← Back
Old law tenement
839 HUNTS POINT AVENUE
BRONX · BIN 2005952
💬 Discuss this project
1904Year Built
4Stories
C4Building Class
R6Zoning
10,560 sfGross Floor Area
8Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Old law tenement · Owner of record: NYC HOUSING AUTHORITY · 3,900 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Roof9p · 2 filings · 16 docs
Bulkhead1p · 1 filing · 12 docs
Floor 17p · 1 filing · 12 docs
Cellar9p · 1 filing · 12 docs
1 job · most recent 03/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/24/2026——Gas, Water/Sanitary
1 job · most recent 03/14/2023
FiledStatusContractorScope
03/14/2023Permit IssuedQ.Y. ELECTRIC, INC—
2 jobs · most recent 03/06/2025
Sidewalk Shed Fence
FiledStatusContractorScope
03/06/2025Permit IssuedZORIA HOUSING, LLCSidewalk Shed
03/24/2023Permit IssuedZORIA HOUSING, LLCFence
Building Lifecycle
All (61)Filed (8)Permit Issued (15)Signed Off (1)Violation (4)Objection (4)Special Inspection (29)
08/10/2026
Permit issued — Sidewalk Shed
X00848424-I1-SH
05/22/2026
Permit issued — Sidewalk Shed
X00848424-I1-SH
03/24/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01363442-S2
03/24/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01363442-I1
03/24/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01363442-S1
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/19/2026
Special inspection requirement — Chimneys and vents
03/19/2026
Special inspection requirement — Post-installed Anchors
03/17/2026
Permit issued — Construction Fence
X00848427-I1-FN
03/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/12/2026
Special inspection requirement — Shutoff dampers
03/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/12/2026
Special inspection requirement — Maintenance information
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
03/12/2026
Special inspection requirement — Heating Systems
03/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/11/2026
Special inspection requirement — Post-installed Anchors
03/06/2026
Special inspection requirement — Insulation placement and R values
03/06/2026
Special inspection requirement — Vestibules
03/06/2026
Special inspection requirement — Fenestration air leakage
02/25/2026
Permit issued — Sidewalk Shed
X00848424-I1-SH
02/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/25/2026
Special inspection requirement — Mechanical Systems
02/25/2026
Special inspection requirement — Final
02/23/2026
Special inspection requirement — Lighting in dwelling units
02/23/2026
Special inspection requirement — Lighting controls
02/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/23/2026
Special inspection requirement — Final
02/23/2026
Special inspection requirement — Interior lighting power
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/23/2026
Special inspection requirement — Exterior lighting power
07/08/2025
Signed off — Alteration
SH/NYCHA -HUNTS POINT Houses Bldg 05. filing on behalf of contractor in conjunction with DOB number X08016884. No change occupancy use or egress.
X00820803-I1
03/17/2025
Permit issued — Construction Fence
X00848427-I1-FN
03/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00848424-P1
03/05/2025
Permit issued — Sidewalk Shed
X00820803-I1-SH
03/05/2025
Permit issued — Sidewalk Shed
X00820803-I1-SH
02/28/2025
Permit issued — Sidewalk Shed
X00848424-I1-SH
04/16/2024
Permit issued — Sidewalk Shed
X00848424-I1-SH
03/22/2024
Permit issued — Construction Fence
X00848427-I1-FN
03/21/2024
Permit issued — Sidewalk Shed
X00848424-I1-SH
03/06/2024
Permit issued — Sidewalk Shed
X00820803-I1-SH
03/27/2023
Permit issued — Sidewalk Shed
X00848424-I1-SH
03/27/2023
Permit issued — Construction Fence
X00848427-I1-FN
03/24/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00848424-I1
03/24/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00848427-I1
03/01/2023
Permit issued — Sidewalk Shed
X00820803-I1-SH
02/14/2023
Filed — Alteration
SH/NYCHA -HUNTS POINT Houses Bldg 05. filing on behalf of contractor in conjunction with DOB number X08016884. No change occupancy use or egress.
X00820803-I1
11/30/2022
Objection raised — C/O of existing property requi
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Admin
11/30/2022
Objection resolved — Addressed
11/20/2022
Filed — Alteration
REPLACEMENT OF AN EXISTING ROOF SYSTEM ABOVE THE EXISTING ROOF DECK, ROOFTOP STRUCTURE RENOVATION, AND FACADE REPAIR WORK AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08016884-I1
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY408/28/2026
NYCHA2108/11/2026
NYC HOUSING AUTHORITY203/22/2026
HUNTS POINT DEVELOPMENT CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAVEN CONSTRUCTION SERVICGeneral Contractor1203/21/2026
ZORIA HOUSING, LLCGeneral Contractor908/11/2026
VIKRANT CONTRACTING & BUILDERGeneral Contractor407/08/2026
CHAO QIANG YUANElectrical103/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedZORIA HOUSING, LLC08/10/2026
DOB NOWSidewalk ShedPermit IssuedZORIA HOUSING, LLC05/22/2026
DOB NOWConstruction FencePermit IssuedZORIA HOUSING, LLC03/17/2026
DOB NOWSidewalk ShedPermit IssuedZORIA HOUSING, LLC02/25/2026
DOB NOWConstruction FencePermit IssuedZORIA HOUSING, LLC03/17/2025
DOB NOWSidewalk ShedSigned-offRAVEN CONSTRUCTION SERVIC03/05/2025
DOB NOWSidewalk ShedSigned-offRAVEN CONSTRUCTION SERVIC03/05/2025
DOB NOWSidewalk ShedPermit IssuedZORIA HOUSING, LLC02/28/2025
DOB NOWSidewalk ShedPermit IssuedVIKRANT CONTRACTING & BUI04/16/2024
DOB NOWConstruction FencePermit IssuedZORIA HOUSING, LLC03/22/2024
DOB NOWSidewalk ShedPermit IssuedVIKRANT CONTRACTING & BUI03/21/2024
DOB NOWSidewalk ShedSigned-offRAVEN CONSTRUCTION SERVIC03/06/2024
DOB NOWSidewalk ShedPermit IssuedVIKRANT CONTRACTING & BUI03/27/2023
DOB NOWConstruction FencePermit IssuedZORIA HOUSING, LLC03/27/2023
DOB NOWSidewalk ShedSigned-offRAVEN CONSTRUCTION SERVIC03/01/2023
BISOTISSUEDDREAMLAND CONSTRUCTION IN09/14/2013
BISEQISSUEDDREAMLAND CONSTRUCTION IN06/10/2013
BISEQISSUEDDREAMLAND CONSTRUCTION IN05/17/2012
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/19/2026Fire-Resistant Penetrations and Joints—special
03/19/2026Chimneys and vents—special
03/19/2026Post-installed Anchors—special
03/12/2026HVAC-R and service water piping design and insulation—energy_progress
03/12/2026Shutoff dampers—energy_progress
03/12/2026HVAC-R and service water heating system controls—energy_progress
03/12/2026Maintenance information—energy_progress
03/12/2026Energy Code Compliance Inspections—progress
03/12/2026Heating Systems—special
03/12/2026HVAC-R and service water heating equipment—energy_progress
03/11/2026Fire-Resistant Penetrations and Joints—special
03/11/2026Post-installed Anchors—special
03/06/2026Insulation placement and R values—energy_progress
03/06/2026Vestibules—energy_progress
03/06/2026Fenestration air leakage—energy_progress
02/25/2026Tenant Protection Plan Compliance—special
02/25/2026Tenant Protection Plan Compliance—special
02/25/2026Mechanical Systems—special
02/25/2026Final—progress
02/23/2026Lighting in dwelling units—energy_progress
02/23/2026Lighting controls—energy_progress
02/23/2026Tenant Protection Plan Compliance—special
02/23/2026Final—progress
02/23/2026Interior lighting power—energy_progress
02/23/2026Fire-Resistance Rated Construction—progress
Latest 25 of 29.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026X00820803-I1Request digital key ↗
08/23/2026X00848427-I1Request digital key ↗
08/20/2026X00848424-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
09/14/2013220332478Open ↗
06/11/2013220202527Open ↗
05/18/2012220202527Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
08/31/2013220332478Open ↗
05/11/2012220202527Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026X08016884-I1Open ↗
08/23/2026X00820803-I1Open ↗
08/23/2026X00848427-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/04/2015220332478Open ↗
08/31/2013220332478Open ↗
05/11/2012220202527Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/11/2012220202527Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/11/2012220202527Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026X01363442-S2Open ↗
08/17/2026X01363442-S1Open ↗
08/17/2026X01363442-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/31/2013220332478Open ↗
▸Energy Compliance1
▸BISAS-BUILT ENERGY ANALYSIS1
04/04/2015220332478Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/20/2026X00848424-I1Open ↗
08/13/2026X00848427-I1Open ↗
08/13/2026X01363442-S1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/04/2015220332478Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/11/2012220202527Open ↗
▸BISSHED LETTER1
06/11/2013220202527Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/04/2015220332478Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026X08016884-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/04/2015220332478Open ↗
08/31/2013220332478Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/31/2013220332478Open ↗
05/11/2012220202527Open ↗