← Back
Other miscellaneous
327 BRYANT AVENUE
BRONX · BIN 2006978
💬 Discuss this project
1910Year Built
1.5Stories
Z9Building Class
M3-1Zoning
2,125 sfGross Floor Area
1Units
Other miscellaneous · 15,000 sf lot · 0.14 FAR built · Flood zone X500
Locations of Work
ArchitectureFire Protection
Cellar1p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DORIC CONSULTANTS PC210/21/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947210/21/2020
Building Lifecycle
All (16)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (12)
01/14/2021
Signed off — Alteration
INSTALLATION OF NEW OIL BOILER
X00290918-I1
10/23/2020
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Gregory Perotto
10/23/2020
Special inspection requirement — Heating Systems
Gregory Perotto
10/23/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
10/23/2020
Special inspection requirement — HVAC and service water heating equipment
Sokwon Im
10/23/2020
Special inspection requirement — HVAC and service water heating system controls
Sokwon Im
10/23/2020
Special inspection requirement — Maintenance information
Sokwon Im
10/21/2020
Filed — Alteration
INSTALLATION OF NEW OIL BOILER
X00290918-P2
10/07/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
10/07/2020
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Gregory Perotto
10/07/2020
Special inspection requirement — Heating Systems
Gregory Perotto
10/07/2020
Special inspection requirement — Maintenance information
Sokwon Im
10/07/2020
Special inspection requirement — HVAC and service water heating system controls
Sokwon Im
10/07/2020
Special inspection requirement — HVAC and service water heating equipment
Sokwon Im
01/30/2020
Permit issued — Boiler Equipment
X00290918-I1-BE
01/16/2020
Filed — Alteration
INSTALLATION OF NEW OIL BOILER
X00290918-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offQUALITY HEATING DESIGN IN01/30/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/23/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Perottospecial
10/23/2020Heating SystemsGregory Perottospecial
10/23/2020Fire-Resistant Penetrations and JointsGregory Perottospecial
10/23/2020HVAC and service water heating equipment Sokwon Imenergy_progress
10/23/2020HVAC and service water heating system controls Sokwon Imenergy_progress
10/23/2020Maintenance informationSokwon Imenergy_progress
10/07/2020Fire-Resistant Penetrations and JointsGregory Perottospecial
10/07/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Perottospecial
10/07/2020Heating SystemsGregory Perottospecial
10/07/2020Maintenance informationSokwon Imenergy_progress
10/07/2020HVAC and service water heating system controls Sokwon Imenergy_progress
10/07/2020HVAC and service water heating equipment Sokwon Imenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/26/2026X00290918-I1Request digital key ↗
08/15/2026X00290918-P2Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X00290918-I1Open ↗
09/23/2026X00290918-I1Open ↗
09/23/2026X00290918-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026X00290918-I1Open ↗
09/23/2026X00290918-I1Open ↗
09/23/2026X00290918-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026X00290918-I1Open ↗
08/13/2026X00290918-P2Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026X00290918-I1Open ↗
08/13/2026X00290918-P2Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00290918-I1Open ↗