1910Year Built
2Stories
B1Building Class
R8Zoning
2,720 sfGross Floor Area
2Units
28 Open Violations 25 unresolved · 3 paperwork only ▸
Two family brick · 2,280 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MIRIAM DEVELOPMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AYALA ENGINEERING PC210/02/2025
FL&M ENGINEERING DESIGN &INSPECTION109/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKLEDGE SCAFFOLD CORPGeneral Contractor107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AYALA ENGINEERING P.C.9207210/02/2025
Building Lifecycle
All (46)Filed (3)Permit Issued (3)Signed Off (1)Violation (34)Inspection (5)
05/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/20/2026
Signed off — Alteration
MASONRY FACADE RESTORATION. REPLACE DETERIORATED WINDOW/DOOR LINTELS.POINT DETERIORATED MORTAR AND REPLACE CRACKED BRICKS.NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01283034-I1
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/09/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/07/2026
Violation issued (ECB, open)
Construction
12/05/2025
Permit issued — Plumbing
X01277513-I1-PL
12/01/2025
Permit issued — Sidewalk Shed
X01265771-I1-SH
11/26/2025
Permit issued — General Construction
X01283034-I1-GC
11/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/02/2025
Filed — Alteration
MASONRY FACADE RESTORATION. REPLACE DETERIORATED WINDOW/DOOR LINTELS.POINT DETERIORATED MORTAR AND REPLACE CRACKED BRICKS.NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01283034-I1
09/30/2025
Filed — Alteration
JOB FILED TO CAP AND REMOVE PLUMBING FIXTURES AS PER PLAN TO DISMISS ECB VIOLATION#34253032L. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01277513-I1
09/04/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01265771-I1
07/30/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/30/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/22/2024
Violation issued (HPD, closed)
I
01/19/2024
Violation issued (HPD, open)
B
01/19/2024
Violation issued (HPD, open)
B
01/19/2024
Violation issued (HPD, open)
B
01/19/2024
Violation issued (HPD, open)
C
01/19/2024
Violation issued (HPD, closed)
C
01/19/2024
Violation issued (HPD, open)
B
01/19/2024
Violation issued (HPD, open)
A
01/19/2024
Violation issued (HPD, open)
A
01/19/2024
Violation issued (HPD, open)
B
01/19/2024
Violation issued (HPD, open)
B
01/19/2024
Violation issued (HPD, open)
A
01/19/2024
Violation issued (HPD, open)
B
03/05/2018
Violation issued (HPD, closed)
I
03/02/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, closed)
C
03/02/2018
Violation issued (HPD, closed)
C
03/02/2018
Violation issued (HPD, closed)
C
03/02/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, open)
A
03/02/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, open)
A
03/02/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, open)
B
03/02/2018
Violation issued (HPD, open)
B
01/10/2001
Violation issued (ECB, open)
Plumbing
05/08/1997
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP12/05/2025
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP12/01/2025
DOB NOWGeneral ConstructionSigned-offNot Applicable11/26/2025
1 project · most recent 09/30/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/30/2025Permit IssuedSIGNORE & SONS PLBG CORPGas, Water/Sanitary
1 project · most recent 09/04/2025
Sidewalk Shed
FiledStatusContractorScope
09/04/2025Permit IssuedROCKLEDGE SCAFFOLD CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/09/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026X01265771-I1Request digital key ↗
08/18/2026X01277513-I1Request digital key ↗
08/18/2026X01283034-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026X01277513-I1Open ↗
08/18/2026X01283034-I1Open ↗
08/13/2026X01265771-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026X01277513-I1Open ↗
08/18/2026X01283034-I1Open ↗