ECB04/27/2026FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITIONS. AS NOTED:-ATTIME OF INSPECTION OF AN OCCUPIED PARKING STRUCTURES CONSISTING OF 02 LEVELS. OBSERVED CELLAR LEVEL OCCUPIED AS A PARKING GARAGE AND OBSERVE$2K due
ECB01/22/2026FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER. NOTED; AT TIME OF INSPECTION GARAGE HAS BEEN OBSERVED STILL BEING OCCUPIED WITH SEVERAL VEHICLES WHILE VACATE ORDER STILL BEING IN PLACE. PARTIAL VACATE ORD$10K due
DOB01/14/2026EWO. OCCUPIED PARKING STRUCTING 1 CELLAR LVL. SPALLED,CRACKED CONCRETE ENCASEMENT, SLAB, COLUMN EXPOSED,FALLEN,CORRODED STEEL REBARS.DETERIOR FLOORING CAUSING AN IMMEDIATE HAZARD TO VEHICULAR & PEDESTRIAN TRAFFIC REQURING IMMEDIATE SAFETY MEASURES. REMEDY:OWNER TO RETAIN A NYS REG DESIGN PROF TO DIRECT/SUPV INSTALLATION OF SAFETY MEASURES
ECB01/14/2026FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION. NOTE: AT TIMEOF INSPECTION ON AN OCCUPIED PARKING STRUCTURE CONSISTING OF 1 CELLAR LEVEL, OBSERVED SPALLED-CRACKED CONCRETE(SLAB, BEAMS, COLUMNS), SEVERL$2K due
DOB09/27/2024FAILURUE TO MAINTAIN BLDG IN A SAFE CONDITION.FEU OBSERVE THAT THE CONCRETE ENCASEMNT WERE CRCKD EXPOSNG THE STEEL.LOOSE REBARS&REMAINING SPALLD CONCRETE PRESENT OVERHEAD HAZARDS.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343780 (070924FEU01ZT) TO REPAIR BUILDING UNDER PERMIT
DOB07/09/2024FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.FEU OBSERVED THAT THE CONCRETE ENCASMNT WERE CRCKD EXPOSNG THE STEEL.LOOSE REBARS&REMAINING SPALLD CONCRETE PRESENT OVERHEAD HAZARDS.VACATE ENTIRE PRKNG GARAGE OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DTRMNE THE STRCTRL STBILITY,&PREPARE/FILE DWGS
ECB10/24/2024FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMENTING THE CONDITIONS OF PSID#X0006076 BY THE AUGUST 1,2024 DEADLINE.TO DATE,THE DEPARTMENT HASNothing owed — awaiting certificate of correction