← Back
Walk-up apt, over six families with stores
1272 BOSTON ROAD
BRONX · BIN 2004752
💬 Discuss this project
1913Year Built
5Stories
C7Building Class
R6Zoning
11,000 sfGross Floor Area
15Units
Rent Stabilized44 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: BEULAH CLUSTER HOUSING DEVELOPMENT FUND COMPANY · 3,500 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEULAH HDFC1807/08/2026
TRIERA CONTRACTING INC503/22/2026
BEULAH CLUSTER HOUSING DEVELOPMENT FUND COMPANY103/22/2026
HPD203/21/2026
BEULAH CLUSTER HDFC403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OCV ARCHITECTS504/08/2025
ASR ENGINEERING PC108/29/2022
ENTHINK ENGINEERS LLC107/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCV ARCHITECTS503/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONROCK CONSTRUCTION LLCGeneral Contractor607/08/2026
TRIERA CONTRACTING INCGeneral Contractor303/21/2026
NUNEZ, JOSEElectrical203/21/2026
JANKUC, JONELElectrical203/21/2026
GBL MECHANICAL INCPlumbing207/08/2026
RICHARD NEUElectrical103/21/2026
YARKS NYC INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267604/08/2025
Building Lifecycle
All (99)Filed (7)Permit Issued (8)Signed Off (5)Violation (60)Inspection (4)Objection (2)Special Inspection (13)
04/29/2026
Violation issued (HPD, closed)
A
07/16/2025
Signed off — Alteration
BOILER REPLACEMENT FILED IN CONJUNCTION WITH ALTERATION APPLICATION #X00607378-I1
X00607378-S1
07/16/2025
Signed off — Alteration
BOILER REPLACEMENT FILED IN CONJUNCTION WITH ALTERATION APPLICATION #X00607378-I1
X00607378-I1
07/15/2025
Signed off — Alteration
BOILER REPLACEMENT FILED IN CONJUNCTION WITH ALTERATION APPLICATION #X00607378-I1
X00607378-S2
06/28/2025
Violation issued (HPD, open)
B
06/28/2025
Violation issued (HPD, open)
B
06/28/2025
Violation issued (HPD, open)
A
06/28/2025
Violation issued (HPD, open)
B
04/21/2025
Violation issued (HPD, open)
B
04/21/2025
Violation issued (HPD, closed)
A
04/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/11/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X07993802-I1
04/08/2025
Filed — Alteration
BOILER REPLACEMENT FILED IN CONJUNCTION WITH ALTERATION APPLICATION #X00607378-I1
X00607378-P3
04/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
04/08/2025
Special inspection requirement — Maintenance information
Matthew Wavro
04/06/2025
Violation issued (HPD, open)
A
04/06/2025
Violation issued (HPD, open)
B
04/06/2025
Violation issued (HPD, open)
B
04/06/2025
Violation issued (HPD, open)
B
04/06/2025
Violation issued (HPD, open)
B
04/06/2025
Violation issued (HPD, open)
B
04/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00771413-I1
03/30/2025
Violation issued (HPD, open)
B
03/25/2025
Violation issued (HPD, closed)
C
03/15/2025
Violation issued (HPD, closed)
C
03/15/2025
Violation issued (HPD, closed)
C
03/15/2025
Violation issued (HPD, closed)
C
03/15/2025
Violation issued (HPD, closed)
C
03/10/2025
Violation issued (HPD, open)
B
03/10/2025
Violation issued (HPD, open)
B
03/10/2025
Violation issued (HPD, closed)
B
03/10/2025
Violation issued (HPD, closed)
B
03/10/2025
Violation issued (HPD, open)
B
03/10/2025
Violation issued (HPD, open)
B
03/10/2025
Violation issued (HPD, closed)
C
03/10/2025
Violation issued (HPD, open)
A
02/24/2025
Violation issued (HPD, closed)
C
02/24/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
B
02/19/2025
Violation issued (HPD, open)
B
02/19/2025
Violation issued (HPD, open)
B
02/19/2025
Violation issued (HPD, open)
C
02/19/2025
Violation issued (HPD, closed)
B
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
B
02/19/2025
Violation issued (HPD, closed)
B
09/18/2024
Permit issued — General Construction
X00607378-I1-GC
09/12/2024
Violation issued (HPD, closed)
B
09/06/2024
Violation issued (HPD, open)
B
09/06/2024
Violation issued (HPD, closed)
A
09/06/2024
Violation issued (HPD, closed)
B
09/06/2024
Violation issued (HPD, closed)
B
09/06/2024
Violation issued (HPD, closed)
C
09/06/2024
Violation issued (HPD, open)
B
09/06/2024
Violation issued (HPD, open)
B
09/06/2024
Violation issued (HPD, open)
B
09/06/2024
Violation issued (HPD, closed)
C
09/06/2024
Violation issued (HPD, open)
A
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCONROCK CONSTRUCTION LLC09/18/2024
DOB NOWGeneral ConstructionSigned-offCONROCK CONSTRUCTION LLC04/11/2024
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC01/18/2024
DOB NOWBoiler EquipmentSigned-offLIQUID TECH PLBG&HTG,INC10/24/2023
DOB NOWGeneral ConstructionSigned-offCONROCK CONSTRUCTION LLC04/24/2023
DOB NOWSupported ScaffoldSigned-offYARKS NYC INC08/29/2022
DOB NOWGeneral ConstructionSigned-offCONROCK CONSTRUCTION LLC07/25/2022
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC07/08/2022
BIS—ISSUEDJEROME CONSTRUCTION CO LCC04/01/2002
BISSPISSUEDEXPERT FIRE SPRINKLER,LLC03/08/2002
BISPLISSUEDDAFF MECHANICAL INC.03/08/2002
BISPLISSUEDDAFF MECHANICAL INC.02/14/2002
BIS—ISSUEDJEROME CONSTRUCTION CO LCC11/23/2001
BISEQISSUEDTRIPLE R. INC10/05/1998
BISOTISSUEDMART CONST. CO INC09/08/1998
1 project · most recent 07/08/2022
FiledStatusContractorScope
07/08/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/08/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
04/08/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
04/08/2025Maintenance informationMatthew Wavroenergy_progress
02/05/2024Tenant Protection Plan Compliance—special
02/05/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
02/05/2024Maintenance informationMatthew Wavroenergy_progress
09/25/2023Tenant Protection Plan ComplianceMatthew Wavrospecial
06/27/2023Maintenance informationMatthew Wavroenergy_progress
06/27/2023Heating SystemsMatthew Wavrospecial
06/27/2023HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
06/27/2023HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
06/27/2023HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
10/06/2021FinalJOHN COOGANprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026X00607378-P3Request digital key ↗
08/25/2026X00607378-I1Request digital key ↗
08/25/2026X00607378-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00607378-S2Open ↗
08/25/2026X00607378-I1Open ↗
08/25/2026X00607378-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026X00607378-S1Open ↗
09/01/2026X00607378-S1Open ↗
09/01/2026X00607378-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026X00607378-S1Open ↗
09/01/2026X00607378-S1Open ↗
08/31/2026X00607378-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026X00607378-I1Open ↗
08/25/2026X00607378-S2Open ↗
08/25/2026X00607378-P3Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00607378-S1Open ↗
08/13/2026X00607378-S2Open ↗