← Back
Three families
2404 BATHGATE AVENUE
BRONX · BIN 2011726
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
3,048 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸
Three families · Owner of record: 2404 BATHGATE AVENUE LLC · 1,800 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
General
Cellar2p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
703 E187TH REALTY CORP903/22/2026
2404 BATHGATE AVENUE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2021$760K—Private party → 2404 BATHGATE AVENUE LLC$249/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FREDA DESIGN ARCHITECT, PLLC306/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L.L.G. PLBG & HTG INCPlumbing107/08/2026
Building Lifecycle
All (36)Filed (3)Permit Issued (1)Signed Off (1)Violation (24)Inspection (4)Special Inspection (3)
04/29/2026
Violation issued (HPD, open)
A
03/13/2026
Signed off — Alteration
replace existing oil burner boiler with 3 new gas boilers and 3 indirect hot water heaters
X01157007-I1
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Filed — Alteration
replace existing oil burner boiler with 3 new gas boilers and 3 indirect hot water heaters
X01157007-P2
06/04/2025
Violation issued (HPD, open)
A
06/02/2025
Filed — Alteration
replace existing oil burner boiler with 3 new gas boilers and 3 indirect hot water heaters
X01157007-P1
05/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Antonio Freda
05/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Antonio Freda
05/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Antonio Freda
05/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/27/2024
Permit issued — Plumbing
X01157007-I1-PL
12/18/2024
Filed — Alteration
replace existing oil burner boiler with 3 new gas boilers and 3 indirect hot water heaters
X01157007-I1
11/22/2024
Violation issued (HPD, open)
I
04/02/2024
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, open)
I
03/16/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, open)
I
02/16/2022
Violation issued (HPD, open)
A
04/02/2021
Violation issued (HPD, open)
A
10/02/2015
Violation issued (HPD, closed)
I
11/19/2013
Violation issued (HPD, closed)
B
11/19/2013
Violation issued (HPD, closed)
B
11/19/2013
Violation issued (HPD, closed)
B
11/19/2013
Violation issued (HPD, closed)
C
11/19/2013
Violation issued (HPD, closed)
B
11/19/2013
Violation issued (HPD, closed)
B
11/19/2013
Violation issued (HPD, closed)
B
11/19/2013
Violation issued (HPD, closed)
B
11/19/2013
Violation issued (HPD, closed)
A
11/19/2013
Violation issued (HPD, closed)
B
10/28/2013
Violation issued (HPD, closed)
B
10/28/2013
Violation issued (HPD, closed)
B
10/28/2013
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC12/27/2024
1 project · most recent 06/18/2025
FiledStatusContractorScope
06/18/2025Permit IssuedDOMINICK QUARANTA4 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/28/2025HVAC-R and service water piping design and insulationAntonio Fredaenergy_progress
05/28/2025HVAC-R and service water heating equipmentAntonio Fredaenergy_progress
05/28/2025HVAC-R and service water heating system controlsAntonio Fredaenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026X01157007-P2Request digital key ↗
08/19/2026X01157007-P1Request digital key ↗
08/19/2026X01157007-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026X01157007-P1Open ↗
08/13/2026X01157007-I1Open ↗
08/13/2026X01157007-P2Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026X01157007-P1Open ↗
08/30/2026X01157007-P1Open ↗
08/30/2026X01157007-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026X01157007-I1Open ↗
08/13/2026X01157007-P2Open ↗
08/13/2026X01157007-P1Open ↗