← Back
Over six families without stores
1153 BOSTON ROAD
BRONX · BIN 2004291
💬 Discuss this project
1900Year Built
5Stories
C1Building Class
R6Zoning
12,835 sfGross Floor Area
20Units
Rent Stabilized52 Open Violations 51 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 1153 BOSTON LLC · 3,400 sf lot · 3.78 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN707/08/2026
1153 BOSTON703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES206/05/2025
H G LEE ARCHITECT PC111/16/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050206/05/2025
SOTIR ASSOCIATES7473110/17/2024
HG LEE ARCHITECT PC2554111/16/2022
Building Lifecycle
All (88)Filed (3)Permit Issued (2)Signed Off (1)Violation (60)Inspection (2)Objection (14)Special Inspection (6)
04/30/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
C
04/30/2026
Violation issued (HPD, open)
C
04/23/2026
Violation issued (HPD, open)
C
03/30/2026
Violation issued (ECB, closed)
Construction
11/17/2025
Violation issued (HPD, closed)
I
09/24/2025
Signed off — Alteration
INTERIOR RENOVATIONS TO THE EXISTING APARTMENTS: 1B, 2B, 2C, 3B, 3C, & 4B. ASSOCIATED PLUMBING WORK TO BE FILED SUBSEQUENTLY.
X01122980-I1
09/12/2025
Violation issued (HPD, open)
B
09/12/2025
Violation issued (HPD, closed)
B
09/12/2025
Violation issued (HPD, closed)
A
09/12/2025
Violation issued (HPD, closed)
B
09/12/2025
Violation issued (HPD, closed)
C
09/12/2025
Violation issued (HPD, closed)
C
08/20/2025
Objection raised — C/O of existing property requi
08/20/2025
Objection resolved — Resolved
07/19/2025
Violation issued (HPD, closed)
A
07/19/2025
Violation issued (HPD, closed)
A
07/19/2025
Violation issued (HPD, open)
B
07/19/2025
Violation issued (HPD, open)
C
07/19/2025
Violation issued (HPD, closed)
C
07/19/2025
Violation issued (HPD, closed)
A
07/19/2025
Violation issued (HPD, closed)
A
07/19/2025
Violation issued (HPD, closed)
A
07/19/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, closed)
C
07/03/2025
Violation issued (HPD, open)
C
07/03/2025
Violation issued (HPD, closed)
C
07/03/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (HPD, open)
B
07/02/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (HPD, closed)
A
07/02/2025
Violation issued (HPD, open)
C
07/02/2025
Violation issued (HPD, open)
C
06/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/05/2025
Filed — Alteration
INTERIOR RENOVATIONS TO THE EXISTING APARTMENTS: 1B, 2B, 2C, 3B, 3C, & 4B. ASSOCIATED PLUMBING WORK TO BE FILED SUBSEQUENTLY.
X01122980-P1
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
06/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
06/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/04/2025
Violation issued (HPD, closed)
A
04/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/27/2025
Violation issued (HPD, closed)
C
03/27/2025
Violation issued (HPD, closed)
C
03/27/2025
Violation issued (HPD, closed)
B
03/27/2025
Violation issued (HPD, closed)
C
03/27/2025
Violation issued (HPD, closed)
C
03/20/2025
Permit issued — General Construction
X01122980-I1-GC
03/04/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, closed)
B
01/16/2025
Violation issued (HPD, open)
C
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC03/20/2025
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC10/30/2024
BISFBISSUEDEAST COAST PETROLEUM03/16/1998
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/05/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
06/05/2025Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
06/05/2025Tenant Protection Plan Compliance—special
11/16/2022Fire-Resistant Penetrations and JointsHe Gin Leespecial
11/16/2022Tenant Protection Plan Compliance—special
11/16/2022Fire-Resistance Rated ConstructionHe Gin Leeprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026X01122980-I1Request digital key ↗
08/19/2026X01122980-P1Request digital key ↗
08/15/2026X00793684-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026X00793684-I1Open ↗
08/19/2026X01122980-I1Open ↗
08/19/2026X01122980-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X01122980-P1Open ↗
08/27/2026X00793684-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026X00793684-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026X01122980-I1Open ↗
08/19/2026X01122980-P1Open ↗
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026X00793684-I1Open ↗