← Back
Walk-up apt, over six families with stores
383 EAST 138 STREET
BRONX · BIN 2000597
💬 Discuss this project
1931Year Built
5Stories
C7Building Class
R6Zoning
9,155 sfGross Floor Area
10Units
Rent Stabilized22 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 383 EAST REALTY, INC. · 2,617 sf lot · 3.5 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction1 filing · 9 docs
CellarUnder Construction1 filing · 9 docs
1 job · most recent 09/01/2026
Others
FiledStatusContractorScopeMake / Model / Capacity
09/01/2026——Others
Other
Canarm FX18BFT 15 CFM ×1
1 job · most recent 09/01/2026
Water/Sanitary
FiledStatusContractorScope
09/01/2026Permit IssuedHORBRIDGE PLUMBING & HEATWater/Sanitary
1 job · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026Permit IssuedC.Q. ELECTR'L CONTRG CORPGeneral Wiring
Building Lifecycle
All (53)Filed (2)Permit Issued (1)Violation (45)Special Inspection (5)
09/18/2026
Permit issued — Plumbing
X01453877-S1-PL
09/01/2026
Filed — Alteration
APPLICATION FILED TO INSTALL PLUMBING FIXTURES FOR THE FIRST FLOOR KITCHEN,CEL ACCESSORY TO BODEGA WORK INCLUDES INSTALLATION OF 3 COMPARTMENT SINK,SMALL HAND SINK,GREASE TRAP AND FLOOR DRAIN. MECHANICAL HOOD AT KITCHEN ARE EXHAUST DUCT TO ROOF. NO CHAN
X01453877-I1
09/01/2026
Filed — Alteration
APPLICATION FILED TO INSTALL PLUMBING FIXTURES FOR THE FIRST FLOOR KITCHEN,CEL ACCESSORY TO BODEGA WORK INCLUDES INSTALLATION OF 3 COMPARTMENT SINK,SMALL HAND SINK,GREASE TRAP AND FLOOR DRAIN. MECHANICAL HOOD AT KITCHEN ARE EXHAUST DUCT TO ROOF. NO CHAN
X01453877-S1
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL MASTROGIACOMO
08/31/2026
Special inspection requirement — Post-installed Anchors
MICHAEL MASTROGIACOMO
08/31/2026
Special inspection requirement — Mechanical Systems
MICHAEL MASTROGIACOMO
08/31/2026
Special inspection requirement — Final
MICHAEL MASTROGIACOMO
08/31/2026
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL MASTROGIACOMO
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
04/02/2024
Violation issued (HPD, closed)
A
12/22/2023
Violation issued (HPD, open)
C
12/22/2023
Violation issued (HPD, closed)
A
12/22/2023
Violation issued (HPD, closed)
A
12/22/2023
Violation issued (HPD, open)
C
12/22/2023
Violation issued (HPD, open)
B
12/22/2023
Violation issued (HPD, open)
C
12/22/2023
Violation issued (HPD, closed)
B
12/22/2023
Violation issued (HPD, closed)
A
12/22/2023
Violation issued (HPD, closed)
B
12/22/2023
Violation issued (HPD, open)
C
03/16/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
A
10/11/2018
Violation issued (HPD, closed)
I
11/13/2017
Violation issued (HPD, closed)
I
01/04/2016
Violation issued (HPD, closed)
A
01/04/2016
Violation issued (HPD, closed)
C
01/04/2016
Violation issued (HPD, closed)
A
01/04/2016
Violation issued (HPD, closed)
A
01/04/2016
Violation issued (HPD, closed)
A
10/02/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/15/2011
Violation issued (ECB, closed)
Construction
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/27/2006
Violation issued (HPD, closed)
B
03/30/2005
Violation issued (ECB, closed)
Construction
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/25/1997
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
09/16/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
383 CAPELLAN GROCERY309/19/2026
383 EAST REALTY, INC.303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DENNIS V. PANETTIERI, ARCHITECT209/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORBRIDGE PLUMBING & HEATINGPlumbing109/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MASTROGIACOMO ENGINEERING4237109/01/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHORBRIDGE PLUMBING & HEATING09/18/2026
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/31/2026Fire-Resistant Penetrations and JointsMICHAEL MASTROGIACOMOspecial
08/31/2026Post-installed AnchorsMICHAEL MASTROGIACOMOspecial
08/31/2026Mechanical SystemsMICHAEL MASTROGIACOMOspecial
08/31/2026FinalMICHAEL MASTROGIACOMOprogress
08/31/2026Duct leakage testing, insulation and designMICHAEL MASTROGIACOMOenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/15/2026X01453877-S1Request digital key ↗
09/15/2026X01453877-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026X01453877-I1Open ↗
09/23/2026X01453877-I1Open ↗
09/23/2026X01453877-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/15/2026X01453877-S1Open ↗
09/15/2026X01453877-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026X01453877-I1Open ↗
09/23/2026X01453877-I1Open ↗