split System ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/30/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/30/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/30/2026 | — | — | Steel, Concrete |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/27/2026 | Designated Seismic System | — | special |
| 03/27/2026 | Designated Seismic System | — | special |
| 03/26/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/26/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/26/2026 | Shutoff dampers | — | energy_progress |
| 03/26/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/26/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/26/2026 | Structural Cold-Formed Steel | — | special |
| 03/26/2026 | Electrical motors and elevators | — | energy_progress |
| 03/26/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | — | special |
| 03/26/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/26/2026 | Energy Code Compliance Inspections | — | progress |
| 03/26/2026 | Energy Code Compliance Inspections | — | progress |
| 03/26/2026 | Shutoff dampers | — | energy_progress |
| 03/26/2026 | Fenestration air leakage | — | energy_progress |
| 03/26/2026 | Interior lighting power | — | energy_progress |
| 03/26/2026 | Fenestration areas | — | energy_progress |
| 03/26/2026 | Exterior lighting power | — | energy_progress |
| 03/26/2026 | Insulation placement and R values | — | energy_progress |
| 03/26/2026 | Air barrier - visual inspection | — | energy_progress |
| 03/26/2026 | Lighting controls | — | energy_progress |
| 03/26/2026 | Protection of exposed foundation insulation | — | energy_progress |
| 03/26/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 03/26/2026 | Vestibules | — | energy_progress |
| 03/26/2026 | Fire-Resistance Rated Construction | — | progress |