← Back
Three families
1377 CLAY AVENUE
BRONX · BIN 2007119
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R7-1Zoning
2,860 sfGross Floor Area
3Units
19 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 1377 CLAY AVENUE LLC · 1,601 sf lot · 1.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 3 docs
Floor 22p · 1 filing · 11 docs
Floor 1
Cellar1p · 1 filing · 3 docs
Basement1p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1377 CLAY AVENUE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUNG HO SHIN ARCHITECT, PC410/09/2023
BUILDING VIOLATION LLC104/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SELF EMPLOYED103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FT'S PRECISE HEATING &General Contractor107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008210/09/2023
SUNG HO SHIN ARCHITECT2997410/09/2023
Building Lifecycle
All (88)Filed (5)Permit Issued (2)Signed Off (2)Violation (32)Inspection (3)Objection (14)Special Inspection (30)
02/12/2024
Signed off — Alteration
Relocation, direct replacement, and removal of bathroom and kitchenette plumbing fixtures. New Floor Drain. New electric hot water heaters. Remove gas meters. Remove gas hot water heater, boiler, stoves.
X00731573-I1
02/09/2024
Signed off — Alteration
Interior renovation to restore as 2family as per CO#142/39 including new lighting and split system. Application herewith also remove ECB violations:35248264K,35248265M, and 35242169P.No change in use, occupancy, or egress is involved under this applicatio
X00730458-I1
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
10/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GLEN LANGER
10/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
SUNG HO SHIN
10/11/2023
Special inspection requirement — Final
SUNG HO SHIN
10/11/2023
Special inspection requirement — Mechanical Systems
SUNG HO SHIN
10/11/2023
Special inspection requirement — Energy Code Compliance Inspections
SUNG HO SHIN
10/11/2023
Special inspection requirement — Interior lighting power
SUNG HO SHIN
10/11/2023
Special inspection requirement — Maintenance information
SUNG HO SHIN
10/11/2023
Special inspection requirement — Fenestration air leakage
SUNG HO SHIN
10/11/2023
Special inspection requirement — Fenestration areas
SUNG HO SHIN
10/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SUNG HO SHIN
10/11/2023
Special inspection requirement — Air barrier - visual inspection
SUNG HO SHIN
10/09/2023
Filed — Alteration
Interior renovation to restore as 2family as per CO#142/39 including new lighting and split system. Application herewith also remove ECB violations:35248264K,35248265M, and 35242169P.No change in use, occupancy, or egress is involved under this applicatio
X00730458-P1
10/02/2023
Special inspection requirement — Final
SUNG HO SHIN
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
10/02/2023
Special inspection requirement — Mechanical Systems
SUNG HO SHIN
10/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GLEN LANGER
10/02/2023
Special inspection requirement — Energy Code Compliance Inspections
SUNG HO SHIN
10/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
SUNG HO SHIN
10/02/2023
Special inspection requirement — Fenestration air leakage
SUNG HO SHIN
10/02/2023
Special inspection requirement — Interior lighting power
SUNG HO SHIN
10/02/2023
Special inspection requirement — Fenestration areas
SUNG HO SHIN
10/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SUNG HO SHIN
10/02/2023
Special inspection requirement — Air barrier - visual inspection
SUNG HO SHIN
10/02/2023
Special inspection requirement — Maintenance information
SUNG HO SHIN
08/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2023
Filed — Alteration
Relocation, direct replacement, and removal of bathroom and kitchenette plumbing fixtures. New Floor Drain. New electric hot water heaters. Remove gas meters. Remove gas hot water heater, boiler, stoves.
X00731573-P1
06/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
SUNG HO SHIN
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
06/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNG HO SHIN
06/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
SUNG HO SHIN
05/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
05/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
03/29/2023
Permit issued — Plumbing
X00731573-I1-PL
12/29/2022
Permit issued — General Construction
X00730458-I1-GC-CX
11/29/2022
Filed — Alteration
Relocation, direct replacement, and removal of bathroom and kitchenette plumbing fixtures. New Floor Drain. New electric hot water heaters. Remove gas meters. Remove gas hot water heater, boiler, stoves.
X00731573-I1
11/17/2022
Objection resolved — Addressed
09/01/2022
Objection resolved — Addressed
08/03/2022
Objection resolved — Addressed
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection resolved — Addressed
05/18/2022
Objection raised — Admin
05/18/2022
Objection raised — Other
05/18/2022
Objection raised — Zoning
05/18/2022
Objection raised — Scope
05/18/2022
Objection raised — Inspections
05/18/2022
Objection raised — Other
05/18/2022
Objection raised — Energy
05/09/2022
Filed — Alteration
Interior renovation to restore as 2family as per CO#142/39 including new lighting and split system. Application herewith also remove ECB violations:35248264K,35248265M, and 35242169P.No change in use, occupancy, or egress is involved under this applicatio
X00730458-I1
04/13/2021
Filed — Alteration
X00480942-I1
02/21/2019
Violation issued (HPD, open)
C
02/21/2019
Violation issued (HPD, closed)
A
02/21/2019
Violation issued (HPD, closed)
B
02/21/2019
Violation issued (HPD, closed)
B
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT03/29/2023
DOB NOWGeneral ConstructionSigned-offFT'S PRECISE HEATING &12/29/2022
2 projects · most recent 04/01/2024
General Wiring
FiledStatusContractorScope
04/01/2024CompleteV. VASS ELECTRIC CORPGeneral Wiring
03/07/2023Permit IssuedGMJ ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
10/11/2023Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
10/11/2023Structural Stability – Alterations of existing buildingsGLEN LANGERspecial
10/11/2023Fire-Resistance Rated ConstructionSUNG HO SHINprogress
10/11/2023FinalSUNG HO SHINprogress
10/11/2023Mechanical SystemsSUNG HO SHINspecial
10/11/2023Energy Code Compliance InspectionsSUNG HO SHINprogress
10/11/2023Interior lighting powerSUNG HO SHINenergy_progress
10/11/2023Maintenance informationSUNG HO SHINenergy_progress
10/11/2023Fenestration air leakageSUNG HO SHINenergy_progress
10/11/2023Fenestration areasSUNG HO SHINenergy_progress
10/11/2023Fenestration and door U-factor and product ratingsSUNG HO SHINenergy_progress
10/11/2023Air barrier - visual inspectionSUNG HO SHINenergy_progress
10/02/2023FinalSUNG HO SHINprogress
10/02/2023Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
10/02/2023Mechanical SystemsSUNG HO SHINspecial
10/02/2023Structural Stability – Alterations of existing buildingsGLEN LANGERspecial
10/02/2023Energy Code Compliance InspectionsSUNG HO SHINprogress
10/02/2023Fire-Resistance Rated ConstructionSUNG HO SHINprogress
10/02/2023Fenestration air leakageSUNG HO SHINenergy_progress
10/02/2023Interior lighting powerSUNG HO SHINenergy_progress
10/02/2023Fenestration areasSUNG HO SHINenergy_progress
10/02/2023Fenestration and door U-factor and product ratingsSUNG HO SHINenergy_progress
10/02/2023Air barrier - visual inspectionSUNG HO SHINenergy_progress
10/02/2023Maintenance informationSUNG HO SHINenergy_progress
06/22/2023HVAC-R and service water heating equipmentSUNG HO SHINenergy_progress
Latest 25 of 32.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026X00480942-I1Request digital key ↗
08/24/2026X00730458-P1Request digital key ↗
08/23/2026X00731573-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/08/2018220630208Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026X00730458-P1Open ↗
09/02/2026X00730458-P1Open ↗
09/02/2026X00730458-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026X00730458-P1Open ↗
09/02/2026X00730458-P1Open ↗
09/02/2026X00730458-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026X00480942-I1Open ↗
08/24/2026X00730458-P1Open ↗
08/24/2026X00730458-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/08/2018220630208Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026X00480942-I1Open ↗
08/24/2026X00730458-P1Open ↗
08/23/2026X00731573-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/08/2018220630208Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00730458-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/08/2018220630208Open ↗