← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Astor Terrace Condominium
245 EAST 93 STREET · BIN 1090755
💬 Discuss this project
1985Year Built
32Stories
RMBuilding Class
R8Zoning
389,838 sfGross Floor Area
299Units
LL97 CoveredRent Stabilized4 Open Violations 1 unresolved · 3 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: ASTOR TERRACE CONDOMINIUM · 42,974 sf lot · 9.07 FAR built · Flood zone X
Locations of Work
Architecture
Roof4p · 1 filing · 8 docs
Floor 34p · 1 filing · 8 docs
Floor 24p · 1 filing · 8 docs
Floor 14p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASTOR TERRACE CONDOMINIUM407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SETH P. ROYE ARCHITECT PC206/28/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VEMA GROUP LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SETH P ROYE ARCHITECT PC8554206/28/2024
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Inspection (3)Special Inspection (4)
04/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/10/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/03/2024
Permit issued — General Construction
M01041121-I1-GC
07/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Seth Roye
07/02/2024
Special inspection requirement — Masonry
Seth Roye
06/28/2024
Filed — Alteration
Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.
M01041121-P1
06/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Seth Roye
06/25/2024
Special inspection requirement — Masonry
Seth Roye
06/12/2024
Filed — Alteration
Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.
M01041121-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedVEMA GROUP LLC07/03/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/10/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/02/2024Fire-Resistant Penetrations and JointsSeth Royespecial
07/02/2024MasonrySeth Royespecial
06/25/2024Fire-Resistant Penetrations and JointsSeth Royespecial
06/25/2024MasonrySeth Royespecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026M01041121-I1Request digital key ↗
08/27/2026M01041121-P1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026M01041121-P1Open ↗
08/27/2026M01041121-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026M01041121-I1Open ↗
08/27/2026M01041121-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026M01041121-I1Open ↗
08/27/2026M01041121-P1Open ↗