← Back
Over six families without stores
1385 NELSON AVENUE
BRONX · BIN 2003348
💬 Discuss this project
1924Year Built
5Stories
C1Building Class
R7-1Zoning
36,250 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized27 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1385 NELSON AVE HOUSI · 10,000 sf lot · 3.63 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Bulkhead1p · 1 filing · 6 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J S K CONSTRUCTION404/09/2026
1385 NELSON AVE HOUSIN203/22/2026
HPD603/21/2026
1385 NELSON AVE H D F C C O203/21/2026
CITY OF NEW YORK DEPT OF HPD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC107/03/2025
FREDA DESIGN ARCHITECT, PLLC105/15/2025
BAZINI ENGINEERING, P.C.111/01/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W&W STEEL ERECTORS LLCElectrical303/21/2026
BOWIE, RONALDElectrical303/21/2026
J.S.K. CONSTRUCTION CORPGeneral Contractor204/09/2026
MALDONADO, WElectrical103/21/2026
MARTINEZ, WElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
SPEZIALE, JOSEPHElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
LANFRANCO, JAMESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FREDA DESIGN ARCHITECT PL837105/15/2025
Building Lifecycle
All (76)Filed (3)Permit Issued (4)Signed Off (2)Violation (60)Inspection (3)Special Inspection (4)
06/22/2026
Violation issued (ECB, open)
Unknown
05/07/2026
Violation issued (HPD, closed)
C
04/30/2026
Signed off — Alteration
repair masonry walls, install new masonry lintels, repoint masonry walls, waterproof and stucco walls, replace bulkhead skylights, all as per drawings filed herewith.
X01181101-I1
04/29/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
A
04/17/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
A
04/17/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
C
04/17/2026
Violation issued (HPD, closed)
B
04/17/2026
Violation issued (HPD, open)
B
04/17/2026
Violation issued (HPD, closed)
A
04/17/2026
Violation issued (HPD, closed)
A
04/17/2026
Violation issued (HPD, closed)
B
04/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/02/2026
Violation issued (HPD, closed)
C
04/02/2026
Violation issued (HPD, closed)
B
04/02/2026
Violation issued (HPD, closed)
B
04/02/2026
Violation issued (HPD, closed)
C
04/02/2026
Violation issued (HPD, closed)
B
04/02/2026
Violation issued (HPD, open)
C
03/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/10/2026
Violation issued (HPD, closed)
A
03/10/2026
Violation issued (HPD, closed)
B
03/10/2026
Violation issued (HPD, closed)
B
03/10/2026
Violation issued (HPD, open)
B
03/10/2026
Violation issued (HPD, open)
B
03/10/2026
Violation issued (HPD, closed)
B
03/10/2026
Violation issued (HPD, closed)
B
03/10/2026
Violation issued (HPD, open)
C
03/10/2026
Violation issued (HPD, closed)
B
03/10/2026
Violation issued (HPD, closed)
C
03/09/2026
Violation issued (HPD, closed)
B
03/09/2026
Violation issued (HPD, open)
B
03/09/2026
Violation issued (HPD, closed)
B
03/09/2026
Violation issued (HPD, open)
B
03/09/2026
Violation issued (HPD, open)
B
03/09/2026
Violation issued (HPD, closed)
B
03/09/2026
Violation issued (HPD, closed)
B
02/14/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
B
02/07/2026
Violation issued (HPD, open)
C
02/07/2026
Violation issued (HPD, closed)
C
02/03/2026
Violation issued (HPD, closed)
A
02/03/2026
Violation issued (HPD, closed)
A
02/03/2026
Violation issued (HPD, open)
C
02/03/2026
Violation issued (HPD, open)
B
02/03/2026
Violation issued (HPD, closed)
C
02/03/2026
Violation issued (HPD, closed)
B
11/22/2025
Violation issued (HPD, closed)
C
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJSK CONSTRUCTION08/28/2025
DOB NOWSidewalk ShedPermit IssuedJSK CONSTRUCTION07/03/2025
DOB NOWBoiler EquipmentSigned-offFOUR SUNS FUEL OIL CO INC10/16/2020
DOB NOWBoiler EquipmentSigned-offFOUR SUNS FUEL OIL CO INC12/24/2019
BISFBISSUEDEFFICIENT COMB&COOLING CO04/07/2000
BISPLISSUEDF& G PLUMBING & HEATING CORP06/23/1999
BISFSISSUEDA.B.C. FUEL OIL CO., INC07/09/1998
BIS—ISSUEDNY FRIENDLY CONSTRUCTION INC02/10/1998
BISPLISSUEDST. MARKS P & H CO INC11/21/1997
BISEQISSUEDNY FRIENDLY CONSTRUCTION INC10/10/1997
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING01/31/1995
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING08/25/1994
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING04/08/1994
BISPLISSUEDF& G PLUMBING & HEATING CORP03/07/1994
BISOTISSUEDDAKAR DEVELOPERS, INC.02/24/1994
1 project · most recent 09/16/2025
FiledStatusContractorScope
09/16/2025Permit IssuedRICHARD NEU—
1 project · most recent 07/03/2025
Sidewalk Shed
FiledStatusContractorScope
07/03/2025Permit IssuedJ.S.K. CONSTRUCTION CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/13/2025MasonryAntonio Fredaspecial
02/13/2025Tenant Protection Plan ComplianceAntonio Fredaspecial
02/13/2025FinalAntonio Fredaprogress
09/24/2019HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/19/2026X01181101-I1Request digital key ↗
08/19/2026X01241536-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/26/2026X00233736-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026X00233736-I1Open ↗
08/13/2026X01181101-I1Open ↗
08/13/2026X01241536-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X01181101-I1Open ↗
08/26/2026X01181101-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026X00233736-I1Open ↗
08/26/2026X01181101-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026X00233736-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01181101-I1Open ↗
08/13/2026X00233736-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00233736-I1Open ↗