← Back
Elevator apt, semi-fireproof without stores
2640 DAVIDSON AVENUE
BRONX · BIN 2014395
💬 Discuss this project
1931Year Built
5Stories
D1Building Class
R6Zoning
32,976 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized105 Open Violations 102 unresolved · 3 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: PE-GI GJO REALTY, · 7,524 sf lot · 4.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof2p · 1 filing · 3 docs
Bulkhead1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIRGEE CONSTRUCTION COMPANY1107/08/2026
MNS MANAGEMENT GROUP, INC.703/22/2026
PE-GI GJO REALTY403/22/2026
PE-GI GJO REALTY MNS MANA103/22/2026
MMS MANAGEMENT GROUP103/22/2026
RE-GIGJO REALTY LLC103/22/2026
M.N.S. MGMT CORP.103/22/2026
NEW CENTRA REALTY CORP103/22/2026
NEW CENTRA REALTY COR103/22/2026
SADHIA CONTRACTING GRP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AKM RAHMAN107/25/2025
MCHENERY TESTING LAB103/24/2025
FRENCH & PARRELLO ASSOCIATES203/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES303/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTEC NETWORK SOLUTIONS,General Contractor303/21/2026
SIRGEE CONSTRUCTION COMPANYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032107/25/2025
FRENCH & PARRELLO ASSOCIA1271103/14/2025
Building Lifecycle
All (81)Filed (5)Permit Issued (3)Signed Off (3)Violation (60)Objection (10)
05/18/2026
Violation issued (ECB, open)
Elevators
04/30/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, open)
B
03/31/2026
Violation issued (ECB, open)
Elevators
02/10/2026
Violation issued (HPD, closed)
C
02/10/2026
Violation issued (HPD, closed)
B
01/20/2026
Violation issued (HPD, closed)
A
01/20/2026
Violation issued (HPD, closed)
C
01/20/2026
Violation issued (HPD, closed)
C
11/26/2025
Signed off — Alteration
Modification to existing VERIZON site on the roof. Installation of 3 antennas and 1 equipment platform with related cabinets. Replacement of 6 antennas and 6 RRH units. Removal of 1 cabinet.
X00815277-I1
11/06/2025
Signed off — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01263527-I1
10/31/2025
Signed off — Alteration
X01259352-I1
09/30/2025
Violation issued (ECB, closed)
Construction
09/30/2025
Violation issued (ECB, closed)
Construction
09/30/2025
Violation issued (ECB, closed)
Construction
09/15/2025
Violation issued (HPD, closed)
C
09/09/2025
Permit issued — Antenna
X00815277-I1-AN
09/09/2025
Violation issued (ECB, closed)
Construction
09/08/2025
Permit issued — General Construction
X01259352-I1-GC
08/06/2025
Violation issued (HPD, open)
C
08/06/2025
Violation issued (HPD, closed)
A
08/06/2025
Violation issued (HPD, closed)
A
08/06/2025
Violation issued (HPD, closed)
B
08/06/2025
Violation issued (HPD, closed)
A
08/06/2025
Violation issued (HPD, closed)
A
08/05/2025
Permit issued — Suspended Scaffold
X01263527-I1-SC
08/02/2025
Objection resolved — Addressed
07/31/2025
Filed — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01263527-I1
07/31/2025
Objection raised — Admin
07/25/2025
Filed — Alteration
X01259352-I1
06/25/2025
Violation issued (HPD, closed)
C
03/24/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
X01200080-I1
03/18/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2025
Violation issued (ECB, open)
Construction
03/17/2025
Violation issued (ECB, open)
Construction
03/14/2025
Filed — Alteration
Modification to existing VERIZON site on the roof. Installation of 3 antennas and 1 equipment platform with related cabinets. Replacement of 6 antennas and 6 RRH units. Removal of 1 cabinet.
X00815277-I1
01/07/2025
Violation issued (HPD, closed)
A
01/07/2025
Violation issued (HPD, open)
C
01/07/2025
Violation issued (HPD, open)
C
01/07/2025
Violation issued (HPD, closed)
C
01/07/2025
Violation issued (HPD, closed)
C
01/07/2025
Violation issued (HPD, closed)
A
01/07/2025
Violation issued (HPD, closed)
C
01/07/2025
Violation issued (HPD, open)
C
01/07/2025
Violation issued (HPD, closed)
C
01/07/2025
Violation issued (HPD, open)
C
01/07/2025
Violation issued (HPD, closed)
A
01/07/2025
Violation issued (HPD, open)
C
01/07/2025
Violation issued (HPD, closed)
A
01/06/2025
Violation issued (HPD, closed)
C
01/06/2025
Violation issued (HPD, closed)
C
01/06/2025
Violation issued (HPD, closed)
C
01/06/2025
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (HPD, closed)
C
08/12/2024
Violation issued (HPD, closed)
B
08/12/2024
Violation issued (HPD, closed)
B
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offMASTEC NETWORK SOLUTIONS,09/09/2025
DOB NOWGeneral ConstructionSigned-offSIRGEE CONSTRUCTION COMPA09/08/2025
DOB NOWSuspended ScaffoldSigned-offRH EXPERT CORP08/05/2025
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/01/2015
BISBLISSUEDR&M COMBUSTION03/16/1990
2 projects · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026Permit IssuedJAM ELECTRICAL CORP—
06/04/2025Permit IssuedRNH ELECTRIC COMPANY INCGeneral Wiring
1 project · most recent 03/24/2025
Sidewalk Shed
FiledStatusContractorScope
03/24/2025——Sidewalk Shed
Nothing on file for this building.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026X00896438-I1Request digital key ↗
08/20/2026X00815277-I1Request digital key ↗
08/19/2026X01200080-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
05/30/2023220474314Open ↗
09/22/2015220474314Open ↗
08/31/2015220474314Open ↗
▸BISWORK PERMIT APPLICATION1
10/02/2015220474314Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026X01259352-I1Open ↗
08/13/2026X01200080-I1Open ↗
08/13/2026X00815277-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/31/2015220474314Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
09/22/2015220474314Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X00815277-I1Open ↗
08/13/2026X00896438-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/31/2015220474314Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/31/2015220474314Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/22/2015220474314Open ↗
08/31/2015220474314Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/31/2015220474314Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026X01263527-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01263527-I1Open ↗