← Back
Predominantly retail with other uses
2040 WEBSTER AVENUE
BRONX · BIN 2011115
💬 Discuss this project
1931Year Built
2.5Stories
K4Building Class
C8-3Zoning
4,925 sfGross Floor Area
5Units
Rent Stabilized8 Open Violations ▸
Predominantly retail with other uses · Owner of record: MARCELO#1 LLC · 4,562 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 9 docs
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARCELO#1303/22/2026
MASTERMIND103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C202/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOLNESS, GEORGEElectrical203/21/2026
TRANSCANADAElectrical203/21/2026
GEORGE HOLNESSElectrical103/21/2026
OLIVER CHRISTOPHERElectrical103/21/2026
OMD ELECTRICAL CORPElectrical103/22/2026
GEORGE HOLNESSGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292202/22/2023
Building Lifecycle
All (82)Filed (2)Violation (60)Objection (6)Special Inspection (14)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
04/03/2024
Violation issued (HPD, closed)
A
03/06/2024
Violation issued (HPD, open)
C
03/06/2024
Violation issued (HPD, closed)
B
03/03/2024
Violation issued (HPD, closed)
B
03/03/2024
Violation issued (HPD, open)
C
03/03/2024
Violation issued (HPD, open)
C
03/03/2024
Violation issued (HPD, closed)
B
03/03/2024
Violation issued (HPD, closed)
A
03/03/2024
Violation issued (HPD, closed)
B
01/31/2024
Violation issued (HPD, open)
B
11/16/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
03/14/2023
Objection resolved — Addressed
02/27/2023
Objection raised — Structural
02/27/2023
Objection raised — Other
02/27/2023
Objection raised — Scope
02/27/2023
Objection raised — Admin
02/22/2023
Filed — Alteration
PROPOSED MINOR INTERIOR PLUMBING WORK AND NEW COOKING EQUIPMENT AT COMMERCIAL SPACE TO BE USED AS A TAKE-OUT RESTAURANT AS PER PLANS SUBMITTED HEREWITH.
X00810984-S1
01/13/2023
Objection raised — Fire_Protection
01/11/2023
Filed — Alteration
PROPOSED MINOR INTERIOR PLUMBING WORK AND NEW COOKING EQUIPMENT AT COMMERCIAL SPACE TO BE USED AS A TAKE-OUT RESTAURANT AS PER PLANS SUBMITTED HEREWITH.
X00810984-I1
01/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
01/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
01/11/2023
Special inspection requirement — Structural Steel - Details
Jose Santos
01/11/2023
Special inspection requirement — Final
Juan Ramos
01/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
01/11/2023
Special inspection requirement — Air barrier - visual inspection
Jose Santos
01/11/2023
Special inspection requirement — Fenestration areas
Jose Santos
01/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Santos
01/11/2023
Special inspection requirement — Interior lighting power
Jose Santos
01/11/2023
Special inspection requirement — Insulation placement and R values
Jose Santos
01/11/2023
Special inspection requirement — Lighting controls
Jose Santos
01/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
01/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
01/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
02/18/2022
Violation issued (HPD, closed)
A
01/19/2022
Violation issued (HPD, closed)
A
01/19/2022
Violation issued (HPD, closed)
B
04/06/2021
Violation issued (HPD, closed)
B
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
12/08/2020
Violation issued (HPD, closed)
B
10/28/2019
Violation issued (HPD, closed)
I
09/26/2019
Violation issued (HPD, closed)
A
09/26/2019
Violation issued (HPD, closed)
C
09/26/2019
Violation issued (HPD, closed)
A
09/26/2019
Violation issued (HPD, closed)
B
09/26/2019
Violation issued (HPD, closed)
B
09/26/2019
Violation issued (HPD, closed)
B
10/12/2018
Violation issued (HPD, closed)
I
11/14/2017
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
03/08/2016
Violation issued (HPD, closed)
B
10/05/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
09/24/2014
Violation issued (HPD, closed)
B
09/24/2014
Violation issued (HPD, closed)
B
09/24/2014
Violation issued (HPD, closed)
C
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDWAGNER ZIV PLUMBING & HTG05/15/2003
BISPLISSUEDASIGMA PLBG. & HTG. INC.09/07/2002
BISOTISSUEDQUICK FIX CONTRACTORS CORP.08/14/2002
1 project · most recent 02/22/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/22/2023——Gas, Water/Sanitary
1 project · most recent 03/24/2023
FiledStatusContractorScope
03/24/2023Permit IssuedOMD ELECTRICAL CORP5 meters, 1 new_meters
1 project · most recent 02/22/2023
Steel
FiledStatusContractorScope
02/22/2023——Steel
1 project · most recent 02/22/2023
Fence
FiledStatusContractorScope
02/22/2023——Fence
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/11/2023Fire-Resistant Penetrations and JointsJose Santosspecial
01/11/2023Structural Stability – Alterations of existing buildingsJose Santosspecial
01/11/2023Structural Steel - DetailsJose Santosspecial
01/11/2023FinalJuan Ramosprogress
01/11/2023Energy Code Compliance InspectionsJose Santosprogress
01/11/2023Air barrier - visual inspectionJose Santosenergy_progress
01/11/2023Fenestration areasJose Santosenergy_progress
01/11/2023Fenestration and door U-factor and product ratingsJose Santosenergy_progress
01/11/2023Interior lighting powerJose Santosenergy_progress
01/11/2023Insulation placement and R valuesJose Santosenergy_progress
01/11/2023Lighting controlsJose Santosenergy_progress
01/11/2023Fire-Resistant Penetrations and JointsJose Santosspecial
01/11/2023Energy Code Compliance InspectionsJose Santosprogress
01/11/2023HVAC-R and service water piping design and insulationJose Santosenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026X00810984-S2Request digital key ↗
08/15/2026X00810984-I1Request digital key ↗
08/14/2026X00810984-S1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026X00810984-S2Open ↗
08/23/2026X00810984-S1Open ↗
08/23/2026X00810984-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026X00810984-I1Open ↗
08/23/2026X00810984-S1Open ↗
08/23/2026X00810984-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026X00810984-I1Open ↗
08/23/2026X00810984-S1Open ↗