← Back
Elevator apt, fireproof without stores
2124 VYSE AVENUE
BRONX · BIN 2013266
💬 Discuss this project
1998Year Built
7Stories
D3Building Class
R7-1Zoning
69,300 sfGross Floor Area
99Units
56 Open Violations 43 unresolved · 13 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: CASELLA PLAZA HDFC · 31,340 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof5p · 1 filing · 8 docs
Floor 34p · 1 filing · 8 docs
Floor 21p · 1 filing · 8 docs
Floor 13p · 1 filing · 8 docs
Cellar2p · 1 filing · 8 docs
Basement4p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 2124 VYSE AVE203/22/2026
THE OWNER OF203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT305/12/2026
DNB ENGINEERING PLLC105/08/2026
Building Lifecycle
All (125)Filed (4)Violation (60)Objection (31)Special Inspection (30)
09/10/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
07/24/2026
Objection raised — Other
07/01/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Addressed
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Other
06/03/2026
Objection raised — Fire_Protection
06/03/2026
Objection raised — Accessibility
06/03/2026
Objection raised — Cost
06/03/2026
Objection raised — Other
06/03/2026
Objection raised — Energy
06/01/2026
Objection resolved — Addressed
05/28/2026
Objection resolved — Addressed
05/28/2026
Objection resolved — Addressed
05/28/2026
Objection resolved — Addressed
05/26/2026
Objection raised — Energy
05/26/2026
Objection raised — Scope
05/26/2026
Objection raised — Other
05/21/2026
Objection raised — Other
05/21/2026
Objection raised — Other
05/21/2026
Objection raised — Structural
05/21/2026
Objection raised — Structural
05/21/2026
Objection raised — Scope
05/21/2026
Objection raised — Structural
05/12/2026
Filed — Alteration CO
Proposed conversion of an existing 3 family dwelling to a 9 units multiple dwelling.
X01380430-S4
05/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/11/2026
Special inspection requirement — Maintenance information
05/08/2026
Filed — Alteration CO
Proposed conversion of an existing 3 family dwelling to a 9 units multiple dwelling.
X01380430-S3
05/08/2026
Filed — Alteration CO
Proposed conversion of an existing 3 family dwelling to a 9 units multiple dwelling.
X01380430-S1
05/07/2026
Special inspection requirement — Wood – Prefabricated I-Joists
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/05/2026
Special inspection requirement — Sprinkler Systems
05/05/2026
Special inspection requirement — Post-installed Anchors
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/04/2026
Special inspection requirement — Final
05/04/2026
Special inspection requirement — Post-installed Anchors
05/04/2026
Special inspection requirement — Ventilation and air distribution system
05/04/2026
Special inspection requirement — Permanent certificate
05/04/2026
Special inspection requirement — Maintenance information
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/04/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
05/04/2026
Special inspection requirement — Mechanical Systems
04/30/2026
Violation issued (HPD, open)
A
04/17/2026
Special inspection requirement — Final
03/31/2026
Filed — Alteration CO
Proposed conversion of an existing 3 family dwelling to a 9 units multiple dwelling.
X01380430-I1
03/30/2026
Special inspection requirement — Air barrier - visual inspection
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISEQISSUEDGREAT WATERPROOFING & CONSTRUCTI10/31/2001
BISOTISSUEDGREAT WATERPROOFING & CONSTRUCTI10/31/2001
1 project · most recent 03/24/2026
General Wiring
FiledStatusContractorScope
03/24/2026Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
1 project · most recent 05/12/2026
Wood
FiledStatusContractorScope
05/12/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/11/2026HVAC-R and service water heating system controls—energy_progress
05/11/2026HVAC-R and service water piping design and insulation—energy_progress
05/11/2026HVAC-R and service water heating equipment—energy_progress
05/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/11/2026Maintenance information—energy_progress
05/07/2026Wood – Prefabricated I-Joists—special
05/07/2026Structural Stability – Alterations of existing buildings—special
05/05/2026Sprinkler Systems—special
05/05/2026Post-installed Anchors—special
05/05/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Final—progress
05/04/2026Post-installed Anchors—special
05/04/2026Ventilation and air distribution system—energy_progress
05/04/2026Permanent certificate—energy_progress
05/04/2026Maintenance information—energy_progress
05/04/2026HVAC-R and service water piping design and insulation—energy_progress
05/04/2026Duct leakage testing, insulation and design—energy_progress
05/04/2026HVAC-R and service water heating equipment—energy_progress
05/04/2026HVAC-R and service water heating system controls—energy_progress
05/04/2026Energy Code Compliance Inspections—progress
05/04/2026Mechanical Systems—special
04/17/2026Final—progress
03/30/2026Air barrier - visual inspection—energy_progress
03/30/2026Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 34.
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026X01380430-I1Request digital key ↗
08/16/2026X01380430-S3Request digital key ↗
08/14/2026X01380430-S4Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026X01380430-S1Open ↗
08/16/2026X01380430-S3Open ↗
08/16/2026X01380430-S4Open ↗
Showing 3 of 4 on file for this type