← Back
Elevator cooperative
40 EAST 80 STREET
MANHATTAN · BIN 1091750
💬 Discuss this project
1967Year Built
26Stories
D4Building Class
C5-1Zoning
111,231 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized60 Open Violations 56 unresolved · 4 paperwork only ▸
Elevator cooperative · Owner of record: 40 EAST 80 APT CORP · 9,720 sf lot · 11.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 3 docs
Floor 5Under Construction9p · 3 filings · 20 docs
Floor 4Under Construction6p · 2 filings · 20 docs
Floor 3Under Construction6p · 2 filings · 20 docs
Floor 2Under Construction6p · 2 filings · 20 docs
Floor 1Under Construction5p · 2 filings · 20 docs
CellarUnder Construction8p · 3 filings · 20 docs
2 jobs · most recent 05/13/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/13/2026——Air Conditioning Systems
Cooling
Islandaire EZ26 Series 16,000 BTU · Ptac ×4
EZ26 series 11,000 BTU · Ptac ×1
Aaon ×4
Mitsubishi Electric PUHY-EP120TNU 135,000 BTU · Vrf Outdoor ×3
12/27/2024Permit IssuedDNP BUILDERS LLCAir Conditioning Systems, Ventilation Systems
Cooling
Amana PTC 173G***XXX 16,200 BTU · Ptac ×8
PTC 123G***XXX 11,500 BTU · Ptac ×2
Aaon C F A 0 3 1D A 8 G A 0 0 K-0 0 K 0 D 0 E 0 A 0 A R 0L D E-D E 0 0 0 A 0 G 0 0 0 0 0 0 0 D B 390,000 BTU · Condensing Unit ×4
S A-030-8-A-B402-CHH: 0000-000-EBG-ACC-0DA0HBD-00-0AE000AVB 384,000 BTU · Rooftop Unit ×4
Trane TSJ1203S0N**R5D1A2B0A1C7000 122,000 BTU · Chiller ×4
Islandaire EZ2612B2C1S41AA 12,200 BTU · Ptac ×2
Mitsubishi Electric PUHY-P120TKMU-A 120,000 BTU · Vrf Outdoor ×2
Ventilation
Pennbarry D08 650 CFM · Exhaust Fan ×4
FX-18BH 3,200 CFM · Exhaust Fan ×2
Kanalflakt KD 12XL 1,786 CFM · Makeup Air ×2
1 job · most recent 05/13/2026
Water/Sanitary
FiledStatusContractorScope
05/13/2026——Water/Sanitary
4 jobs · most recent 10/15/2025
FiledStatusContractorScope
10/15/2025Permit IssuedNASH ELECTRIC SERVICES IN—
05/22/2024CompleteDAVEN ELECTRIC CORP—
05/22/2024Permit IssuedDAVEN ELECTRIC CORP—
08/15/2023Permit IssuedNASH ELECTRIC SERVICES IN—
2 jobs · most recent 05/13/2026
Masonry Steel
FiledStatusContractorScope
05/13/2026——Masonry
12/27/2024Permit IssuedDNP BUILDERS LLCSteel
1 job · most recent 08/21/2023
Sidewalk Shed
FiledStatusContractorScope
08/21/2023Permit IssuedSTARR INDUSTRIES LLCSidewalk Shed
Building Lifecycle
All (66)Filed (9)Permit Issued (13)Signed Off (2)Inspection (3)Objection (9)Special Inspection (30)
09/10/2026
Permit issued — Sidewalk Shed
M00922419-I1-SH
07/22/2026
Objection raised — Scope
06/12/2026
Permit issued — Sidewalk Shed
M00922419-I1-SH
06/05/2026
Permit issued — Structural
M08048831-I1-GC-CX
05/13/2026
Filed — Alteration
Mechanical changes as per plans.
M01379781-S2
05/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
Tommaso Di Gesaro
04/08/2026
Special inspection requirement — Structural Cold-Formed Steel
Tommaso Di Gesaro
04/08/2026
Special inspection requirement — Masonry
Tommaso Di Gesaro
04/08/2026
Special inspection requirement — Structural Steel - Details
Tommaso Di Gesaro
04/08/2026
Special inspection requirement — Post-installed Anchors
Tommaso Di Gesaro
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
Tommaso Di Gesaro
04/08/2026
Special inspection requirement — Structural Steel - Welding
Tommaso Di Gesaro
03/31/2026
Permit issued — Sidewalk Shed
M00922419-I1-SH
03/30/2026
Special inspection requirement — Final
Tommaso Di Gesaro
03/28/2026
Filed — Alteration
Mechanical changes as per plans.
M01379781-I1
03/28/2026
Filed — Alteration
M01376628-I1
03/28/2026
Filed — Alteration
Mechanical changes as per plans.
M01379781-S1
03/28/2026
Special inspection requirement — Final
Tommaso Di Gesaro
03/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
Tommaso Di Gesaro
03/28/2026
Special inspection requirement — Mechanical Systems
Tommaso Di Gesaro
11/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01221912-I1
11/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2025
Permit issued — Sidewalk Shed
M00922419-I1-SH
10/20/2025
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00922438-I1
09/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/23/2025
Permit issued — Supported Scaffold
M01221912-I1-SF
05/22/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01221912-I1
05/14/2025
Permit issued — General Construction
M08048831-I1-GC-CX
01/03/2025
Objection resolved — Addressed
01/03/2025
Special inspection requirement — Ventilation and air distribution system
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Insulation placement and R values
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Fenestration air leakage
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Fenestration areas
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Air barrier - visual inspection
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Shutoff dampers
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Duct leakage testing, insulation and design
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Lighting controls
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Electrical motors and elevators
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Structural Steel - Welding
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Structural Steel - Details
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Mechanical Systems
Tommaso Di Gesaro
01/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Tommaso Di Gesaro
01/02/2025
Objection raised — Cost
12/27/2024
Filed — Alteration
REMOVAL OF EXISTING AIR CONDITIONING AND VENTILATION SYSTEMS AND REPLACEMENT WITH NEW AIR CONDITIONING & VENTILATION SYSTEMS IN THE SAME LOCATIONS WITH MINIMAL ASSOCIATED CONSTRUCTION WORK.
M08048831-P1
11/12/2024
Permit issued — Supported Scaffold
M00922438-I1-SF
11/12/2024
Permit issued — Sidewalk Shed
M00922419-I1-SH
09/27/2023
Permit issued — Sidewalk Shed
M00922419-I1-SH
09/27/2023
Permit issued — Supported Scaffold
M00922438-I1-SF
08/24/2023
Permit issued — Sidewalk Shed
M00922419-I1-SH
08/21/2023
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00922438-I1
08/21/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00922419-I1
08/21/2023
Permit issued — Supported Scaffold
M00922438-I1-SF
03/16/2023
Objection raised — Inspections
Latest 60 of 66 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANHATTAN CHURCH OF CHRIST609/13/2026
PLATINUM SERVICES NY404/09/2026
STARR INDUSTRIES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVEDI105/13/2026
MCEES Engineering203/28/2026
CTHREE ARCHITECTURE + DESIGN, PC103/28/2026
ASHRAF CORP105/22/2025
CHARLES DIEHL ARCHITECT LLC212/27/2024
TOHFAZ UDDIN PE PC208/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STARR INDUSTRIES LLCGeneral Contractor809/12/2026
YORK SCAFFOLD EQUIPMENT CORP.General Contractor407/08/2026
DNP BUILDERS LLCGeneral Contractor207/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
PLATINUM SERVICES NY LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MTD GROUP INSPECTIONS,INC9388505/13/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC09/10/2026
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC06/12/2026
DOB NOWStructuralPermit IssuedDNP BUILDERS LLC06/05/2026
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC03/31/2026
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC11/07/2025
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/23/2025
DOB NOWGeneral ConstructionPermit IssuedDNP BUILDERS LLC05/14/2025
DOB NOWSupported ScaffoldSigned-offSTARR INDUSTRIES LLC11/12/2024
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC11/12/2024
DOB NOWSidewalk ShedPermit IssuedYORK SCAFFOLD EQUIPMENT CORP.09/27/2023
DOB NOWSupported ScaffoldSigned-offYORK SCAFFOLD EQUIPMENT CORP.09/27/2023
DOB NOWSidewalk ShedPermit IssuedYORK SCAFFOLD EQUIPMENT CORP.08/24/2023
DOB NOWSupported ScaffoldSigned-offYORK SCAFFOLD EQUIPMENT CORP.08/21/2023
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
05/11/2026Tenant Protection Plan ComplianceTommaso Di Gesarospecial
04/08/2026Structural Cold-Formed SteelTommaso Di Gesarospecial
04/08/2026MasonryTommaso Di Gesarospecial
04/08/2026Structural Steel - DetailsTommaso Di Gesarospecial
04/08/2026Post-installed AnchorsTommaso Di Gesarospecial
04/08/2026Concrete - Cast-In-PlaceTommaso Di Gesarospecial
04/08/2026Structural Steel - WeldingTommaso Di Gesarospecial
03/30/2026FinalTommaso Di Gesaroprogress
03/28/2026FinalTommaso Di Gesaroprogress
03/28/2026Tenant Protection Plan ComplianceTommaso Di Gesarospecial
03/28/2026Mechanical SystemsTommaso Di Gesarospecial
01/03/2025Ventilation and air distribution systemTommaso Di Gesaroenergy_progress
01/03/2025Fenestration and door U-factor and product ratingsTommaso Di Gesaroenergy_progress
01/03/2025Insulation placement and R valuesTommaso Di Gesaroenergy_progress
01/03/2025Fire-Resistant Penetrations and JointsTommaso Di Gesarospecial
01/03/2025Fenestration air leakageTommaso Di Gesaroenergy_progress
01/03/2025HVAC-R and service water heating system controlsTommaso Di Gesaroenergy_progress
01/03/2025Fenestration areasTommaso Di Gesaroenergy_progress
01/03/2025Air barrier - visual inspectionTommaso Di Gesaroenergy_progress
01/03/2025Shutoff dampersTommaso Di Gesaroenergy_progress
01/03/2025Duct leakage testing, insulation and designTommaso Di Gesaroenergy_progress
01/03/2025Lighting controlsTommaso Di Gesaroenergy_progress
01/03/2025HVAC-R and service water heating equipmentTommaso Di Gesaroenergy_progress
01/03/2025Electrical motors and elevatorsTommaso Di Gesaroenergy_progress
01/03/2025Structural Steel - WeldingTommaso Di Gesarospecial
Latest 25 of 57.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026M00922438-I1Request digital key ↗
08/29/2026M00922419-I1Request digital key ↗
08/25/2026M08048831-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature17
08/26/2026M08048831-I1Open ↗
08/26/2026M08048831-I1Open ↗
08/26/2026M08048831-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/06/2026M01379781-I1Open ↗
09/06/2026M01379781-I1Open ↗
08/26/2026M01379781-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026M00922438-I1Open ↗
08/25/2026M08048831-I1Open ↗
08/23/2026M01221912-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/18/2026M01376628-I1Open ↗
08/17/2026M01379781-S2Open ↗
08/17/2026M01379781-S1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/25/2026M08048831-I1Open ↗
08/13/2026M08048831-P1Open ↗