← Back
Factory, special construction, fireproof
777 EAST 138 STREET
BRONX · BIN 2004011
💬 Discuss this project
1936Year Built
1Stories
F2Building Class
M3-1Zoning
25,000 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Factory, special construction, fireproof · Owner of record: MARATHON ENTERPRISES, INC · 32,500 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
1 job · most recent 05/21/2025
Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
05/21/2025Signed-offHUGHES ENVIRONMENTAL ENGIRefrigeration Systems
Refrigeration
Trenton TLV441MA-S1D 48,680 BTU ×8
TESA100H8-HT4D 97,360 BTU · Condensing Unit ×4
Building Lifecycle
All (43)Filed (4)Permit Issued (3)Signed Off (3)Violation (7)Inspection (4)Special Inspection (22)
07/28/2026
Signed off — Alteration
Replacing existing two condensing units units with new on existing dunnage on roof and four indoor evaporating units on first floor with new piping as per plans filed herewith.
X01217838-I1
05/28/2025
Permit issued — Mechanical Systems
X01217838-I1-MS
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Merhige
05/27/2025
Special inspection requirement — Mechanical Systems
Ronald Merhige
05/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
05/27/2025
Special inspection requirement — Final
Ronald Merhige
05/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
05/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ronald Merhige
05/27/2025
Special inspection requirement — Maintenance information
Ronald Merhige
05/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ronald Merhige
05/21/2025
Filed — Alteration
Replacing existing two condensing units units with new on existing dunnage on roof and four indoor evaporating units on first floor with new piping as per plans filed herewith.
X01217838-P1
05/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Merhige
05/21/2025
Special inspection requirement — Mechanical Systems
Ronald Merhige
05/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
05/21/2025
Special inspection requirement — Final
Ronald Merhige
05/21/2025
Special inspection requirement — Maintenance information
Ronald Merhige
05/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
05/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ronald Merhige
05/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ronald Merhige
05/09/2025
Filed — Alteration
Replacing existing two condensing units units with new on existing dunnage on roof and four indoor evaporating units on first floor with new piping as per plans filed herewith.
X01217838-I1
04/30/2025
Signed off — Alteration
INSTALL NEW GAS HIGH PRESSURE BOILER.
X00845564-I1
04/30/2025
Signed off — Alteration
EXTEND GAS PIPING & INSTALL DIRECT VENT FOR NEW BOILER
X00845670-I1
05/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/01/2023
Permit issued — Boiler Equipment
X00845564-I1-BE
08/01/2023
Permit issued — Plumbing
X00845670-I1-PL
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2023
Filed — Alteration
INSTALL NEW GAS HIGH PRESSURE BOILER.
X00845564-I1
04/24/2023
Filed — Alteration
EXTEND GAS PIPING & INSTALL DIRECT VENT FOR NEW BOILER
X00845670-I1
03/30/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
03/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/17/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
03/17/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
10/23/2017
Violation issued (ECB, open)
Unknown
09/21/2015
Violation issued (ECB, closed)
Construction
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/1995
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
03/22/1995
Violation issued (DOB, closed)
VH*-VIOLATION HAZARDOUS DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARATHON ENTERPRISES2707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM ENGINEERING PLLC205/21/2025
NEW YORK ENGINEERING ASSOC., P.C.204/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R & G MECHANICAL CORPPlumbing207/08/2026
HUGHES ENVIRONMENTAL ENGIGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLM ENGINEERING PLLC6913205/21/2025
NEW YORK ENGINEERING ASSO851104/24/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHUGHES ENVIRONMENTAL ENGI05/28/2025
DOB NOWBoiler EquipmentSigned-offR & G MECHANICAL CORP08/01/2023
DOB NOWPlumbingSigned-offR & G MECHANICAL CORP08/01/2023
BISPLISSUEDGSB PLUMBING & HEATING CO04/11/2024
BISPLISSUEDGSB PLUMBING & HEATING CO02/06/2023
BISBLISSUEDGSB PLUMBING & HEATING CO12/02/2021
BISPLISSUEDGSB PLUMBING & HEATING CO12/02/2021
BISBLISSUEDGSB PLUMBING & HEATING CO12/01/2020
BISBLISSUEDGSB PLUMBING & HEATING CO07/10/2020
BISPLISSUEDGSB PLUMBING & HEATING CO07/10/2020
BISPLISSUEDGSB PLUMBING & HEATING CO02/27/2019
BISBLISSUEDGSB PLUMBING & HEATING CO02/22/2019
BISOTISSUEDJV & SONS CONSTRUCTION IN02/19/2019
BISOTISSUEDJOHANNES HOFFMAN ARCHITECTS, P.C07/13/2001
BISSPISSUEDNEW ERA MECH SERVICE INC03/19/2001
BISPLISSUEDEXPRESS PLBG SEWR AND WTR02/01/2001
BISPLISSUEDEXPRESS PLBG SEWR AND WTR09/13/2000
BISOTISSUEDFRED CHRAPKO CONST. CORP07/05/2000
BISEQISSUEDFRED CHRAPKO CONST. CORP07/05/2000
BISOTISSUEDFRED CHRAPKO CONSTRUCTION CORP.06/27/2000
BISOTISSUEDFRED CHRAPKO CONSTRUCTION CORP.05/31/2000
BISOTISSUEDFRED CHRAPKO CONSTRUCTION CORP.11/22/1999
BIS—RE-ISSUEDFRED CHRAPKO CONSTRUCTION CORP11/16/1999
BISEQISSUEDFRED CHRAPKO CONST. CORP06/28/1999
BISOTISSUEDFRED CHRAPKO CONST. CORP06/28/1999
BISPLISSUEDEXPRESS PLBG SEWR AND WTR06/15/1999
BISOTISSUEDFRED CHRAPKO CONSTRUCTION CORP.05/20/1999
BISOTISSUEDFRED CHRAPKO CONSTRUCTION CORP.05/20/1999
BISMHISSUEDFRED CHRAPKO CONSTRUCTION CORP.05/20/1999
BISOTISSUEDFRED CHRAPKO CONST. CORP03/11/1999
BISEQISSUEDFRED CHRAPKO CONST. CORP03/11/1999
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/27/2025Fire-Resistant Penetrations and JointsRonald Merhigespecial
05/27/2025Mechanical SystemsRonald Merhigespecial
05/27/2025Energy Code Compliance InspectionsRonald Merhigeprogress
05/27/2025FinalRonald Merhigeprogress
05/27/2025HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
05/27/2025HVAC-R and service water heating system controlsRonald Merhigeenergy_progress
05/27/2025Maintenance informationRonald Merhigeenergy_progress
05/27/2025HVAC-R and service water piping design and insulationRonald Merhigeenergy_progress
05/21/2025Fire-Resistant Penetrations and JointsRonald Merhigespecial
05/21/2025Mechanical SystemsRonald Merhigespecial
05/21/2025Energy Code Compliance InspectionsRonald Merhigeprogress
05/21/2025FinalRonald Merhigeprogress
05/21/2025Maintenance informationRonald Merhigeenergy_progress
05/21/2025HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
05/21/2025HVAC-R and service water piping design and insulationRonald Merhigeenergy_progress
05/21/2025HVAC-R and service water heating system controlsRonald Merhigeenergy_progress
03/30/2023Maintenance informationLOUIS ARENAenergy_progress
03/30/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/30/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/30/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
03/17/2023Heating SystemsLOUIS ARENAspecial
03/17/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026X00845670-I1Request digital key ↗
08/23/2026X00845564-I1Request digital key ↗
08/19/2026X01217838-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
02/19/2019240246854Open ↗
01/23/2019240246854Open ↗
01/23/2019240246854Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/23/2019240246854Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
01/23/2019240246854Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026X00845564-I1Open ↗
09/01/2026X01217838-I1Open ↗
09/01/2026X01217838-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X00845564-I1Open ↗
09/01/2026X01217838-I1Open ↗
09/01/2026X01217838-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026X00845670-I1Open ↗
08/23/2026X00845564-I1Open ↗
08/19/2026X01217838-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/23/2019240246854Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/23/2019240246854Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/23/2019240246854Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
01/23/2019240246854Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/23/2019240246854Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026X00845670-I1Open ↗
08/23/2026X00845564-I1Open ↗
08/19/2026X01217838-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/23/2019240246854Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/28/2024240246854Open ↗
01/23/2019240246854Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
08/07/2024240246854Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/28/2024240246854Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/23/2019240246854Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/28/2024240246854Open ↗
01/23/2019240246854Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/03/2024240246854Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
01/23/2019240246854Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/28/2024240246854Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/23/2019240246854Open ↗
▸Other Documents1
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
01/23/2019240246854Open ↗