HPD09/08/2026§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXCESSIVE AMOUNT OVER GROWN FOLIAGE OBSTRUCTING DROP LADDER AT SOUTH YARD
HPD09/08/2026§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF GARBAGE STORED AT SOUTH FIRE PASSAGE WAY
HPD09/08/2026§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF COMBUSTIBLE MATERIAL STORED UNDERNEATH PUBLIC HALL STAIRS , 1st STORY
HPD03/11/2026§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS AT 3RD STORY PARAPET WALL AT EAST EXTERIOR WALL BUILDING FRONT
ECB11/21/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTROL #347925 VIO #101525PI20402SB DATED 10/15/25. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTIONPLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S ORDER.$2K due
DOB10/15/2025FTC W/COMMISSIONER'S ORDER CONTROL#348278 VIO#082825PI20404HZ DATED 8/28/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 09/18/25 & START BLDG REPAIRS UNDER PERMIT BY 10/28/25,COMPL/SIGN OFF BY 11/28/25 AS TODAY 10/15/25 A CAP&EVIDENT WRK WAS NOT REC'D.IMMED COMPLY W/COMMISSIONER'S ORDER #348278 VIO#082825PI20404HZ
DOB10/08/2025EMERGENCY WORK ORDER-ON 8/28/25 OBSVD @ EXP1 DISLODGED BRICKS WITH MISSING MORTAR WALL BOWING OUTWARD & LEANING PARAPET WALL.DOB REC'D A REPORT FROM FALCON GROUP DATED 9/25/25 REC'D 9/26/25 INDICATING THE EXP1&2 PARAPETS ARE UNSAFE. OWNER TO IMMED HIRE DOB REG GC-INSTALL S/W SHED PROV APPROX 27 LINEAR FT ALONG FULL WITH OF EXP1
DOB08/28/2025FTM BLDG PARAPET WALL IN SAFE CONDITION-OBSVD THE FRONT SIDE PARAPET WALL IN DISREPAIR LEFT SIDE CORNER-DISLODGED BRICKS CENTER OF WALL W/DISLODGED MORTAR,VERT CRACKS,AND WALL IS LEANING INWARD&DISLODGED BRICKS. SUBMIT ANNUAL PARAPET OBSV REPORT TO PROACTIVEINSP@BUILDINGS.N YC.GOV BY NOT LATER THAN SEPT 03 2025
DOB08/25/2025CORRECTIVE ACTION PLAN REQ'D-OBSVD @ FRONT SIDE OF BLDG BRICK DISLODGEMENT & MORTAR AROUND BRICKS CENTER PARAPET WALL IS LEANING INWARD. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/NYSED TO EVAL ENTIRE BLDG AND TO SUBMIT A CORRECTIVE ACTION PLAN BY 9-18-25 ADRESSING ALL COND. BLDG TO BE REPAIRED UNDER PERMIT STARTING 10/28/25
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE