← Back
Walk-up cooperative
201 EAST 165 STREET
BRONX · BIN 2002730
💬 Discuss this project
1918Year Built
5Stories
C6Building Class
R7-1Zoning
19,955 sfGross Floor Area
31Units
Rent Stabilized0 Open Violations
Walk-up cooperative · Owner of record: 201 TPT, LLC · 5,181 sf lot · 3.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof3p · 1 filing · 3 docs
Cellar3p · 2 filings · 20 docs
Basement1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
201 TPT1203/22/2026
DEVEPMENT CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC410/30/2023
A SAXON DESIGN GROUP106/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPECSERVICES,LLCGeneral Contractor303/21/2026
CAM ENERGY HTG&MECH CORPPlumbing207/08/2026
TREVOR DUNWELLElectrical103/21/2026
DAVRIAL ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746410/30/2023
R MARSAC CONSULTING LLC329106/29/2022
Building Lifecycle
All (67)Filed (5)Permit Issued (4)Signed Off (3)Violation (35)Inspection (2)Objection (6)Special Inspection (12)
02/15/2026
Violation issued (HPD, closed)
C
12/04/2024
Violation issued (HPD, closed)
C
12/04/2024
Violation issued (HPD, closed)
C
10/20/2024
Violation issued (HPD, closed)
C
10/20/2024
Violation issued (HPD, closed)
C
10/20/2024
Violation issued (HPD, closed)
A
11/29/2023
Signed off — Alteration
REGISTER EXISTING GAS FIRED BOILER TO ADDRESS VIOLATION# 39084432H AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X00900673-I1
11/29/2023
Signed off — Alteration
CONNECT REPLACEMENT GAS PIPING TO EXISTING GAS PIPING TO REGISTER EXISTING BOILER TO ADDRESS VIOLATION# 39084432H AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X00892037-I1
10/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
10/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/31/2023
Special inspection requirement — Maintenance information
Stephen Shishko
10/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/30/2023
Filed — Alteration
CONNECT REPLACEMENT GAS PIPING TO EXISTING GAS PIPING TO REGISTER EXISTING BOILER TO ADDRESS VIOLATION# 39084432H AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X00892037-P2
10/24/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/21/2023
Filed — Alteration
CONNECT REPLACEMENT GAS PIPING TO EXISTING GAS PIPING TO REGISTER EXISTING BOILER TO ADDRESS VIOLATION# 39084432H AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X00892037-P1
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
09/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
09/20/2023
Special inspection requirement — Maintenance information
Stephen Shishko
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
09/11/2023
Violation issued (HPD, closed)
C
09/11/2023
Violation issued (HPD, closed)
B
09/11/2023
Violation issued (HPD, closed)
B
09/11/2023
Violation issued (HPD, closed)
B
09/11/2023
Violation issued (HPD, closed)
B
08/09/2023
Violation issued (HPD, closed)
C
08/09/2023
Violation issued (HPD, closed)
C
08/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2023
Signed off — Alteration
Installation of DISH telecommunications site on ROOF. Install (3) antenna sectors, (6) RRH units, (1) GPS unit, (1) wall mounted cabinet on ROOF. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.
X00748911-I1
07/25/2023
Permit issued — Plumbing
X00892037-I1-PL
07/24/2023
Permit issued — Boiler Equipment
X00900673-I1-BE
07/07/2023
Filed — Alteration
REGISTER EXISTING GAS FIRED BOILER TO ADDRESS VIOLATION# 39084432H AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X00900673-I1
07/07/2023
Filed — Alteration
CONNECT REPLACEMENT GAS PIPING TO EXISTING GAS PIPING TO REGISTER EXISTING BOILER TO ADDRESS VIOLATION# 39084432H AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X00892037-I1
07/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
07/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
07/07/2023
Special inspection requirement — Maintenance information
Stephen Shishko
07/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
04/24/2023
Violation issued (ECB, closed)
Boilers
11/04/2022
Permit issued — Antenna
X00748911-I1-AN
09/01/2022
Permit issued — Antenna
X00748911-I1-AN
07/07/2022
Objection raised — Inspections
07/07/2022
Objection resolved — Addressed
07/07/2022
Objection raised — Zoning
07/07/2022
Objection resolved — Addressed
07/07/2022
Objection raised — Scope
07/07/2022
Objection resolved — Addressed
06/29/2022
Filed — Alteration
Installation of DISH telecommunications site on ROOF. Install (3) antenna sectors, (6) RRH units, (1) GPS unit, (1) wall mounted cabinet on ROOF. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.
X00748911-I1
11/12/2018
Violation issued (HPD, closed)
B
11/12/2018
Violation issued (HPD, closed)
B
08/03/2011
Violation issued (ECB, closed)
Boilers
03/03/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2002
Violation issued (ECB, closed)
Boilers
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2000
Violation issued (HPD, closed)
C
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP07/25/2023
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG&MECH CORP07/24/2023
DOB NOWAntennaSigned-offDAVRIAL ENTERPRISES INC11/04/2022
DOB NOWAntennaSigned-offSPECSERVICES,LLC09/01/2022
BISPLISSUEDNATIONWIDE MECHANICAL INC03/04/2008
BISEQISSUEDGREAT AMERICAN CONSTRUCTION CORP01/02/2008
BISEQISSUEDGREAT AMERICAN CONSTRUCTION CORP09/13/2007
BISOTISSUEDGREAT AMERICAN CONSTRUCTION CORP09/13/2007
BISPLISSUEDW.G. PLUMBING & HEATING10/25/2006
BISOTISSUEDGREAT AMERICAN CONSTRUCTION CORP09/26/2006
BISEQRE-ISSUEDGREAT AMERICAN CONSTRUCTION CORP09/26/2006
BISEQISSUEDCOLGATE SCAFFOLDING08/11/2006
BISEQISSUEDGREAT AMERICAN CONSTRUCTION CORP08/04/2006
BISBLISSUEDEMPIRE USED BOILER SUPPLY07/16/1997
3 projects · most recent 10/27/2022
General Wiring
FiledStatusContractorScope
10/27/2022Permit IssuedAPPROVED ELECTRIC CORP.General Wiring
10/13/2022CompleteREDGRAVE ELECTL MAINTNCE33 meters, 1 new_meters
08/03/2022Permit IssuedWIRE ELECTRIC INST CO INC33 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/31/2023Tenant Protection Plan ComplianceStephen Shishkospecial
10/31/2023HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
10/31/2023Maintenance informationStephen Shishkoenergy_progress
10/31/2023HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
09/20/2023HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
09/20/2023Tenant Protection Plan ComplianceStephen Shishkospecial
09/20/2023Maintenance informationStephen Shishkoenergy_progress
09/20/2023HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
07/07/2023HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
07/07/2023HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
07/07/2023Maintenance informationStephen Shishkoenergy_progress
07/06/2023Tenant Protection Plan ComplianceStephen Shishkospecial
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026X00900673-I1Request digital key ↗
08/22/2026X00892037-I1Request digital key ↗
08/22/2026X00892037-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026X00900673-I1Open ↗
09/23/2026X00900673-I1Open ↗
09/23/2026X00900673-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026X00748911-I1Open ↗
08/23/2026X00900673-I1Open ↗
08/22/2026X00892037-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026X00900673-I1Open ↗
08/25/2026X00892037-P1Open ↗
08/23/2026X00892037-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026X00900673-I1Open ↗
08/22/2026X00892037-P1Open ↗
08/22/2026X00892037-P2Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026X00900673-I1Open ↗
08/13/2026X00892037-I1Open ↗
08/13/2026X00892037-P2Open ↗
Showing 3 of 4 on file for this type