← Back
Over six families without stores
Casella Houses I
857 CROTONA PARK NORTH · BIN 2010093
💬 Discuss this project
1914Year Built
5Stories
C1Building Class
R7-1Zoning
20,425 sfGross Floor Area
20Units
Rent Stabilized61 Open Violations 60 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: CASELLA HOUSES HDFC · 4,675 sf lot · 4.37 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof1p · 1 filing · 20 docs
Bulkhead3p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASELLA HOUSES HDFC1907/08/2026
AQUINAS HOUSING203/21/2026
CARROLL BURKE DEVELOPMENT CORP.103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OCV ARCHITECTS704/05/2023
JOEL PHAGOO P.E. PLLC105/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCV ARCHITECTS703/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOTIAS CONSTRUCTION INCGeneral Contractor507/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor403/21/2026
J-J PLUMBING CORPPlumbing307/08/2026
MARIO CASTROElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CERTIFIED TESTING LABORAT396404/05/2023
Building Lifecycle
All (135)Filed (8)Permit Issued (7)Signed Off (3)Violation (60)Inspection (4)Objection (38)Special Inspection (15)
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/27/2025
Violation issued (HPD, closed)
B
07/24/2025
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH BE APPLICATION #X00709163
X00739568-I1
04/24/2025
Violation issued (HPD, closed)
B
04/24/2025
Violation issued (HPD, open)
B
04/24/2025
Violation issued (HPD, open)
A
04/24/2025
Violation issued (HPD, closed)
B
04/24/2025
Violation issued (HPD, closed)
B
02/18/2025
Violation issued (HPD, open)
B
02/18/2025
Violation issued (HPD, open)
B
02/18/2025
Violation issued (HPD, open)
B
02/18/2025
Violation issued (HPD, closed)
C
02/18/2025
Violation issued (HPD, open)
B
02/18/2025
Violation issued (HPD, open)
B
02/18/2025
Violation issued (HPD, open)
B
07/22/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXIST. BLDG, NEW FINISHES. ROOF/BULKHEAD/PARAPET WORK. REPLACEMENT OF WINDOWS/DOORS, KITCHEN & BATH FIXTURES IN EXIST. LOCATIONS. NEW LED LIGHTING. MINOR MASONRY FACADE REPAIR. NO CHANGE TO USE/EGRESS/OCCUPANCY.
X00489659-I1
11/08/2023
Violation issued (HPD, closed)
C
11/08/2023
Violation issued (ECB, closed)
Construction
11/08/2023
Violation issued (HPD, closed)
C
11/08/2023
Violation issued (HPD, closed)
C
09/15/2023
Violation issued (HPD, open)
A
09/15/2023
Violation issued (HPD, open)
B
08/30/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00737994-I1
06/20/2023
Permit issued — Sidewalk Shed
X00737994-I1-SH
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/10/2023
Violation issued (HPD, closed)
A
05/10/2023
Violation issued (HPD, closed)
B
05/10/2023
Violation issued (HPD, open)
C
05/10/2023
Violation issued (HPD, closed)
B
05/10/2023
Violation issued (HPD, open)
B
05/10/2023
Violation issued (HPD, open)
B
04/20/2023
Violation issued (HPD, open)
C
04/20/2023
Violation issued (HPD, open)
C
04/20/2023
Violation issued (HPD, open)
C
04/20/2023
Violation issued (HPD, open)
C
04/20/2023
Violation issued (HPD, open)
C
04/06/2023
Violation issued (HPD, closed)
B
04/06/2023
Violation issued (HPD, closed)
B
04/06/2023
Violation issued (HPD, closed)
B
04/06/2023
Violation issued (HPD, closed)
B
04/06/2023
Violation issued (HPD, open)
C
04/06/2023
Violation issued (HPD, closed)
B
04/06/2023
Violation issued (HPD, open)
C
04/06/2023
Violation issued (HPD, closed)
B
04/05/2023
Filed — Alteration
INTERIOR RENOVATION OF EXIST. BLDG, NEW FINISHES. ROOF/BULKHEAD/PARAPET WORK. REPLACEMENT OF WINDOWS/DOORS, KITCHEN & BATH FIXTURES IN EXIST. LOCATIONS. NEW LED LIGHTING. MINOR MASONRY FACADE REPAIR. NO CHANGE TO USE/EGRESS/OCCUPANCY.
X00489659-P1
04/05/2023
Violation issued (HPD, open)
A
04/05/2023
Violation issued (HPD, closed)
B
04/05/2023
Violation issued (HPD, open)
A
04/05/2023
Violation issued (HPD, open)
A
04/05/2023
Special inspection requirement — Exterior lighting power
KIRT DOBBINS
04/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KIRT DOBBINS
04/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KIRT DOBBINS
04/05/2023
Special inspection requirement — Energy Code Compliance Inspections
KIRT DOBBINS
04/05/2023
Special inspection requirement — Final
KIRT DOBBINS
04/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
KIRT DOBBINS
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY06/20/2023
DOB NOWGeneral ConstructionSigned-offNOTIAS CONSTRUCTION INC12/22/2022
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP09/26/2022
DOB NOWBoiler EquipmentSigned-offJ-J PLUMBING CORP09/20/2022
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY05/24/2022
DOB NOWGeneral ConstructionSigned-offNOTIAS CONSTRUCTION INC01/12/2022
DOB NOWGeneral ConstructionSigned-offNOTIAS CONSTRUCTION INC11/10/2021
BISOTISSUEDACCORD POWER INC09/28/2023
4 projects · most recent 10/08/2023
General Wiring
FiledStatusContractorScope
10/08/2023CompletePOWER SURGE ELECTRIC, INC—
06/22/2022Permit IssuedQUEUE ELEC'L CONTRS, INCGeneral Wiring
05/16/2022CompleteNASH ELECTRIC SERVICES IN—
02/02/2022Permit IssuedMONTE ELECTRIC CO.—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/05/2023Exterior lighting powerKIRT DOBBINSenergy_progress
04/05/2023Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
04/05/2023Structural Stability – Alterations of existing buildingsKIRT DOBBINSspecial
04/05/2023Energy Code Compliance InspectionsKIRT DOBBINSprogress
04/05/2023FinalKIRT DOBBINSprogress
04/05/2023Fire-Resistance Rated ConstructionKIRT DOBBINSprogress
04/05/2023Fenestration areasKIRT DOBBINSenergy_progress
04/05/2023Lighting controlsKIRT DOBBINSenergy_progress
04/05/2023Fenestration air leakageKIRT DOBBINSenergy_progress
04/05/2023Air barrier - visual inspectionKIRT DOBBINSenergy_progress
04/05/2023Lighting in dwelling unitsKIRT DOBBINSenergy_progress
04/05/2023Interior lighting powerKIRT DOBBINSenergy_progress
04/05/2023Fenestration and door U-factor and product ratingsKIRT DOBBINSenergy_progress
10/20/2022Heating SystemsKIRT DOBBINSspecial
10/18/2022Heating SystemsKIRT DOBBINSspecial
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026X00489659-P1Request digital key ↗
08/24/2026X00739568-I1Request digital key ↗
08/24/2026X00737994-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
07/13/2023240349921Open ↗
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
09/28/2023240349921Open ↗
▸BISWORK PERMIT APPLICATION1
09/28/2023240349921Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026X00489659-P1Open ↗
09/02/2026X00489659-P1Open ↗
09/02/2026X00489659-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026X00489659-I1Open ↗
08/24/2026X00739568-I1Open ↗
08/24/2026X00739568-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/11/2026X00709163-I1Open ↗
09/02/2026X00489659-P1Open ↗
09/02/2026X00709163-P2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/13/2023240349921Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
08/30/2023240349921Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026X00739568-I1Open ↗
08/23/2026X00709163-P2Open ↗
08/23/2026X00709163-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/13/2023240349921Open ↗
▸Energy Compliance6
▸BISAS-BUILT ENERGY ANALYSIS2
01/13/2025240349921Open ↗
01/13/2025240349921Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/13/2025240349921Open ↗
07/13/2023240349921Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
01/14/2025240349921Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00489659-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/13/2025240349921Open ↗
07/13/2023240349921Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/24/2026X00739568-I1Open ↗
08/15/2026X00489659-I1Open ↗
08/14/2026X00739568-P1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/14/2025240349921Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/14/2025240349921Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/13/2025240349921Open ↗
01/13/2025240349921Open ↗
07/13/2023240349921Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
07/13/2023240349921Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/13/2023240349921Open ↗