← Back
Three families
1521 PLIMPTON AVENUE
BRONX · BIN 2008789
💬 Discuss this project
1915Year Built
3Stories
C0Building Class
R7-1Zoning
3,780 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Three families · 2,075 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 313p · 1 filing · 12 docs
Floor 213p · 1 filing · 12 docs
Floor 113p · 1 filing · 12 docs
Cellar13p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C310/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOVAL PLBG & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292310/17/2025
Building Lifecycle
All (46)Filed (3)Permit Issued (2)Violation (31)Inspection (5)Special Inspection (5)
04/30/2026
Violation issued (HPD, open)
A
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
10/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
10/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
10/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
10/17/2025
Filed — Alteration
REMOVING AN OIL BOILER AT CELLAR AND INSTALLING 1 GAS LOW-PRESSURE STEAM BOILER IN ITS PLACE, AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
X00703984-P2
10/10/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
10/01/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/26/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/11/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
07/10/2025
Filed — Alteration
REMOVING AN OIL BOILER AT CELLAR AND INSTALLING 1 GAS LOW-PRESSURE STEAM BOILER IN ITS PLACE, AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
X00703984-P1
07/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2025
Violation issued (HPD, closed)
A
05/07/2025
Permit issued — Plumbing
X00703984-I1-PL
11/22/2024
Violation issued (HPD, closed)
I
04/03/2024
Violation issued (HPD, closed)
A
03/17/2023
Violation issued (HPD, closed)
A
11/03/2022
Permit issued — Plumbing
X00703984-I1-PL
04/22/2022
Filed — Alteration
REMOVING AN OIL BOILER AT CELLAR AND INSTALLING 1 GAS LOW-PRESSURE STEAM BOILER IN ITS PLACE, AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
X00703984-I1
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
10/28/2019
Violation issued (HPD, closed)
I
04/13/2018
Violation issued (HPD, closed)
C
02/07/2018
Violation issued (HPD, closed)
B
02/07/2018
Violation issued (HPD, closed)
B
02/07/2018
Violation issued (HPD, closed)
C
02/07/2018
Violation issued (HPD, closed)
C
02/07/2018
Violation issued (HPD, closed)
A
02/07/2018
Violation issued (HPD, closed)
A
02/07/2018
Violation issued (HPD, closed)
A
02/07/2018
Violation issued (HPD, open)
B
02/07/2018
Violation issued (HPD, closed)
A
01/13/2018
Violation issued (HPD, closed)
A
01/13/2018
Violation issued (HPD, closed)
A
01/13/2018
Violation issued (HPD, closed)
A
01/13/2018
Violation issued (HPD, closed)
A
01/13/2018
Violation issued (HPD, closed)
A
11/14/2017
Violation issued (HPD, closed)
I
10/31/2016
Violation issued (HPD, closed)
I
10/05/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
01/17/2015
Violation issued (HPD, closed)
B
02/24/2011
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP05/07/2025
DOB NOWPlumbingPermit IssuedDOVAL PLBG & HTG CORP11/03/2022
1 project · most recent 10/17/2025
Gas
FiledStatusContractorScope
10/17/2025Permit IssuedDOVAL PLBG & HTG CORPGas
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/10/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
10/01/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/26/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/11/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/27/2025Fire-Resistant Penetrations and JointsJose Santosspecial
10/27/2025Energy Code Compliance InspectionsJose Santosprogress
10/27/2025HVAC-R and service water heating system controlsJose Santosenergy_progress
10/27/2025HVAC-R and service water piping design and insulationJose Santosenergy_progress
10/27/2025HVAC-R and service water heating equipmentJose Santosenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026X00703984-P1Request digital key ↗
08/19/2026X00703984-I1Request digital key ↗
08/19/2026X00703984-P2Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026X00703984-P1Open ↗
08/19/2026X00703984-I1Open ↗
08/19/2026X00703984-P2Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026X00703984-I1Open ↗
08/30/2026X00703984-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026X00703984-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026X00703984-P1Open ↗
08/19/2026X00703984-P2Open ↗
08/19/2026X00703984-I1Open ↗