← Back
Three families
741 WHITTIER STREET
BRONX · BIN 2006570
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
M1-2Zoning
3,510 sfGross Floor Area
3Units
44 Open Violations 35 unresolved · 9 paperwork only ▸FDNY Report ↗
Three families · 2,500 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
2 jobs · most recent 04/07/2025
Fence
FiledStatusContractorScope
04/07/2025Signed-offSTATEWIDE DEMOLITION CORPFence
03/24/2025Permit IssuedINNOVATIVE CONSTRUCTION &Fence
Building Lifecycle
All (78)Filed (5)Permit Issued (6)Signed Off (3)Violation (60)Special Inspection (4)
03/09/2026
Violation issued (ECB, open)
Construction
02/24/2026
Violation issued (ECB, open)
Construction
01/28/2026
Permit issued — Construction Fence
X01189993-I1-FN
06/18/2025
Signed off — Alteration
ERECT 8' PERMANENT CHAIN LINK FENCE, APPROX 120' LONG AT EXPOSURES 1, 3 & 4, TO ENCLOSE SITE AND MEET EXISTING CHAIN LINK FENCES.
X01236085-I1
06/17/2025
Permit issued — General Construction
X01236085-I1-GC
06/11/2025
Filed — Alteration
ERECT 8' PERMANENT CHAIN LINK FENCE, APPROX 120' LONG AT EXPOSURES 1, 3 & 4, TO ENCLOSE SITE AND MEET EXISTING CHAIN LINK FENCES.
X01236085-I1
06/04/2025
Special inspection requirement — Final
Chris Sanders
05/21/2025
Signed off — Alteration
RETAINING WALLS INSTALLATION IN CONJUNCTION WITH DEMOLITION AT 741 GAR WHITTIER STREET, BRONX N.Y. BLOCK: 2763 LOT: 352 BIN #2103972
X01203266-I1
05/20/2025
Permit issued — General Construction
X01203266-I1-GC
05/17/2025
Filed — Alteration
RETAINING WALLS INSTALLATION IN CONJUNCTION WITH DEMOLITION AT 741 GAR WHITTIER STREET, BRONX N.Y. BLOCK: 2763 LOT: 352 BIN #2103972
X01203266-I1
05/08/2025
Signed off — Full Demolition
fence to protect site, during IED demolition
X01191078-I1
05/02/2025
Permit issued — Full Demolition
X01191078-I1-FD
04/23/2025
Permit issued — Construction Fence
X01191078-S1-FN
04/07/2025
Filed — Full Demolition
fence to protect site, during IED demolition
X01191078-I1
04/07/2025
Filed — Full Demolition
fence to protect site, during IED demolition
X01191078-S1
03/31/2025
Special inspection requirement — Final
Chris Sanders
03/25/2025
Permit issued — Construction Fence
X01189993-I1-FN
03/24/2025
Filed — Alteration
INSTALLATION OF THE TEMPORARY PLYWOOD FENCE AT AT 741 WHITTIER STREET, BRONX, NY 10474 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01189993-I1
03/07/2025
Special inspection requirement — Demolition
Feng Li
03/07/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Feng Li
02/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/05/2023
Violation issued (ECB, open)
Construction
03/30/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2022
Violation issued (ECB, open)
Construction
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/04/2022
Violation issued (ECB, open)
Construction
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2021
Violation issued (ECB, closed)
Construction
09/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2021
Violation issued (ECB, closed)
Construction
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/2021
Violation issued (ECB, closed)
Construction
05/21/2021
Violation issued (ECB, closed)
Construction
05/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2021
Violation issued (ECB, closed)
Construction
03/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2021
Violation issued (ECB, closed)
Construction
12/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/07/2020
Violation issued (ECB, closed)
Construction
09/25/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2020
Violation issued (ECB, closed)
Construction
03/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/05/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/2020
Violation issued (ECB, closed)
Construction
12/11/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2019
Violation issued (ECB, closed)
Construction
10/29/2019
Violation issued (ECB, closed)
Construction
10/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/14/2019
Violation issued (ECB, closed)
Construction
07/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/13/2019
Violation issued (ECB, closed)
Construction
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 78 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION DEVELOPMENT2104/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTH BAY ENGINEERING PLLC406/11/2025
AK CONSULTING SERVICES, INC103/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.203/21/2026
EXPEDITE DEM403/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATEWIDE DEMOLITION CORP.General Contractor803/21/2026
INNOVATIVE CONSTRUCTION &General Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLUE LIGHT CONSULTING &AM9394104/07/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedINNOVATIVE CONSTRUCTION &01/28/2026
DOB NOWGeneral ConstructionSigned-offSTATEWIDE DEMOLITION CORP.06/17/2025
DOB NOWGeneral ConstructionSigned-offSTATEWIDE DEMOLITION CORP.05/20/2025
DOB NOWFull DemolitionSigned-offSTATEWIDE DEMOLITION CORP.05/02/2025
DOB NOWConstruction FenceSigned-offSTATEWIDE DEMOLITION CORP.04/23/2025
DOB NOWConstruction FencePermit IssuedINNOVATIVE CONSTRUCTION &03/25/2025
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/04/2025FinalChris Sandersprogress
03/31/2025FinalChris Sandersprogress
03/07/2025DemolitionFeng Lispecial
03/07/2025Structural Stability – Alterations of existing BuildingsFeng Lispecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026X01189993-I1Request digital key ↗
08/19/2026X01191078-S1Request digital key ↗
08/19/2026X01191078-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026X01189993-I1Open ↗
08/19/2026X01191078-S1Open ↗
08/19/2026X01236085-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026X01203266-I1Open ↗
08/29/2026X01236085-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X01191078-I1Open ↗
08/26/2026X01191078-I1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWGas Cut-Off1
08/13/2026X01191078-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01191078-I1Open ↗