← Back
BRONX
1051 KELLY STREET
BRONX · BIN 2005490
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
78 Open Violations 72 unresolved · 6 paperwork only ▸
Flood zone X
Locations of Work
Architecture
Cellar2p · 1 filing · 4 docs
1 job · most recent 12/03/2024
General Wiring
FiledStatusContractorScope
12/03/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
Building Lifecycle
All (71)Filed (2)Permit Issued (1)Signed Off (1)Violation (60)Inspection (1)Objection (2)Special Inspection (4)
09/10/2026
Filed — Alteration
PROPOSE TO RESTORE AN EXIT PATHWAY TO AN EXISTING 2ND MEANS OF EGRESS AT THE CELLAR APARTMENT AS PER PLANS SUBMITTED HEREWITH.
X01434926-I1
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
07/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jose Santos
06/08/2026
Violation issued (HPD, open)
B
04/23/2026
Signed off — Alteration
Addressing Violations 39127479M;39127482N;39127483P;39127485Z;39127480J. Remove non-load-bearing partitions & plumbing fixtures created in the cellar and show the installation of a chain link fence at the rear yard. PL filed under LAA #X01147277-I1.
X01158495-I1
04/22/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2026
Violation issued (ECB, open)
Construction
02/25/2026
Violation issued (ECB, open)
Construction
02/25/2026
Violation issued (ECB, open)
Construction
02/25/2026
Violation issued (ECB, open)
Construction
02/25/2026
Violation issued (ECB, open)
Construction
02/25/2026
Violation issued (ECB, open)
Construction
01/31/2026
Violation issued (HPD, open)
B
01/31/2026
Violation issued (HPD, closed)
A
01/31/2026
Violation issued (HPD, open)
B
01/31/2026
Violation issued (HPD, open)
A
01/31/2026
Violation issued (HPD, open)
B
12/12/2025
Violation issued (HPD, open)
A
12/12/2025
Violation issued (HPD, open)
C
12/12/2025
Violation issued (HPD, open)
A
12/12/2025
Violation issued (HPD, open)
A
12/12/2025
Violation issued (HPD, open)
B
12/12/2025
Violation issued (HPD, open)
B
12/12/2025
Violation issued (HPD, open)
B
12/12/2025
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (HPD, open)
A
12/12/2025
Violation issued (HPD, open)
B
12/12/2025
Violation issued (HPD, open)
A
12/12/2025
Violation issued (HPD, open)
A
12/07/2025
Violation issued (HPD, open)
C
12/07/2025
Violation issued (HPD, open)
C
12/07/2025
Violation issued (HPD, open)
B
12/07/2025
Violation issued (HPD, open)
B
12/07/2025
Violation issued (HPD, open)
B
11/18/2025
Violation issued (HPD, open)
C
11/18/2025
Violation issued (HPD, open)
B
11/18/2025
Violation issued (HPD, open)
B
11/18/2025
Violation issued (HPD, open)
B
11/18/2025
Violation issued (HPD, open)
B
11/18/2025
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
11/15/2025
Violation issued (HPD, closed)
A
11/15/2025
Violation issued (HPD, open)
B
11/15/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, open)
C
09/19/2025
Permit issued — General Construction
X01158495-I1-GC
04/30/2025
Objection resolved — Addressed
04/25/2025
Objection raised — Scope
04/16/2025
Filed — Alteration
Addressing Violations 39127479M;39127482N;39127483P;39127485Z;39127480J. Remove non-load-bearing partitions & plumbing fixtures created in the cellar and show the installation of a chain link fence at the rear yard. PL filed under LAA #X01147277-I1.
X01158495-I1
02/21/2025
Violation issued (HPD, closed)
A
02/21/2025
Violation issued (HPD, closed)
C
02/21/2025
Violation issued (HPD, closed)
A
02/21/2025
Violation issued (HPD, closed)
C
02/21/2025
Violation issued (HPD, closed)
B
02/21/2025
Violation issued (HPD, closed)
A
02/21/2025
Violation issued (HPD, closed)
C
02/21/2025
Violation issued (HPD, closed)
A
02/07/2025
Violation issued (HPD, open)
C
02/07/2025
Violation issued (HPD, open)
C
02/07/2025
Violation issued (HPD, open)
C
Latest 60 of 71 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROSMIL MANAGEMENT, LLC1703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C209/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROSMIL TILE & PAINTING COGeneral Contractor303/21/2026
LINARES, LUISElectrical103/21/2026
DPH PLUMBING & HTG CORPPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292209/10/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offROSMIL TILE & PAINTING CO09/19/2025
BISBLISSUEDDPH PLUMBING & HTG CORP06/27/2019
BISPLISSUEDDPH PLUMBING & HTG CORP06/18/2019
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/22/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/20/2026Fire-Resistant Penetrations and JointsJose Santosspecial
07/22/2026Tenant Protection Plan ComplianceJose Santosspecial
01/07/2025Tenant Protection Plan ComplianceJose Santosspecial
12/19/2024Fire-Resistant Penetrations and JointsJose Santosspecial
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/15/2026X01434926-I1Request digital key ↗
08/19/2026X01158495-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
11/27/2019220658296Open ↗
11/26/2019220658296Open ↗
10/22/2018220658296Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
06/28/2019220658296Open ↗
06/19/2019220658296Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/07/2020220658296Open ↗
10/15/2018220658296Open ↗
10/15/2018220658296Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/15/2026X01434926-I1Open ↗
08/13/2026X01158495-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X01434926-I1Open ↗
08/24/2026X01158495-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/15/2018220658296Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/15/2018220658296Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/27/2019220658296Open ↗
11/26/2019220658296Open ↗
10/22/2018220658296Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/25/2019220658296Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/15/2018220658296Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/15/2026X01434926-I1Open ↗
08/13/2026X01158495-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2018220658296Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/07/2020220658296Open ↗
10/15/2018220658296Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/07/2020220658296Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/07/2020220658296Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/07/2020220658296Open ↗
10/15/2018220658296Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
01/07/2020220658296Open ↗
11/26/2019220658296Open ↗
▸BISADDITIONAL INFORMATION1
11/27/2019220658296Open ↗
▸BISEFILING COVER SHEET1
10/15/2018220658296Open ↗