← Back
One story retail building
281 EAST 161 STREET
BRONX · BIN 2001948
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
R8AZoning
5,000 sfGross Floor Area
4Units
4 Open Violations ▸
One story retail building · Owner of record: 281 E 161 ST REALTY CORP · 9,600 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Floor 12p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RDT HOME IMPROVEMENT CORP103/22/2026
CLAREMON ASSOCIATES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FIZZ.HAUS410/15/2025
BILLAH ENGINEERING PLLC203/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INSHA BUILDING CONSULTANTS403/21/2026
JENNY FLORES EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANTONJO.CONSTRUCTION INCGeneral Contractor407/08/2026
TREVOR DUNWELLElectrical203/21/2026
CROSSFIELD PLBG.&HTGPlumbing207/08/2026
HUDSON RIVER MECH GROUP IPlumbing207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSS ENGINEERS4492410/15/2025
Building Lifecycle
All (32)Filed (6)Permit Issued (6)Signed Off (1)Violation (5)Inspection (8)Special Inspection (6)
08/31/2026
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
X01131458-I1
04/02/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2026
Violation issued (ECB, open)
Construction
10/15/2025
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
X01131458-S3
08/07/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/25/2025
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
X01131458-P1
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
06/23/2025
Permit issued — Plumbing
X01131458-S2-PL
06/20/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/10/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2024
Permit issued — Plumbing
X01131458-S2-PL
12/10/2024
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
X01131458-S2
12/05/2024
Permit issued — General Construction
X01131458-I1-GC
11/22/2024
Permit issued — General Construction
X01131458-I1-GC
11/14/2024
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
X01131458-I1
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
10/23/2024
Special inspection requirement — Final
Michele Mazzaro
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Michele Mazzaro
10/23/2024
Special inspection requirement — Interior lighting power
Michele Mazzaro
06/21/2021
Permit issued — Plumbing
X00312452-I1-PL
03/28/2021
Filed — Alteration
filing to add plumbing work type in related to BIS application #220721084. installing new sinks, hand-wash, also installing commercial gas cooking equipment at existing 1st commercial space. related waste and gas piping as per plans.
X00312452-P1
07/08/2020
Violation issued (ECB, open)
Unknown
02/12/2020
Permit issued — Plumbing
X00312452-I1-PL
02/11/2020
Filed — Alteration
filing to add plumbing work type in related to BIS application #220721084. installing new sinks, hand-wash, also installing commercial gas cooking equipment at existing 1st commercial space. related waste and gas piping as per plans.
X00312452-I1
11/27/2006
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHUDSON RIVER MECH GROUP I06/23/2025
DOB NOWPlumbingSigned-offHUDSON RIVER MECH GROUP I12/16/2024
DOB NOWGeneral ConstructionSigned-offANTONJO.CONSTRUCTION INC12/05/2024
DOB NOWGeneral ConstructionSigned-offANTONJO.CONSTRUCTION INC11/22/2024
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG06/21/2021
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG02/12/2020
BISOTISSUEDRDT HOME INPROVEMENT CORP12/16/2020
BISOTISSUEDRDT HOME INPROVEMENT CORP08/19/2020
BISPLISSUEDROCK E SMALL PLBG&HTG INC03/26/2012
BISEQISSUEDAEG RESTORATION CORP02/27/2012
BISOTISSUEDAEG RESTORATION CORP02/27/2012
BISFPISSUEDMASTER FIRE PREVENTION SYSTEM06/12/1990
2 projects · most recent 10/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/15/2025Signed-offARJ MECHANICAL INCGas, Water/Sanitary
03/28/2021Permit IssuedCROSSFIELD P & H CORPGas, Water/Sanitary
3 projects · most recent 08/18/2025
General Wiring
FiledStatusContractorScope
08/18/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/26/2023Permit IssuedHECMAR ELECTRICGeneral Wiring
09/01/2020Permit IssuedGEORGE HOLNESSGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/07/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/20/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/25/2025Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
07/22/2025Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
10/23/2024Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
10/23/2024FinalMichele Mazzaroprogress
10/23/2024Energy Code Compliance InspectionsMichele Mazzaroprogress
10/23/2024Interior lighting powerMichele Mazzaroenergy_progress
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/18/2026X01131458-I1Request digital key ↗
08/18/2026X01131458-S3Request digital key ↗
08/18/2026X01131458-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026X00312452-I1Request digital key ↗
08/15/2026X00312452-P1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
12/10/2019220721084Open ↗
05/20/2013220287614Open ↗
02/11/2013220163212Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
12/26/2019220721084Open ↗
03/26/2012220163212Open ↗
02/28/2012220163212Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026X00312452-I1Open ↗
08/25/2026X00312452-P1Open ↗
08/18/2026X01131458-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/10/2019220721084Open ↗
05/20/2013220287614Open ↗
03/20/2012220174184Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X01131458-P1Open ↗
08/31/2026X01131458-S2Open ↗
08/24/2026X01131458-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026X01131458-I1Open ↗
08/24/2026X01131458-I1Open ↗
08/24/2026X01131458-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/10/2019220721084Open ↗
03/20/2012220174184Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/10/2019220721084Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/20/2012220174184Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE3
06/20/2012220163212Open ↗
05/29/2012220163212Open ↗
04/17/2012220163212Open ↗
▸BISSCHEDULE B - PLUMBING2
03/20/2012220174184Open ↗
01/11/2012220163212Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/10/2019220721084Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026X00312452-I1Open ↗
08/25/2026X00312452-P1Open ↗
08/18/2026X01131458-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/13/2026X00312452-P1Open ↗
08/13/2026X01131458-I1Open ↗
08/13/2026X01131458-S3Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/20/2012220174184Open ↗
01/11/2012220163212Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/10/2019220721084Open ↗
05/20/2013220287614Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/18/2026X01131458-I1Open ↗
08/13/2026X00312452-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
12/26/2019220721084Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/10/2019220721084Open ↗
05/20/2013220287614Open ↗
▸BISTECHNICAL REPORT: ENERGY2
03/20/2012220174184Open ↗
01/11/2012220163212Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
03/20/2012220174184Open ↗
01/11/2012220163212Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/10/2019220721084Open ↗
05/20/2013220287614Open ↗
03/20/2012220174184Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
11/29/2019220721084Open ↗
05/20/2013220287614Open ↗
03/20/2012220174184Open ↗
Showing 3 of 4 on file for this type