← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Greenwich Lane Condominium
133 WEST 11 STREET · BIN 1090624
💬 Discuss this project
2013Year Built
17Stories
RMBuilding Class
R8Zoning
533,883 sfGross Floor Area
204Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE GREENWICH LANE CONDOMINIUM · 92,925 sf lot · 5.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 5Under Construction7p · 4 filings · 20 docs
Floor 41p · 1 filing · 17 docs
Floor 3Under Construction7p · 4 filings · 20 docs
Floor 21p · 1 filing · 17 docs
Floor 1
CellarUnder Construction7p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZUKERMAN GORE1508/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RMBA LLC207/17/2026
EP ENGINEERING LLC404/30/2026
RIGID STRUCTURAL DESIGN, LLC107/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
RMBA LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLOWCON INCGeneral Contractor307/08/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
MASTER PLBG AND HTG INCFire Protection106/28/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RMBA, LLC3937507/17/2026
EP INSPECTIONS AND COMMIS7079404/30/2026
Building Lifecycle
All (74)Filed (7)Permit Issued (7)Signed Off (1)Inspection (6)Objection (25)Special Inspection (28)
08/06/2026
Objection raised — Scope
08/06/2026
Objection raised — Scope
07/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2026
Filed — Alteration
General construction work associated with the renovation of an existing town home. There is no change proposed to existing use, egress, or occupancy.
M01106032-P1
07/13/2026
Special inspection requirement — Interior lighting power
RALPH BEIRAN
07/13/2026
Special inspection requirement — Final
RALPH BEIRAN
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RALPH BEIRAN
07/13/2026
Special inspection requirement — Lighting in dwelling units
RALPH BEIRAN
07/13/2026
Special inspection requirement — Lighting controls
RALPH BEIRAN
07/01/2026
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
06/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/19/2026
Objection raised — Scope
04/30/2026
Filed — Alteration
Plumbing work associated with the renovation of an existing town home. There is no change proposed to existing use, egress, or occupancy.
M01106104-P1
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RALPH BEIRAN
04/06/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
04/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2026
Permit issued — Plumbing
M01106104-I1-PL
12/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/12/2025
Permit issued — General Construction
M01106032-I1-GC
10/10/2025
Signed off — Alteration
Installation of a temporarily system scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01248421-I1
07/02/2025
Filed — Alteration
Installation of a temporarily system scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01248421-I1
07/02/2025
Permit issued — Supported Scaffold
M01248421-I1-SF
06/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2025
Permit issued — Sprinklers
M01106378-I1-EW-SP
02/21/2025
Permit issued — Mechanical Systems
M01106092-I1-MS
01/30/2025
Permit issued — Plumbing
M01106104-I1-PL
12/20/2024
Objection resolved — Addressed
12/11/2024
Permit issued — General Construction
M01106032-I1-GC
12/05/2024
Objection resolved — Addressed
12/02/2024
Objection resolved — Addressed
11/27/2024
Objection resolved — Addressed
11/27/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/21/2024
Objection resolved — Addressed
11/21/2024
Objection resolved — Addressed
11/15/2024
Objection raised — Scope
11/15/2024
Objection raised — Structural
11/14/2024
Objection raised — Scope
11/14/2024
Objection raised — Structural
11/14/2024
Objection raised — Scope
11/14/2024
Objection raised — Scope
11/14/2024
Objection raised — Structural
11/12/2024
Objection resolved — Addressed
11/12/2024
Objection resolved — Addressed
11/12/2024
Objection resolved — Addressed
11/06/2024
Objection raised — Structural
11/06/2024
Objection raised — Scope
11/06/2024
Objection raised — Other
11/04/2024
Objection raised — Structural
10/30/2024
Filed — Alteration
Mechanical work associated with the renovation of an existing town home. There is no change proposed to existing use, egress, or occupancy.
M01106092-I1
10/29/2024
Filed — Alteration
Sprinkler work associated with the renovation of an existing town home. There is no change proposed to existing use, egress, or occupancy.
M01106378-I1
10/29/2024
Filed — Alteration
Plumbing work associated with the renovation of an existing town home. There is no change proposed to existing use, egress, or occupancy.
M01106104-I1
10/18/2024
Filed — Alteration
General construction work associated with the renovation of an existing town home. There is no change proposed to existing use, egress, or occupancy.
M01106032-I1
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RALPH BEIRAN
09/05/2024
Special inspection requirement — Interior lighting power
RALPH BEIRAN
09/05/2024
Special inspection requirement — Lighting in dwelling units
RALPH BEIRAN
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RALPH BEIRAN
09/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
09/05/2024
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedARCON PLBG SOLUTIONS02/03/2026
DOB NOWGeneral ConstructionPermit IssuedFLOWCON INC11/12/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC07/02/2025
DOB NOWSprinklersPermit IssuedMASTER PLBG AND HTG INC05/13/2025
DOB NOWMechanical SystemsPermit IssuedFLOWCON INC02/21/2025
DOB NOWPlumbingPermit IssuedARCON PLBG SOLUTIONS01/30/2025
DOB NOWGeneral ConstructionPermit IssuedFLOWCON INC12/11/2024
1 project · most recent 10/30/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/30/2024Permit IssuedFLOWCON INCHeating and Air Conditioning Systems
Heat / Cool
Johnson Controls FHP-D06 Fan Coil Indoor ×1
1 project · most recent 10/29/2024
FiledStatusContractorScope
10/29/2024Permit IssuedMASTER PLBG AND HTG INC—
1 project · most recent 04/30/2026
Water/Sanitary
FiledStatusContractorScope
04/30/2026Permit IssuedARCON PLBG SOLUTIONSWater/Sanitary
2 projects · most recent 02/05/2025
General Wiring
FiledStatusContractorScope
02/05/2025Permit IssuedAPOLLO ELECTRIC INC.General Wiring
07/17/2018CompleteDIFAZIO ELECTRIC NY, INC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2026Pass-Final SP - More than 10 Requested FloorsPassView ↗
06/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
07/13/2026Interior lighting powerRALPH BEIRANenergy_progress
07/13/2026FinalRALPH BEIRANprogress
07/13/2026Fire-Resistant Penetrations and JointsRALPH BEIRANspecial
07/13/2026Lighting in dwelling unitsRALPH BEIRANenergy_progress
07/13/2026Lighting controlsRALPH BEIRANenergy_progress
04/06/2026Fire-Resistant Penetrations and JointsRALPH BEIRANspecial
04/06/2026Post-installed AnchorsMOLLY GLENNspecial
04/06/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
09/05/2024Fire-Resistant Penetrations and JointsRALPH BEIRANspecial
09/05/2024Interior lighting powerRALPH BEIRANenergy_progress
09/05/2024Lighting in dwelling unitsRALPH BEIRANenergy_progress
09/05/2024Fire-Resistant Penetrations and JointsRALPH BEIRANspecial
09/05/2024HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
09/05/2024Post-installed AnchorsMOLLY GLENNspecial
09/05/2024Lighting controlsRALPH BEIRANenergy_progress
09/05/2024Exhaust and Vent Systems in Plenums and DuctsMOLLY GLENNspecial
09/05/2024Fire-Resistant Penetrations and JointsRALPH BEIRANspecial
09/05/2024Post-installed AnchorsMOLLY GLENNspecial
09/05/2024Energy Code Compliance InspectionsMOLLY GLENNprogress
09/05/2024Maintenance informationMOLLY GLENNenergy_progress
09/05/2024HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
09/05/2024HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
09/05/2024HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
09/05/2024Post-installed AnchorsMOLLY GLENNspecial
09/04/2024Mechanical SystemsMOLLY GLENNspecial
Latest 25 of 28.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026M01106104-P1Request digital key ↗
08/25/2026M01106092-I1Request digital key ↗
08/23/2026M01248421-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/15/2026M01106032-P1Open ↗
08/14/2026M01106104-P1Open ↗
08/13/2026M01106092-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M01106032-P1Open ↗
09/01/2026M01106032-P1Open ↗
09/01/2026M01106032-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M01106032-P1Open ↗
08/27/2026M01106104-I1Open ↗
08/27/2026M01106104-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026M01106032-P1Open ↗
08/25/2026M01106092-I1Open ↗
08/17/2026M01106104-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos3
▸DOB NOWOER: Notice to Proceed3
08/13/2026M01106032-I1Open ↗
08/13/2026M01106104-I1Open ↗
08/13/2026M01106092-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M01248421-I1Open ↗