← Back
Three families
2117 GRAND AVENUE
BRONX · BIN 2014480
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R7-1Zoning
3,564 sfGross Floor Area
3Units
Rent Stabilized47 Open Violations ▸
Three families · 3,000 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof3p · 2 filings · 16 docs
Bulkhead1p · 1 filing · 12 docs
Floor 81p · 1 filing · 12 docs
Floor 71p · 1 filing · 12 docs
Floor 61p · 1 filing · 12 docs
Floor 51p · 1 filing · 12 docs
Floor 41p · 1 filing · 12 docs
Floor 31p · 1 filing · 12 docs
Floor 22p · 1 filing · 4 docs
Floor 12p · 2 filings · 16 docs
1 job · most recent 09/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXF12AXVJU 13,500 BTU · Split System ×5
RXF18AXVJU 21,600 BTU · Split System ×2
RZA18AAVJU 20,000 BTU · Split System ×1
Ventilation
Renewaire HE07RT Erv ×1
1 job · most recent 09/08/2026
Sprinkler System
FiledStatusContractorScope
09/08/2026——Sprinkler System
1 job · most recent 09/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/08/2026——Gas, Storm, Water/Sanitary
1 job · most recent 09/08/2026
Concrete
FiledStatusContractorScope
09/08/2026——Concrete
1 job · most recent 07/14/2026
Fence
FiledStatusContractorScope
07/14/2026——Fence
Building Lifecycle
All (95)Filed (6)Violation (50)Objection (9)Special Inspection (30)
09/14/2026
Objection resolved — Resolved
09/14/2026
Objection resolved — Open
09/14/2026
Objection resolved — Addressed
09/09/2026
Objection raised — Other
09/09/2026
Objection raised — Other
09/09/2026
Objection raised — Other
09/08/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN CONJUNCTION TO NB FILING #X01424235-I1
X01424235-S6
09/07/2026
Special inspection requirement — Sprinkler Systems
09/07/2026
Special inspection requirement — Post-installed Anchors
09/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN CONJUNCTION TO NB FILING #X01424235-I1
X01424235-S1
09/03/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN CONJUNCTION TO NB FILING #X01424235-I1
X01424235-S3
09/01/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
09/01/2026
Special inspection requirement — Subgrade Inspections
09/01/2026
Special inspection requirement — Concrete - Cast-In-Place
09/01/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
09/01/2026
Special inspection requirement — Masonry
09/01/2026
Special inspection requirement — Post-installed Anchors
09/01/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
09/01/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/01/2026
Special inspection requirement — Concrete - Cast-In-Place
08/31/2026
Special inspection requirement — Footing and Foundation
08/31/2026
Special inspection requirement — Final
08/31/2026
Special inspection requirement — Final
08/19/2026
Objection resolved — Resolved
08/07/2026
Objection raised — Other
08/03/2026
Objection raised — Other
07/24/2026
Filed — Full Demolition
Full demolition of a three (3) story building.
X01432200-I1
07/16/2026
Special inspection requirement — Demolition
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
07/14/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE
X01429190-I1
07/02/2026
Filed — New Building
SUBSEQUENT FILING FOR STRUCTURAL WORK IN CONJUNCTION TO NB FILING #X01424235-I1
X01424235-I1
06/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/30/2026
Special inspection requirement — Insulation placement and R values
06/30/2026
Special inspection requirement — Air barrier — testing
06/30/2026
Special inspection requirement — Lighting in dwelling units
06/30/2026
Special inspection requirement — Interior lighting power
06/30/2026
Special inspection requirement — Fenestration air leakage
06/30/2026
Special inspection requirement — Maintenance information
06/30/2026
Special inspection requirement — Air barrier - visual inspection
06/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/30/2026
Special inspection requirement — Lighting controls
06/30/2026
Special inspection requirement — Metering
06/30/2026
Special inspection requirement — Exterior lighting power
06/30/2026
Special inspection requirement — Fenestration areas
04/30/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
04/02/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
03/17/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, open)
I
02/17/2022
Violation issued (HPD, open)
I
02/17/2022
Violation issued (HPD, open)
A
04/02/2021
Violation issued (HPD, open)
A
04/02/2021
Violation issued (HPD, open)
I
10/28/2019
Violation issued (HPD, open)
I
10/11/2018
Violation issued (HPD, open)
I
11/13/2017
Violation issued (HPD, open)
I
Latest 60 of 95 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MS INVESTMENTS 3509/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE109/08/2026
ELEVATED ENGINEERING NYC209/03/2026
ADROIT ENGINEERING PLLC107/24/2026
KMA DESIGNS LLC207/14/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
09/07/2026Sprinkler Systems—special
09/07/2026Post-installed Anchors—special
09/07/2026Fire-Resistant Penetrations and Joints—special
09/01/2026Construction Operations Influencing Adjacent Structures—special
09/01/2026Subgrade Inspections—special
09/01/2026Concrete - Cast-In-Place—special
09/01/2026Construction Operations Influencing Adjacent Structures—special
09/01/2026Masonry—special
09/01/2026Post-installed Anchors—special
09/01/2026Subsurface Conditions – Fill Placement & In-Place Density—special
09/01/2026Subsurface Investigations (Borings/Test Pits)—special
09/01/2026Concrete - Cast-In-Place—special
08/31/2026Footing and Foundation—progress
08/31/2026Final—progress
08/31/2026Final—progress
07/16/2026Demolition—special
07/16/2026Structural Stability – Alterations of existing Buildings—special
06/30/2026Fire-Resistance Rated Construction—progress
06/30/2026Insulation placement and R values—energy_progress
06/30/2026Air barrier — testing —energy_progress
06/30/2026Lighting in dwelling units—energy_progress
06/30/2026Interior lighting power—energy_progress
06/30/2026Fenestration air leakage—energy_progress
06/30/2026Maintenance information—energy_progress
06/30/2026Air barrier - visual inspection—energy_progress
Latest 25 of 34.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026X01424235-I1Request digital key ↗
08/14/2026X01432200-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026X01424235-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/15/2026X01424235-S4Open ↗
09/15/2026X01424235-S5Open ↗
09/15/2026X01424235-S6Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
09/15/2026X01424235-S1Open ↗
09/15/2026X01424235-S2Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/15/2026X01424235-I1Open ↗
▸DOB NOWStructure Photographs1
08/14/2026X01432200-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026X01432200-I1Open ↗