← Back
Walk-up apt, over six families with stores
15 GOUVERNEUR PLACE
BRONX · BIN 2001588
💬 Discuss this project
1931Year Built
5Stories
C7Building Class
M1-1/R7-2Zoning
8,133 sfGross Floor Area
10Units
Rent Stabilized20 Open Violations 19 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: CARIBE GOUVERNEUR LLC · 1,804 sf lot · 4.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 07/05/2024
FiledStatusContractorScope
07/05/2024Permit IssuedASCUATECH ELECTRICAL CORP1 meters, 1 new_meters
Building Lifecycle
All (110)Filed (7)Permit Issued (4)Signed Off (2)Violation (60)Inspection (5)Objection (2)Special Inspection (30)
05/21/2026
Signed off — Alteration
PROPOSE DIRECT REPLACEMENT OF AN EXISTING LOW-PRESSURE GAS BOILER & EXTERNAL FUEL BURNER AS PER PLANS SUBMITTED HEREWITH.
X01073436-I1
01/14/2026
Signed off — Alteration
RELOCATING 10 GAS METERS AT THE CELLAR. NEW GAS PIPING THROUGHOUT. REPLACE EXISTING HWH AND GAS PIPING TO THE GAS BURNER AS PER PLANS SUBMITTED HEREWITH. THIS APPLICATION IS ASSOCIATED WITH JOB #X01073436-I1.
X00488852-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/29/2025
Permit issued — Plumbing
X00488852-I1-PL
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
05/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
05/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
05/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
05/07/2025
Special inspection requirement — Maintenance information
Jose Santos
05/05/2025
Filed — Alteration
RELOCATING 10 GAS METERS AT THE CELLAR. NEW GAS PIPING THROUGHOUT. REPLACE EXISTING HWH AND GAS PIPING TO THE GAS BURNER AS PER PLANS SUBMITTED HEREWITH. THIS APPLICATION IS ASSOCIATED WITH JOB #X01073436-I1.
X00488852-P4
04/24/2025
Special inspection requirement — Maintenance information
Jose Santos
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
03/21/2025
Filed — Alteration
RELOCATING 10 GAS METERS AT THE CELLAR. NEW GAS PIPING THROUGHOUT. REPLACE EXISTING HWH AND GAS PIPING TO THE GAS BURNER AS PER PLANS SUBMITTED HEREWITH. THIS APPLICATION IS ASSOCIATED WITH JOB #X01073436-I1.
X00488852-P3
03/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
03/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
03/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
03/12/2025
Special inspection requirement — Maintenance information
Jose Santos
01/17/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/16/2025
Objection resolved — Addressed
12/30/2024
Objection raised — Fire_Protection
12/27/2024
Violation issued (HPD, open)
C
12/27/2024
Violation issued (HPD, open)
C
12/27/2024
Violation issued (HPD, open)
C
12/27/2024
Violation issued (HPD, open)
C
12/26/2024
Filed — Alteration
RELOCATING 10 GAS METERS AT THE CELLAR. NEW GAS PIPING THROUGHOUT. REPLACE EXISTING HWH AND GAS PIPING TO THE GAS BURNER AS PER PLANS SUBMITTED HEREWITH. THIS APPLICATION IS ASSOCIATED WITH JOB #X01073436-I1.
X00488852-P2
12/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
12/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
12/23/2024
Special inspection requirement — Maintenance information
Jose Santos
12/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
12/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jose Santos
12/19/2024
Special inspection requirement — Maintenance information
Jose Santos
12/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
12/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
12/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
12/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/06/2024
Filed — Alteration
PROPOSE DIRECT REPLACEMENT OF AN EXISTING LOW-PRESSURE GAS BOILER & EXTERNAL FUEL BURNER AS PER PLANS SUBMITTED HEREWITH.
X01073436-P1
12/06/2024
Violation issued (HPD, open)
C
12/06/2024
Violation issued (HPD, open)
C
12/06/2024
Violation issued (HPD, open)
C
12/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
12/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/06/2024
Special inspection requirement — Maintenance information
Jose Santos
12/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
12/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
11/18/2024
Permit issued — Boiler Equipment
X01073436-I1-BE
10/03/2024
Filed — Alteration
PROPOSE DIRECT REPLACEMENT OF AN EXISTING LOW-PRESSURE GAS BOILER & EXTERNAL FUEL BURNER AS PER PLANS SUBMITTED HEREWITH.
X01073436-I1
10/03/2024
Filed — Alteration
RELOCATING 10 GAS METERS AT THE CELLAR. NEW GAS PIPING THROUGHOUT. REPLACE EXISTING HWH AND GAS PIPING TO THE GAS BURNER AS PER PLANS SUBMITTED HEREWITH. THIS APPLICATION IS ASSOCIATED WITH JOB #X01073436-I1.
X00488852-P1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2024
Violation issued (HPD, open)
B
09/16/2024
Violation issued (HPD, closed)
A
09/16/2024
Violation issued (HPD, open)
C
09/16/2024
Violation issued (HPD, open)
A
06/06/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CARIBE GOUVERNEUR LLC303/22/2026
15 GOUVERNEUR403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2016$1.5M—15 GOUVERNEUR, LLC → CARIBE GOUVERNEUR LLC$181/sf building
10/29/2013$840K—GOUVERNEUR PLACE LLC → 15 GOUVERNEUR LLC$103/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C705/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSE A. SANTOS P.E.P.C503/21/2026
JOSE A SANTOS P E P C503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&J PLG & HTG CO OF NY INPlumbing207/08/2026
JESUS CORPORANElectrical103/21/2026
JUAN ASCUASIATIElectrical103/21/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292605/05/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN10/29/2025
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG & UTILITY CO11/18/2024
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN05/09/2024
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP03/08/2023
BISPLISSUEDPARKSET PLMBG CO.,INC11/18/2008
BISBLISSUEDPARKSET PLMBG CO.,INC11/18/2008
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/07/2025Fire-Resistant Penetrations and JointsJose Santosspecial
05/07/2025Energy Code Compliance InspectionsJose Santosprogress
05/07/2025HVAC-R and service water heating equipmentJose Santosenergy_progress
05/07/2025HVAC-R and service water heating system controlsJose Santosenergy_progress
05/07/2025Maintenance informationJose Santosenergy_progress
04/24/2025Maintenance informationJose Santosenergy_progress
04/24/2025HVAC-R and service water heating equipmentJose Santosenergy_progress
04/24/2025HVAC-R and service water heating system controlsJose Santosenergy_progress
04/24/2025Energy Code Compliance InspectionsJose Santosprogress
04/24/2025Fire-Resistant Penetrations and JointsJose Santosspecial
03/12/2025HVAC-R and service water heating equipmentJose Santosenergy_progress
03/12/2025Fire-Resistant Penetrations and JointsJose Santosspecial
03/12/2025Energy Code Compliance InspectionsJose Santosprogress
03/12/2025HVAC-R and service water heating system controlsJose Santosenergy_progress
03/12/2025Maintenance informationJose Santosenergy_progress
12/23/2024Fire-Resistant Penetrations and JointsJose Santosspecial
12/23/2024Energy Code Compliance InspectionsJose Santosprogress
12/23/2024Maintenance informationJose Santosenergy_progress
12/23/2024HVAC-R and service water heating system controlsJose Santosenergy_progress
12/23/2024HVAC-R and service water heating equipmentJose Santosenergy_progress
12/19/2024Tenant Protection Plan ComplianceJose Santosspecial
12/19/2024Maintenance informationJose Santosenergy_progress
12/19/2024HVAC-R and service water heating system controlsJose Santosenergy_progress
12/19/2024HVAC-R and service water piping design and insulationJose Santosenergy_progress
12/19/2024HVAC-R and service water heating equipmentJose Santosenergy_progress
Latest 25 of 35.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026X00488852-P1Request digital key ↗
08/25/2026X00488852-P2Request digital key ↗
08/25/2026X00488852-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION6
01/25/2021220544971Open ↗
02/05/2018220544971Open ↗
02/02/2018220544971Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION1
11/18/2008210078146Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature24
09/24/2026X00488852-P3Open ↗
09/24/2026X00488852-P3Open ↗
09/24/2026X00488852-P3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00488852-P2Open ↗
08/25/2026X00488852-P4Open ↗
08/25/2026X00488852-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/24/2026X00488852-P3Open ↗
09/12/2026X01073436-I1Open ↗
09/01/2026X00488852-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/29/2016220544971Open ↗
12/29/2016220544971Open ↗
12/29/2016220544980Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/29/2016220544980Open ↗
12/29/2016220544971Open ↗
11/14/2008210078146Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/29/2016220544980Open ↗
12/29/2016220544971Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/14/2008210078146Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/05/2018220544971Open ↗
02/02/2018220544971Open ↗
12/29/2016220544971Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
11/14/2008210078146Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/14/2008210078146Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
12/29/2016220544980Open ↗
12/29/2016220544971Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026X00488852-P1Open ↗
08/25/2026X00488852-P4Open ↗
08/25/2026X00488852-P3Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/29/2016220544980Open ↗
12/29/2016220544971Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/14/2008210078146Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/29/2016220544971Open ↗
12/29/2016220544980Open ↗
12/29/2016220544980Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00488852-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/20/2026X01073436-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
11/14/2008210078146Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/29/2016220544971Open ↗
12/29/2016220544980Open ↗
11/14/2008210078146Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
12/29/2016220544971Open ↗
12/29/2016220544980Open ↗
▸BISADDITIONAL INFORMATION2
02/05/2018220544971Open ↗
02/02/2018220544971Open ↗
▸BISBOROUGH INTAKE FORM1
02/05/2018220544971Open ↗